Professional Documents
Culture Documents
No Project : MENAIKTARAF STRUKTUR KAWALAN SALIRAN DAN PASANG SURUT DI KAWASAN PENGAIRAN BARAT LAUT, SABAK BERNAM DAN KUALA SELANGOR, SELANGOR Ref
SELECTION MAIN INCOMING TOTAL LOAD 2.10 0.80 1.68 1.00 4.42
CIRCUIT BREAKER ADDITIONAL 20% SPARE 2.52 0.80 2.02 5.30 MCCB 30
Phase Distribution herein defined as the supply phase of the equipment of the item in accordance to the circuit number in the schematic. Following are the acorynm used
1) to defined the phase distribution:
1
LAMPIRAN E2.1 Job No Reference No Rev
MAXIMUM DEMAND & BREAKER SIZING 1 HZ/JPM/SB/08/20/E2 2
JURUTERA PERUNDING MEGA TIDAL GATE OUTLET STRUCTURE Design By : HZ M&E CONSULTANT
No Project : MENAIKTARAF STRUKTUR KAWALAN SALIRAN DAN PASANG SURUT DI KAWASAN PENGAIRAN BARAT LAUT, SABAK BERNAM DAN KUALA SELANGOR, SELANGOR Ref