Professional Documents
Culture Documents
October 29 Weekly Status
October 29 Weekly Status
Design the PCB and sensors for the flight control unit for the Auburn University Rocketry Association’s 2022 Competition Rocket competing in NASA’s University
Launch Initiative.
TASK STATUS - VISUAL
(1) Show the updated Gantt Chart or similar
Accomplishmen
ts since last status report:
Successfully compiled the sensor library for BMX 160, and partially compiled library for MS5607. A prototype board has been created with the two sensors and a
Raspberry Pi 0 for testing the I2C communication scheme between the devices. We have successfully completed writing our section of the PDR as well.
● Testing has shown that there is a remote I/O error during I2C read operations, meaning that the computer cannot successfully log data from the sensors.
Troubleshooting has begun from both a software and hardware approach. We are lagging in development of a communication protocol for the radio and
GPS. The software for the MS5607 altimeter has several bugs which are difficult to interpret.
Our team is becoming overwhelmed by the workload based on the deadlines we are facing from AURA - we have had to work overtime in addition to our normal
schedules.
With eight people, we cannot find a consistent meeting time for us all - we are having a hard time using our additional team members to effectively reduce the
workload due to the amount of software construction during this phase of the project
● Complete software construction for data logging for test launch on November 6th
Comments: