Problem solving:
1. Find the sample size if the population size is 500 at 95 % accuracy.
n = 500, e = 5%
N 500
n= 2
n= 2 = 222.22
1+ N e 1+500( 0.05)
n = 1,300, e = 2%
N 1300
n= n= = 855.26 or 855.3
1+ N e 2
1+1300(0.0 2)2
3. A researcher is conducting investigation regarding the factors affecting the efficiency of the 210
faculty members of a certain University. If he wanted to have a margin of error of 4%. then how many of
the faculty members should be taken as respondent.
n = 210, e = 4%
N 210
n= 2
n= 2 = 157.18 or 157.2
1+ N e 1+210 (0.0 4)
4. Consider the following measurements: X1=13; X2= 17; X3= 10; X4= 11; X5= 16 Y1= 14; Y2= 16;
Y3= 13; Y4= 9; Y5= 18 Determine the value of the following expression
(a) Summation of the fifth X1 and
5
∑ x 1 = x +x +x +x +x
1 2 3 4 5
i=1
∑ x 1 = 13+17+10+11+16 = 67
i=1