For : E
E LT = 2
Lot size:
Gross Lot-for-Lot
requirements
Scheduled receipts
Projected on hand
Net requirements
Planned-order receipts
Planned-order releases
B(2) LT = 2
Lot size: Multiples of 120
Gross requirements
Scheduled receipts
Projected on hand
Net requirements
Planned-order receipts
Planned-order releases
Item E
Ending Inventory
Item B
Ending Inventory
Item J
Ending Inventory
Week 1 2 3 4 5 6
Quantity 80
LT = 2 Beg.
1 2 3 4 5 6
Inv.
Lot-for-Lot
quirements 80
ed receipts
d on hand 0 0 0 0 0 0 0
irements 80
-order receipts 80
-order releases 80
LT = 2 Beg.
Inv. 1 2 3 4 5 6
Multiples of 120
quirements 160
ed receipts
d on hand 60 60 60 60 60 20 20
irements 100
-order receipts 120
-order releases 120
4) LT=1 Beg.
1 2 3 4 5 6
Multiple of 30 Inv.
quirements 480 240
ed receipts 30 30 30
d on hand 20 20 20 50 80 50 50
irements 460 160
-order receipts 480 180
-order releases 480 180
E LT = 2 Beg.
4 5 6
Inv.
Lot size:
Gross Lot-for-Lot
requirements 70
Scheduled receipts
Projected on hand 0 0 0 0
Net requirements 70
Planned-order receipts 70
Planned-order releases 70
B(2) LT = 2 Beg.
Inv. 4 5 6
Lot size: Multiples of 120
Gross requirements 140
Scheduled receipts 120
Projected on hand 60 180 40 40
Net requirements
Planned-order receipts
Planned-order releases
B = 40 -
20 = 20 units
J=
80-50 = 30 units
Week 1 2
Master Schedule
For : A Quantity
A LT = 1 Beg.
1 2
Inv.
Lot size:
Gross Lot-for-Lot
requirements
Scheduled receipts
Projected on hand 0 0 0
Net requirements
Planned-order receipts
Planned-order releases
Week 1 2
Master Schedule
For : B Quantity
B LT = 1 Beg. 1 2
Inv.
Lot size:
Gross Lot-for-Lot
requirements
Scheduled receipts
Projected on hand 10 10 10
Net requirements
Planned-order receipts
Planned-order releases
Week 1 2
Master Schedule
For : C Quantity
C LT = 2 Beg. 1 2
Inv.
Lot size:
Gross Lot-for-Lot
requirements
Scheduled receipts
Projected on hand 10 10 10
Net requirements
Planned-order receipts
Planned-order releases
3 4 5 6
40
0 0 0 0
40
40
40
3 4 5 6
60
3 4 5 6
60
10 10 10 0
50
50
50
3 4 5 6
30
3 4 5 6
30
10 10 10 10
20
20
20
3 4 5 6
40 180
125 85 5 5
95
100
100
Quantity/
Level Bill of Material
BOM parents A
0 A 1
1 B1 2 B1(2) B2(4)
122 (5) 1 B2 4
Order Safety
Item On Hand Inventory
On Order Due date Lead Time Alocated
Quantity Stock
A LFL 300 0 0 2 0 25
B1 400 350 400 Week 2 2 0 0
B2 800 400 800 Week 2 3 0 0
A 10 3 45 4
B1 10 2 40 2
20 3 25 3
B2 10 1 80 5
20 3 50 4
30 2 40 3
Available
Work Utilization Efficiency Planned
Center Queue
(minutes)
1 4,800 90% 90% 2 days
2 4,800 80% 90% 2 days
3 4,800 90% 90% 4 days
· Master Production Schedule (MPS) for Part A
Week
1 2
Quantity 120 90
WC BOLA (menit)
1 8.575
2 26.525
3 21.350
WC 1 2
1 1,029.00 771.75
2 3,183.00 2,387.25
3 - -
Qty/Pare
Total BOLA
nt
1 4.375
2 4.200 8.575
2 6.125
4 20.400 26.525
4 12.200
3 9.150 21.350