Professional Documents
Culture Documents
FAS2020 System Installation and Setup Hardware
FAS2020 System Installation and Setup Hardware
FAS2020 System
Installation and Setup
1 Before you begin 2 Unpack and verify contents
Your system comes with an accessory kit that includes the following components:
If you have not already done so, gather the required information and confirm your site
requirements, as described in the Site Requirements Guide at http://now.netapp.com/. - This installation poster - Power cables
- Software license flyer - DB-9 to RJ-45 console adapters
- Grounding kit - Rail kit (for two-post and four-post racks)
3 Install in rack Caution: Use only the NetApp® rail kit to install your system. Using a different rail kit can cause injury to you or damage to your system.
Four-post rack
(2x)
2U
3U
3U
(2x) 1
Front rail
(2x)
1
Clip nut (4x)
FRONT Mounting
SIDE
bracket
(2x)
0
Shelf ID
switch
Fibre DS14
OUT IN
DS14
OUT IN
DS14 DS14
8 OUT IN
DS14
Ethernet OUT IN
PSU PSU OUT IN
PSU PSU IN OUT
IN OUT PSU PSU
IN OUT
3 Network cables to e0a and e0b ports PSU Controller Module B PSU
FAS2020
0a 0b 10101 e0a e0b 0a 0b 10101 e0a e0b
PSU PSU
Controller Module B
0a 0b e0a e0b 0a 0b 10101 e0a e0b
DS14
OUT IN
8 IN OUT
PSU PSU
IN OUT
DS14
OUT IN DS14
OUT IN
PSU PSU
IN OUT PSU PSU
IN OUT
3 Shelf to controller
4 Network cable to Remote Management port
FAS2020
0a 0b 10101 e0a e0b
8 8
DS14
OUT IN
PSU PSU
IN OUT
DS14
210-03961+D0
OUT IN
PSU PSU
IN OUT