4.1 A-100 A-100 FLOOR PLANS 4.1 showing window ID tags
4.2 showing location of Day light provisions
4.3 showing location of MRF Please see Annex H, figure 89 showing MRF on plan
4.4 showing designated smoking area / or showing location
of no smoking signages
4.5 MRF floor area computation to be included in the
architectural plans Please see J , table 26 nd 25 for camputation of MRF
5.0 A-200
5.1.1 Dimension to be indicated as basis on calculation of
Wall Window Ratio Please see Annex E Figure No. 28
5.1.2 showing extent of windows and location of operable
windows with window ID tags Please see Annex E Figure No. 28
5.1 A-201 ELEVATIONS
5.1.3 reflect ID tags for finishes of floor, wall and ceiling Please see Annex E Figure No. 28
5.1.4 showing location of MRF Please see Annex H, figure 89 showing MRF on plan
factors Please see Annex F code reference 10.1.2
5.2.2 showing vertical location of operable windows Please see Annex F code reference 10.1.2
5.2.3 showing application of insulating material plus call-out
CROSS AND LONGITUDINAL of insulating material used Please see Annex E , Figure 12
SECTION
SECTION 5.2.4 showing daylight provisions such as windows, light
monitors, clerestorey, scoops, lightshelves, atrium, skylights
5.2.5 showing height and vertical location of the elevators,
5.2 A-200+ escalators, moving ramps and walkways.
5.3 A-200+ BAY WALL SECTIONS Please see Annex F Design Documentation
STAIR DETAILS
VEHICULAR/ PEDESTRIAN
RAMP DETAILS
ELEVATOR CORE DETAILS
CISTERN DETAILS
SEPTIC TANK DETAILS / STP
DETAILS showing location of STp with callout of capacities
CANOPY/ TRELLIS DETAILS
RAIN WATER TANK DETAILS minimum storage for 75% for building foot print
6.0 A-300 A-300+ BASIC INTERIOR PLANS
ELECTRICAL-MECHANICAL
7.0 EM EM 100+ PLANS
8.0
8.1.1 showing under legend box type of lamp with wattage
8.1 A-400 REFLECTED CEILING PLANS 8.1.2 showing location of occupancy sensors
CEILING TERMINATION
8.2 DETAILS
9.0
9.1.1 include finishes for ceiling, walls and floor showing
SCHEDULE OF FINISHES / materials used in the design with reference to the table of Please see Annex K table 23 for VOC limit per material and
9.1 A-500 ROOM FINISH SCHEDULE VOC limits. Annex L table 24
Please see Annex R showing sample room finish schedule
Please see Annex F Figure 17 showing vapor barrier on
9.2 WALL SCHEDULE 9.2.1 reflect vapor/ moisture barrier details
9.3 DOOR SCHEDULE 9.3.1 reflect weather stripping
9.4 9.4.1 indicate dimensions , type and glass to be used
9.4.2 Include operable window area computation in the
first sheet of window schedule
WINDOW SCHEDULE 9.4.3 reflect weather stripping
9.4.4 10 % of floor area should be minimum required
operable window area
9.4.5 Double glazed on west side window specifications
2.0 MECHANICAL
ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
3.0 ELECTRICAL
ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
3.1.1 showing location of water heating equipment and
call-out of capacities
3.1.2 circuitry showing inclusion of photosensors, daylight
3.1 ELECTRICAL POWER LAY-OUT controller and accessories.
LIGHTING CONTROL 3.2.1 showing inclusion of phtosensors and daylight
3.2 DRIAGRAM controller system
ELECTRICAL LIGHTING LAY- lighting fixtures as the specific type and wattage under
3.3 OUT LEGEND Box
3.4.1 Building Lighting Power Density computation to be
included in electrical plans
3.4.2 Technical specifications of lighting equipment from
3.4 TECHNICAL SPECIFICATIONS manufacturers
4.0 PLUMBING
ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
4.1.1 Showing water heating equipment, properties,
capacities and effieciency rating
4.1 EQUIPMENT SCHEDULE
4.1.2 Showing variable speed drive , capacity and
efficiency rating
4.2.1 Showing location of water heating equipment and
call-out of capacities
4.2 PLUMBING LAY-OUT
Please see Annex M & N showing computation of
4.2.2 Rainwater Harvesting Storage Tank computation Rainwater harvesting
4.3.1 indicating full details and performance on the
designed water heating equipment, including
performance efficiency rating
4.3.2 technical specifictaions of Overhead water tank
4.3 TECHNICAL SPECIFICATIONS
4.3.3 technical specifictaions of water efficient fixtures
4.3.4 Technical specification of rainwater harvesting
storage
4.3.5 Technical Specifications of STP with narrative on
treatment and recycling operations
Provision of overhead water storage tank on top of building
4.4.1 Showing location and capacity callout of water tank atleast 10 stories high
4.4 WATER DISTRIBUTION LAYOUT
4.4.2 Showing location of water efficient fixtures with Please see Annex P & Q showing sample for plumbing
identification callout and legend box fixtures to be used
Please see Annex R .1& R.2showing sample of water tank
4.5.1 Showing provision of water tank with capacity callout details and and requirement
SINGLE LINE OR SCHEMATIC
4.5 4.5.2 water tank details
DIAGRAM
4.5.3 rainwater storage details
4.5.4 Sewage treatment plant details
WATER DISTRIBUTION 4.6.1 Showing location of water efficent fixtures with
4.6
ISOMETRIC identifictaion callout and Legend box
water efficent kitchen tap with aerator, shower head with
aerator, shower head with adjustable water spray, water
4.7 WATER EFFICIENT FIXTURES 4.7.1 To be included in the plumbing plans
efficent water closet with dula flush and water efficent
hand spray bidet.
STORM WATER DRAINAGE 4.8.1 showing location of rainwater harvesting storage tank minimum storage tank size shall be calcualted by dividing
4.8
LAYOUT with callout of capacities the building footprint area (square meters by 75)
STORM WATER DRAINAGE 4.9.1 showing location of rainwater harvesting storage tank
4.9
ISOMETRIES with callout of capacities
the recycled water produces on site shall be for non-
4.10.1 Showing location of sewage treatment plant (STP) or potable purposes such as toilet flushing, irrigation, and
4.10 SEWAGE SYSTEM PLAN cooling towers , through a distinct and a separate piping
waste water treatment
system from the potable water supply system.
4.11 SEWAGE SYSTEM ISOMETRY 4.11.1 Showing location of STP with callout of capacities
ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
5.1.1 Showing equipment, properties, capacities and
effieciency rating
5.1 EQUIPMENT SCHEDULE
5.1.2 showing variable speed drive , capacity and
efficiency rating
6.0 OTHERS
SITE EROSION AND SEDIMENT CONTROL PLAN
ITEM
SERIES SHEET NO DRAWING CONTENTS DESCRIPTION REMARKS
NO
6.1.1 Showing strategies to prevent and control erosion and
SITE EROSION AND SEDIMENT
6.1 storm water run-off. Startegies shall be identified in plan
CONTROL PLAN
through indications and call-outs