You are on page 1of 6

DETAILS AS PER GREEN BUILDING CODE please refer to ANNEX A -TABLE 01 FOR MINIMUM TGFA REQUIREMENTS

FOR PERMIT REMARKS


ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION
NO
ARCHITECTURAL
1.0
1.1 CS CS-100 Coversheet
required unpaved surface are with indications or
1.2 CS-101 SITE DEVELOPMENT PLANS specifications callout Please see Annex G
1.3 ROOF PLAN and SRI Value Please see Annex B Figure 14
1.3.2 Technical Specification of the roofing product and
color with the manufacturer information on SRI Value
1.3.3 Minimum of R-8 thermal resistance value Please see Annex D
1.3.4 showing call-out of insulating material used and short
specification of roofing system Please see Annex B Figure 14
1.3.5 Building roof system Insulating computation table to
be included on roof plan sheet Please see Annex C table 9
2.0 WS WS-100 WALL SETTING-OUT PLAN
3.0
3.1 AF AF-100+ AS FOUND PLANS
3.2 AF-200+ AS FOND ELEVATIONS
3.3 AS FOUND SECTIONS

4.0
4.1 A-100 A-100 FLOOR PLANS 4.1 showing window ID tags
4.2 showing location of Day light provisions

4.3 showing location of MRF Please see Annex H, figure 89 showing MRF on plan
4.4 showing designated smoking area / or showing location
of no smoking signages
4.5 MRF floor area computation to be included in the
architectural plans Please see J , table 26 nd 25 for camputation of MRF
5.0 A-200
5.1.1 Dimension to be indicated as basis on calculation of
Wall Window Ratio Please see Annex E Figure No. 28
5.1.2 showing extent of windows and location of operable
windows with window ID tags Please see Annex E Figure No. 28
5.1 A-201 ELEVATIONS
5.1.3 reflect ID tags for finishes of floor, wall and ceiling Please see Annex E Figure No. 28

5.1.4 showing location of MRF Please see Annex H, figure 89 showing MRF on plan
factors Please see Annex F code reference 10.1.2
5.2.2 showing vertical location of operable windows Please see Annex F code reference 10.1.2
5.2.3 showing application of insulating material plus call-out
CROSS AND LONGITUDINAL of insulating material used Please see Annex E , Figure 12
SECTION
SECTION 5.2.4 showing daylight provisions such as windows, light
monitors, clerestorey, scoops, lightshelves, atrium, skylights
5.2.5 showing height and vertical location of the elevators,
5.2 A-200+ escalators, moving ramps and walkways.
5.3 A-200+ BAY WALL SECTIONS Please see Annex F Design Documentation
STAIR DETAILS
VEHICULAR/ PEDESTRIAN
RAMP DETAILS
ELEVATOR CORE DETAILS
CISTERN DETAILS
SEPTIC TANK DETAILS / STP
DETAILS showing location of STp with callout of capacities
CANOPY/ TRELLIS DETAILS

BUILDING CROWN DETAILS


LEDGE DETAILS

BALCONY RAILING DETAILS

TRANSFORMER ROOM DETAILS


GENSET ROOM DETAILS
MRF ROOM DETAILS computed Please see J , table 26 nd 25 for camputation of MRF
MRF shall be fully enclosed and easily accessible within the
building and from the outside for easy collection of waste Please see Annex H, figure 89 showing MRF on plan
with solid waste containers

RAIN WATER TANK DETAILS minimum storage for 75% for building foot print
6.0 A-300 A-300+ BASIC INTERIOR PLANS

RECEPTION COUNTER DETAILS


MAIL BOX DETAILS
HALLWAY DETAILS

ELECTRICAL-MECHANICAL
7.0 EM EM 100+ PLANS

8.0
8.1.1 showing under legend box type of lamp with wattage
8.1 A-400 REFLECTED CEILING PLANS 8.1.2 showing location of occupancy sensors
CEILING TERMINATION
8.2 DETAILS

9.0
9.1.1 include finishes for ceiling, walls and floor showing
SCHEDULE OF FINISHES / materials used in the design with reference to the table of Please see Annex K table 23 for VOC limit per material and
9.1 A-500 ROOM FINISH SCHEDULE VOC limits. Annex L table 24
Please see Annex R showing sample room finish schedule
Please see Annex F Figure 17 showing vapor barrier on
9.2 WALL SCHEDULE 9.2.1 reflect vapor/ moisture barrier details
9.3 DOOR SCHEDULE 9.3.1 reflect weather stripping
9.4 9.4.1 indicate dimensions , type and glass to be used
9.4.2 Include operable window area computation in the
first sheet of window schedule
WINDOW SCHEDULE 9.4.3 reflect weather stripping
9.4.4 10 % of floor area should be minimum required
operable window area
9.4.5 Double glazed on west side window specifications

9.5 DOOR TERMINATION DETAILS 9.5.1 reflect weather stripping


9.6.1 Sealed window and door assemblies
WINDOW TERMINATION 9.6.2 showing detailed application of operable windows
DETAILS features
9.6
WALL AND FLOOR floor Please see Annex F Design Documentation
9.7 TERMINATION DETAILS 9.7.2 Reflect joint sealer
9.8.1 water/ vapor barrier, water proofing membrane, joint
fillers and sealants, fillers, air tightnes tape, weather
WATERPROOFING DETAILS stripping, gaskets, door bottom sweeps, flashing and other Technical specifications from manufacturer's for airtight/
9.8 sealing devices vapor barrier and sealing products

10.0 A-600 UNIT PLANS

11.0 A-700 MISCELLANEOUS DETAILS


TOILET DETAILS

TOILET TERMINATION DETAILS


KITCHEN CABINETD ETIALS
WALK-IN CLOSET DETAILS
PLANT BOX DETAILS
PARKING SLOT DETAILS
Others area.

12.0 TECHNICAL SPECIFICATION


12.1.1 detailed specification of the roofing product and
12.1 ROOF color with manufacturer SRI value certification
12.1.2 Metal roof surface shall either be colored white or
have aminimum SRI of 70

12.2.1 insulating material specifications and manufacturer


12.2 INSULATION certification details
12.3.1 Technical specifications of lighting equipment from
12.3 LIGHTING EQUIPMENTS manufacturers
12.4 ELEVATORS To incorporate in specifications: Please see Annex Q.1 and Q.2 foe Elevator requirements
12.4.1 Use of Alternating Currect (AC) Varaible Voltage
and Variable frequency drives on non-hydraulic elevators
12.4.2 Use of energy efficient lighting and display lighting ,
average lamp efficacy of 55 lumens per watt
12.4.3 Lighting shall switch -off after the elevator has been
inactive for a maximum period of 5 minutes.
12.4.4 Elevator shall operate in a standby condition during
off-peak periods

12.5.1 Technical specifications of the applicable material


12.5 GENERAL indicating compiance with the requirement.
12.6 VEGETATION 12.6.1 technical specification of vegetation to be used
12.7 MRF 12.7.1 Technical specifications of MRF

Technical specification from manufacturer for airtight/


12.8 MOISTURE BARRIER vapor barrier and sealing products.

2.0 MECHANICAL

ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO

2.1.1 showing the different properties of the cooling


equipment, including the efficiency rating, represented by
2.1 EER, Kw/ton or COP
2.1.2 showing variable speed drive , capacity and Please SEE Annex P showing the sample riser diagram using
efficiency rating VSD , figure 45 & 46
equipment, its properties and capacities,and efficiency
rating
2.1.4 Showing the equipments used for ventilation
EQUIPMENT SCHEDULE indicating capacities and air flow.
AIRCONDITIONING AND 2.2.1 Schematic diagram showing the location of the
2.2 VENTILATING LAY-OUT cooling equipment with equipment ID tag
2.3.1 showing location of air conditioning and ventilating
equipment with the ID callout that is reference to the
2.3 equipment schedule
TECHNICAL SPECIFICATIONS 2.3.2 include expected efficiency rating
2.4 Others 2.4.1 Required ventilation rates computation (refer to code)

3.0 ELECTRICAL

ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
3.1.1 showing location of water heating equipment and
call-out of capacities
3.1.2 circuitry showing inclusion of photosensors, daylight
3.1 ELECTRICAL POWER LAY-OUT controller and accessories.
LIGHTING CONTROL 3.2.1 showing inclusion of phtosensors and daylight
3.2 DRIAGRAM controller system
ELECTRICAL LIGHTING LAY- lighting fixtures as the specific type and wattage under
3.3 OUT LEGEND Box
3.4.1 Building Lighting Power Density computation to be
included in electrical plans
3.4.2 Technical specifications of lighting equipment from
3.4 TECHNICAL SPECIFICATIONS manufacturers

4.0 PLUMBING

ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
4.1.1 Showing water heating equipment, properties,
capacities and effieciency rating
4.1 EQUIPMENT SCHEDULE
4.1.2 Showing variable speed drive , capacity and
efficiency rating
4.2.1 Showing location of water heating equipment and
call-out of capacities
4.2 PLUMBING LAY-OUT
Please see Annex M & N showing computation of
4.2.2 Rainwater Harvesting Storage Tank computation Rainwater harvesting
4.3.1 indicating full details and performance on the
designed water heating equipment, including
performance efficiency rating
4.3.2 technical specifictaions of Overhead water tank
4.3 TECHNICAL SPECIFICATIONS
4.3.3 technical specifictaions of water efficient fixtures
4.3.4 Technical specification of rainwater harvesting
storage
4.3.5 Technical Specifications of STP with narrative on
treatment and recycling operations
Provision of overhead water storage tank on top of building
4.4.1 Showing location and capacity callout of water tank atleast 10 stories high
4.4 WATER DISTRIBUTION LAYOUT
4.4.2 Showing location of water efficient fixtures with Please see Annex P & Q showing sample for plumbing
identification callout and legend box fixtures to be used
Please see Annex R .1& R.2showing sample of water tank
4.5.1 Showing provision of water tank with capacity callout details and and requirement
SINGLE LINE OR SCHEMATIC
4.5 4.5.2 water tank details
DIAGRAM
4.5.3 rainwater storage details
4.5.4 Sewage treatment plant details
WATER DISTRIBUTION 4.6.1 Showing location of water efficent fixtures with
4.6
ISOMETRIC identifictaion callout and Legend box
water efficent kitchen tap with aerator, shower head with
aerator, shower head with adjustable water spray, water
4.7 WATER EFFICIENT FIXTURES 4.7.1 To be included in the plumbing plans
efficent water closet with dula flush and water efficent
hand spray bidet.
STORM WATER DRAINAGE 4.8.1 showing location of rainwater harvesting storage tank minimum storage tank size shall be calcualted by dividing
4.8
LAYOUT with callout of capacities the building footprint area (square meters by 75)
STORM WATER DRAINAGE 4.9.1 showing location of rainwater harvesting storage tank
4.9
ISOMETRIES with callout of capacities
the recycled water produces on site shall be for non-
4.10.1 Showing location of sewage treatment plant (STP) or potable purposes such as toilet flushing, irrigation, and
4.10 SEWAGE SYSTEM PLAN cooling towers , through a distinct and a separate piping
waste water treatment
system from the potable water supply system.

4.11 SEWAGE SYSTEM ISOMETRY 4.11.1 Showing location of STP with callout of capacities

5.0 FIRE PROTECTION

ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
5.1.1 Showing equipment, properties, capacities and
effieciency rating
5.1 EQUIPMENT SCHEDULE
5.1.2 showing variable speed drive , capacity and
efficiency rating

6.0 OTHERS
SITE EROSION AND SEDIMENT CONTROL PLAN
ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
6.1.1 Showing strategies to prevent and control erosion and
SITE EROSION AND SEDIMENT
6.1 storm water run-off. Startegies shall be identified in plan
CONTROL PLAN
through indications and call-outs

6.2 TECHNICAL SPECIFICATION 6.1.2 In support of the sitre erosion plan

NOTE: Items in blue are case to case basis