Attachment "A"
REGION / PMO : VIII Program No.: 1
PROJECT TITLE : CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA) Date : August 24, 2018
NAME OF SYSTEM/PROJECT : GIBUGA RIVER IRRIGATION SYSTEM
SYSTEM CATEGORY : NATIONAL IRRIGATION SYSTEM
PROJECT TITLE : IMPROVEMENT OF IRRIGATION FACILITIES
I. GENERAL INFORMATION
1. Project Location 6. Overall Project Cost Original Revised
a. Region VIII a. GOP 95,211,000.00 1
b. Province Leyte b. Loan Procceds
c. Municipality Mayorga c. Others (Equit, etc.)
d. District III Total 95,211,000.00
2. LOAN PROCEEDS
GIBUGA RIVER IRRIGATION SYSTEM
CY 2017 POW
Mac Arthur, Leyte
(BY FORCE ACCOUNT WORKS)
Attachment "G"
SUMMARY
I. ESTIMATED DIRECT COST
A. MATERIAL COST = -
B. LABOR COST = 570.00 per cu.m.
C. EQUIPMENT COST = -
TOTAL ESTIMATED DIRECT COST = 570.00 per cu.m.
HAULING COST
ITEM UNIT QUANTITY
BASE COST TOTAL
LABOR RENTAL
Cement bags 7.00 ### 98.56 176.33 2,234.89
Sand cu.m. 0.50 375.00 175.37 84.50 634.87
Gravel cu.m. 1.00 879.00 350.73 169.00 1,398.73
CWNails kgs 2.00 160.00 1.84 1.50 163.34
Tie Wires kgs 0.54 43.20 0.50 0.41 44.11
Coco F. Lumber bd.ft. 15.00 200.00 10.85 5.80 216.65
1/2"x4"x8' Plywood pcs 1.25 937.50 17.88 23.15 978.53
TOTAL ### 655.73 460.69 5,671.12
B. LABOR COST
1. Fabrication, placing and dismantling of forms
1.00 Carpenter @ 450.00 per day = 450.00
1.00 Laborer @ 285.00 per day = 285.00
Total = 735.00
Capability 4.50 cu.m./day
Labor Cost = 163.33
2. Concreting and Curing
a With concrete mixer
1.00 Foreman @ 550.00 per day = 550.00
2.00 Mason @ 500.00 per day = 1,000.00
8.00 Laborer @ 285.00 per day = 2,280.00
Total = 3,830.00
Capability 4.50 cu.m./day
Labor Cost = 851.11
C. EQUIPMENT COST
Capability 4.50 cu.m./day
Rental = 172 per hr. x 8.00 hrs/day
= 305.78
4.50 cu.m./day
SUMMARY
I. ESTIMATED DIRECT COST
A. MATERIAL COST = 4,554.70
B. LABOR COST = 1,670.17
C. EQUIPMENT COST = 766.47
TOTAL ESTIMATED DIRECT COST = 6,991.34
HAULING COST
ITEM UNIT QUANTITY
BASE COST TOTAL
LABOR RENTAL
Cement bags 7.00 ### 98.56 176.33 2,234.89
Sand cu.m. 0.50 375.00 175.37 84.50 634.87
Gravel cu.m. 1.00 879.00 350.73 169.00 1,398.73
CWNails kgs 2.00 160.00 1.84 1.50 163.34
Tie Wires kgs 0.54
Coco F. Lumber bd.ft. 15.00 200.00 10.85 5.80 216.65
1/2"x4"x8' Plywood pcs 1.25
TOTAL ### 637.35 437.13 4,648.48
B. LABOR COST
1. Fabrication, placing and dismantling of forms
1.00 Carpenter @ 450.00 per day = 450.00
1.00 Laborer @ 285.00 per day = 285.00
Total = 735.00
Capability 4.50 cu.m./day
Labor Cost = 163.33
C. EQUIPMENT COST
Capability 4.50 cu.m./day
Rental = 172 per hr. x 8.00 hrs/day
= 305.78
4.50 cu.m./day
SUMMARY
I. ESTIMATED DIRECT COST
A. MATERIAL COST = 3,574.00
B. LABOR COST = 1,651.79
C. EQUIPMENT COST = 742.91
TOTAL ESTIMATED DIRECT COST = 5,968.70
HAULING COST
ITEM UNIT QUANTITY
BASE COST TOTAL
LABOR RENTAL
RSB kgs 1.00 55.00 0.92 0.75 56.67
55.00 0.92 0.75 56.67
SUMMARY
I. ESTIMATED DIRECT COST
A. MATERIAL COST = 55.00
B. LABOR COST = 0.92
C. EQUIPMENT COST = 0.75
TOTAL ESTIMATED DIRECT COST = 56.67
SUMMARY
I. ESTIMATED DIRECT COST
A. LABOR COST = 12.94
B. EQUIPMENT COST =
TOTAL ESTIMATED DIRECT COST = 12.94
Desilting (Manual)
1) LABOR COST
Crew: 1.00 Laborer
Capability of one ### cu.m./day/man
1.00 labor 260.00 per day = 260.00
Unit Cost 260.00 per d 2.50 cu.m./day/man = 104.00
SUMMARY
I. ESTIMATED DIRECT COST
A. MATERIAL COST = -
B. LABOR COST = 104.00
C. EQUIPMENT COST = -
TOTAL ESTIMATED DIRECT COST = 104.00
Prepared by Submitted by
per cu.m.
per day
per day
per day
per cu.m.
per day
per day
per day
per day
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per day
per day
per day
per cu.m.
per day
per day
per day
per day
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per cu.m.
per kg
per kg
per kg
per kg
per kg
per day
per day
per day
per day
kgs./day
per kg.
per cu.m.
per cu.m.
per kg
per kg
per day
per cu.m.
per cu.m.
per cu.m.
per cu.m.
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, MacArthur, Leyte
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
MANPOWER REQUIREMENT, EQUIPMENT REQUIREMENT & CASH REQUIREMENT
CY 2017 PROGRAM OF WORK
8. Consulting Services
10. Contingencies - - - -
Attachment "C-1"
1st QUARTER TOTAL
PESO LOAN
C.O.
- - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, MacArthur, Leyte
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
MANPOWER REQUIREMENT, EQUIPMENT REQUIREMENT & CASH REQUIREMENT
CY 2017 PROGRAM OF WORK
6. Procurement of Equipment
& Vehicles
8. Consulting Services
10. Contingencies - - - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, MacArthur, Leyte
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
MANPOWER REQUIREMENT, EQUIPMENT REQUIREMENT & CASH REQUIREMENT
CY 2017 PROGRAM OF WORK
6. Procurement of Equipment
& Vehicles
8. Consulting Services
10. Contingencies - - - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, MacArthur, Leyte
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
MANPOWER REQUIREMENT, EQUIPMENT REQUIREMENT & CASH REQUIREMENT
CY 2017 PROGRAM OF WORK
October 2017 November 2017 December 2017 4th QUARTER TOTAL GRAND TO
DESCRIPTI
PARTICULAR PC LP PC LP PC LP PESO LOAN PESO
ON
F.O. C.O. F.O. C.O. F.O. C.O. F.O. C.O. F.O. C.O. F.O. C.O. F.O. C.O. F.O. C.O. F.O.
No. of
I. MANPOWER REQUIREMENT
Personnel
1. Monthly Personnel 7
2. Daily Personnel 4
3. Contractual 6
II. EQUIPMENT REQUIREMENT Units
(see attached list of equipment)
III. MATERIAL REQUIREMENT
IV. CASH REQUIREMENT
A. DIRECT COST
1. CIVIL WORKS
a. Contract Works -
Diversion Works 288,775.40 - 180,484.70 - 72,170.80 - 541,430.90 - 3,609,692.90
Canal System 5,605,090.00 3,381,290.00 3,098,994.42 12,085,374.42 81,097,604.42
Control gates 243,970.00 145,790.00 65,447.67 455,207.67 3,272,437.67
b. Force Account Works -
Improvement BIG Building 380,098.37 99,670.00 49,845.60 529,613.97 2,697,393.97
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - -
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, MacArthur & Mayorga, Leyte
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
MANPOWER REQUIREMENT, EQUIPMENT REQUIREMENT & CASH REQUIREMENT
CY 2017 PROGRAM OF WORK
4. Parcellary Mapping/Survey
6. Procurement of Equipment
& Vehicles
8. Consulting Services
10. Contingencies - -
Attachment "C-5"
OVERALL Project Cost
PESO LOAN
F.O. C.O. F.O. C.O.
3,679,004.90 - - -
82,629,194.89
124,706.60
3,272,437.67
-
2,697,393.97
932,676.41
924,040.91 - -
- - -
-
-
- - -
- - -
- - -
- - -
-
-
2,773,543.75
- -
- -
- -
- -
- - -
- -
97,033,000.00 -
Gibuga Dulag 4B CAST IA
1. Repair of Canal lining at Lateral A Sta 2+485 - Sta 2+575 Labor
a. Concrete Demolition cu.m. 1.80 1021.57 1,021.57
b. 170 kgsc Reinforced concrete cu.m. 6.93 48449.99 16,885.92
c. Reinforcing Steel Bars
c.1 Furnishing & Stockpiling of RSB kgs 245.00 13884.15 409.15
c.2 Cut , bend & Placing of RSB kgs 245.00 3170.3 3,170.30
Sub-total Repair at Lateral A 21,486.94
205,678.37 80,821.60
Material
31,564.07
13,475.00
45,039.07
16440.4
40992.3
22385
63377.3
124,856.77
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, MacArthur, Leyte
DETAILED BREAKDOWN OF CY 2017 WORK PROGRAMMED (BY ACTIVITIES)
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
O V E R H E A D
EQUIPMENT
ACTIVITY LABOR
TEV SUNDRIES RENTAL CONST MATL FUEL & OIL SPARE PARTS OFFICE SUPPLIES OTHERS
A. DIRECT COST
1. CIVIL WORKS
a. Contract Works 87,979,735.89
b. Force Account Works 2,697,393.97 887,960.20 1,809,433.77
2. Institutional Development Program 906,771.20 594,062.72 45,338.56 72,541.69 13,473.98 136,015.68 45,338.57
7. Field Support Supervision & Monitoring 2,720,327.74 1,872,151.65 136,016.84 217,626.94 - 90,068.70 307,300.52 97,163.09 -
7. Consulting Services
9. Contingencies
TOTAL DIRECT COST 95,211,000.00 3,948,237.29 226,693.96 362,710.32 1,809,433.77 117,016.66 579,331.88 187,840.23
Attachment "B"
CONTRACT WORKS
Procurement
Consulting TRAININGS
of Equipment
TOTAL
Civil Works
Services
87,979,735.89 87,979,735.89
2,697,393.97
906,771.20
- - - - 906,771.20
-
-
-
-
-
-
-
-
-
- - - - 2,720,327.74
-
87,979,735.89 95,211,000.00
87,979,726.89
Submitted by:
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, Dulag, Leyte
DETAILED BREAKDOWN OF CY 2017 PROGRAM OF WORKS
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
Attachment "D"
ESTIMATED DIRECT COST INDIRECT COST TOTAL
ACTIVITY Unit Quantity
Unit Cost TOTAL EDC OCM PROFIT VAT TOTAL Unit Cost Project Cost
A. DIRECT COST
1. CIVIL WORKS
I. CONTRACT WORKS
1. CANAL SYSTEM
Package 1
Construction of Canal Lining @ Lateral A (Sta 0+033 - Sta 5+660)
Construction of Canal Lining @ Lateral A-1 (Sta 0+000 - Sta 0+280)
a. Clearing and grubbing (manual) sq.m. 16,538.18 6.47 107,002.02
b. 170 KGSC Concrete cu.m. 1,461.22 8,818.27 12,885,432.65
c. Structure Excavation (Manual) cu.m. 2,364.03 130.11 307,583.94
d. Structure Backfill Compaction (Haul Borrow) cu.m. 3,399.73 1,323.00 4,497,843.68
d. Boulder Riprap cu.m. 243.54 6,400.93 1,558,882.49
d. Gravel bedding cu.m. 181.93 2,260.90 411,325.51
Sub-total Canal system - - - - - 19,768,070.46
CONTROL GATES
Package 7
Lateral A -
a. Fabrication of Steelgates
a.1 Steelgate (1.10m x 1.00) units 9 67,600.00 608,400.00
a.2 Steelgate (1.0m x 0.60) units 10 64,097.11 640,971.10
a.3 Steelgate (1.60m x 1.0) units 1 63,500.00 63,500.00
sub-total (Steelgate Fabrication) 20 - - - - - 1,312,871.10
b. Installation of Steelgates
b.1 Steelgate (1.10m x 1.00) units 9 9,200.00 82,800.00
b.2 Steelgate (1.0m x 0.60) units 10 8,900.00 89,000.00
b.3 Steelgate (1.60m x 1.0) units 1 9,450.50 9,450.50
sub-total (Steelgate Installation) - - - - - 181,250.50
CANAL SYSTEM
Package 3
1. Construction of Canal Lining at Main Canal (Sta 0+000 - Sta 3+500) L = 3500m
2. Construction of Canal Lining at MFD #2 at Main Canal (Sta 0+000 - Sta 0+300) L = 300m
3. Construction of Canal Lining at MFD #3 at Main Canal (Sta 0+000 - Sta 0+300) L = 300m
4. Construction of Canal Lining at MFD #4 at Main Canal (Sta 0+000 - Sta 0+300) L = 300m
5. Construction of Canal Lining at MFD #5L at Main Canal (Sta 0+000 - Sta 0+370) L = 370m
6. Construction of Canal Lining at MFD #5R at Main Canal (Sta 0+000 - Sta 0+300) L = 300m
a. Clearing & Grubbing (Manual) sq.m. 19,714.34 6.51
b. 211 KGSC Plain Concrete cu.m. 37.42 11,119.93
c. 170 KGSC Plain Concrete cu.m. 1,284.80 8,818.27
d. 170 KGSC Reinforced Concrete cu.m. 359.78 10,106.78
e. Furnishing and Stockpiling of RSB kgs 18,574.19 71.40
f. Cutting, Bending & Placing of RSB kgs 18,574.19 11.38
g. Structure Excavation (Manual) cu.m. 895.23 128.99
h. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 7,150.22 1,330.44
i. Gravel bedding cu.m. 233.40 2,260.90
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, Mayorga, Leyte
DETAILED BREAKDOWN OF CY 2017 PROGRAM OF WORKS
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
CANAL STRUCTURE
a.1 construction of Footbridge (1-unit) at MC
a.2 construction of drainage Inlets (9-units)
a.1 construction of Drainage Crossing (1-unit)
a. 211 KGSC Plain Concrete cu.m. 6.65 11,119.93
b. Furnishing and Stockpiling of RSB kgs 201.39 71.40
c. Cutting, Bending & Placing of RSB kgs 201.39 11.38
d. Fabrication & installation of RCP 12"dia pcs 12.00 3,197.61
e. Fabrication & installation of RCP 8"dia pcs 3.00 3,000.40
f. Fabrication & installation of RCP 24"dia pcs 9.00 3,367.80
g. Structure Excavation (Manual) cu.m. 0.32 128.99
sub-total (Package 3) - - - - -
Package 4
4-a. Construction of Canal Lining at Lateral B (Sta 0+724 - Sta 3+400) L = 2261m
4-b. Construction of MFD Canal Lining at Lateral B
4-c. Construction of Canal Lining at Lateral D
a. Clearing & Grubbing (Manual) sq.m. 11,954.13 6.54
b. 170 KGSC Reinforced Concrete cu.m. 1,137.16 10,097.74
c. Furnishing and Stockpiling of RSB kgs 9,229.30 71.13
d. Cutting, Bending & Placing of RSB kgs 9,229.30 13.60
e. Structure Excavation (Manual) cu.m. 1,489.09 130.21
f. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 2,663.72 1,328.25
g. Gravel Bedding cu.m. 140.38 2,260.90
sub-total (Package 4) - - - - -
Package 5
5-a. Canal lining at Lateral C (sta 0+108 - Sta 1+129) L = 1001m
5-b. Canal lining at Lateral C-1 (Sta 0+248- Sta 2+804)
5-b. Canal lining of MFD at Lateral C-1 (Sta 0+000- Sta 0+200)
a. Clearing & Grubbing (Manual) sq.m. 14,437.93 5.20 6.36
b. 170 KGSC Reinforced Concrete cu.m. 1,167.91 8,021.28 10,103.02
c. Furnishing and Stockpiling of RSB kgs 4,612.89 56.67 71.18
d. Cutting, Bending & Placing of RSB kgs 4,612.89 11.38 13.65
e. Structure Excavation (Manual) cu.m. 1,036.45 104.00 127.74
f. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 2,424.46 1,058.40 1,328.78
g. Gravel bedding cu.m. 184.08 2,260.90
h. Concrete Demolition cu.m. 7.02 718.20
sub -total (package 5) - - - - -
Package 7
Construction of Canal Lining of MFD @ main Canal Sta 0+000-0+700
a. Clearing & Grubbing (Manual) sq.m. 1,379.96 6.15
b. 170 KGSC Reinforced Concrete cu.m. 90.00 9,010.50
c. Furnishing and Stockpiling of RSB kgs 3,762.00 69.62
NATIONAL IRRIGATION ADMINISTRATION
GIBUGA RIS, Mayorga, Leyte
DETAILED BREAKDOWN OF CY 2017 PROGRAM OF WORKS
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
CONTROL GATES
Package 6
Main Canal, Lateral B, C, & D
A. Fabrication of Steel gates
a.1 Steelgate (3.0m x 1.50) units 1 82,075.82
a.2 Steelgate (1.90m x 1.40) units 2 68,359.75
a.3 Steelgate (1.0m x 0.90) units 3 67,360.50
a.4 Steelgate (1.10m x 1.00) units 15 67,534.35
a.5 Steelgate (1.0m x 0.60) units 2 65,300.00
sub-total (Steelgate Fabrication) 23 - - - - -
sub-total (Steelgates) - - - - - -
TOTAL (FAW)
GRAND TOTAL
Attachment "D"
TOTAL
Project Cost
1,109.30
29,116.80
15,592.67
1,060,435.22
387,474.89
52,876.28
10,657.01
102,052.76
124,288.04
60,242.46
26,513.99
131,969.25
2,002,328.66
9,083.00
1,070,486.06
281,476.81
56,730.58
15,592.67
173,994.74
1,607,363.86
3,609,692.90
128,340.35
416,107.78
11,329,713.30
3,636,217.31
1,326,197.17
211,374.28
115,475.72
9,512,931.72
527,694.06
27,204,051.69
AL IRRIGATION ADMINISTRATION
GIBUGA RIS, Mayorga, Leyte
AKDOWN OF CY 2017 PROGRAM OF WORKS
ION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
Attachment "D"
TOTAL
Project Cost
73,891.93
14,379.25
2,291.82
38,371.32
9,001.20
30,310.20
41.28
168,287.00
27,372,338.62
78,179.99
11,482,770.35
656,480.11
125,518.48
193,894.41
3,538,086.08
317,385.10
16,392,314.52
91,825.23
11,799,387.78
328,345.77
62,966.00
132,396.12
3,221,572.91
416,175.17
5,041.76
16,057,710.74
8,486.75
810,945.00
261,910.44
AL IRRIGATION ADMINISTRATION
GIBUGA RIS, Mayorga, Leyte
AKDOWN OF CY 2017 PROGRAM OF WORKS
ION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
Attachment "D"
TOTAL
Project Cost
48,605.04
38,693.88
232,319.43
1,400,960.54
1,417,763.34
61,223,324.42
82,075.82
136,719.50
202,081.50
1,013,015.25
130,600.00
1,564,492.07
11,080.50
19,401.00
27,541.50
142,683.93
17,801.00
218,507.93
1,783,000.00
66,616,017.32
22,500.00
97,032.20
425,508.00
934,190.40
237,200.00
140,700.00
280,740.00
161,875.00
191,970.00
2,491,715.60
136,063.56
AL IRRIGATION ADMINISTRATION
GIBUGA RIS, Mayorga, Leyte
AKDOWN OF CY 2017 PROGRAM OF WORKS
ION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
Attachment "D"
TOTAL
Project Cost
27,456.02
62,922.06
-
23,064.69
5,266.58
118,709.35
9,360.00
7,994.21
17,354.21
136,063.56
2,627,779.16
692,437.87
692,437.87
1,384,875.74
2,077,327.78
72,706,000.00
72,706,000.00
M
PR
CLIMATE CHANGE ADAPTATIO
GIB
STATION
PARTICULARS Length
FROM TO m
MAYORGA
A. DIVERSION WORKS
Package 2
2.a Repair of Canal lining at lateral C-1 1+790 1+810 20
2.b Repair of Canal lining at lateral B 0+565 0+715 150
2.c Desilting at Lateral B 0+000 0+600 600
2.c Desilting at Lateral B 0+000 0+512.45 512.45
sub-total 1282.45
TOTAL 1,702.45
JOJO A. ARCEŇO
OIC IS / BHHD-BIG-DGM Satellite Office
MASTERLIST OF ACTIVITIES
1.8 6.93
29.7
- 1.80 29.70 - - - 6.93
- - 4.60
- 3 9.00
90
76.87
0 0 3 166.87 0 0 0 9 4.6
CATHERINE G. MACANIP
Senior Engineer A
RSB Area (has.)
RSB Cut Bend
Furnishing & TOWN/BRGY.
& Placing
Stockpiling COVERED
(kg)
(kg) New Rehab
245.00 245.00
245.00 245.00 -
407.00 407.00
407 407 -
652.00 652.00 - -
ALEJANDRO C. CULIBAR, DM
Division Manager A
MASTERLIST OF ACTIVITIES
STATION Clearing & Dewate Structure Str. Backfill 170 KGSC Fab. & Fab. & Fab. &
Length Units Concrete 170 KGSC 211 KGSC RSB Furnishing RSB Cut Rubble Concrete
Grubbing ring Excavation w/ reinforced Installation of Installation of Installation of BoulderRipra
PARTICULARS Demolitio Concrete ReinforcedCo & Stockpiling Bend & Masonry piles
Manual (sq.m.)/ Manual Compaction Concrete RCP 12"dia RCP 8"dia RCP 24"dia p (cu.m.)
FROM TO m n (cu.m.) ncrete (cu.m.) (kg) Placing (kg) (cu.m.) (pcs)
(sq.m.)/ (cu.m.) (HB) (cu.m.) (cu.m.) (pcs) (pcs) (pcs)
CONTRACT WORKS
GIBUGA RIS
DULAG
A. Canal System
Package 1
1.a Construction of Canal lining of Lateral A (staggard lengt 0+000 5+660 4548 15,810.74 2,247.27 3,200.33 1,399.68 243.54
1.b Construction of Canal lining of Lateral A-1 0+000 0+280 280 727.44 116.76 199.40 61.54
sub-total (Package 1) 4548 16,538.18 - - 2,364.03 3,399.73 1,461.22 - - - - 243.54 -
B. Canal Structure
1.a Construction of Thresere Crossing (2-units) 63.6 7.88 15.88 4.8 354.12 354.12
total (Package 1) 4548 16,601.78 - - 2,371.91 3,415.61 1,461.22 4.80 354.12 354.12 - 243.54 -
MAYORGA
A. DIVERSION WORKS
Package 2
2.a Construction of Alinsorang Checkgate 189.30 240.00 118.18 770.85 33.06 717.16 717.16 13.08 22.75
2.b Construction of Canal Lining Alinsorang 0+000 0+550 550 1,550.00 118.18 126.48 101.70 3,817.67 3,817.67
sub-total (Package 2) 550 1,739.30 240.00 - 236.36 897.33 33.06 101.70 4,534.83 4,534.83 13.08 22.75 -
Package 3
a. Canal System
3.a. Canal Lining @ Main Canal (staggard length) 0+000 4+344 3810 16,780.28 787.84 6,992.30 1,284.80 102.49 37.42 7,956.62 7,956.62
3.b. Canal Lining @ MFD # 2 at Main Canal 0+000 0+300 300
3.b. Canal Lining @ MFD # 3 at Main Canal 0+000 0+300 300
3.b. Canal Lining @ MFD # 4 at Main Canal 0+000 0+300 300 2,934.06 107.39 157.92 257.29 10,617.57 10,617.57
3.b. Canal Lining @ MFD # 5L at Main Canal 0+000 0+370 370
3.b. Canal Lining @ MFD # 5R at Main Canal 0+000 300 300
sub-total (Canal system) 5380 19,714.34 - - 895.23 7,150.22 1,284.80 359.78 37.42 18,574.19 18,574.19 - - -
a. Canal Structures
a.1 construction of Footbridge (1-unit) at MC 1 0.32 4.53 52.79 52.79
a.2 construction of drainage Inlets (9-units) 9
2.12 148.60 148.60 12.00 3.00 9.00
a.1 construction of Drainage Crossing (1-unit) 1
sub-total (Canal Structure) 11.00 - - - 0.32 - - - 6.65 201.39 201.39 12.00 3.00 9.00 - - -
sub-total (Package 3) 5,380.00 11.00 19,714.34 - - 895.55 7,150.22 1,284.80 359.78 44.07 18,775.58 18,775.58 12.00 3.00 9.00 - - -
Package 4
4.a Canal Lining @ Lateral B (staggard length) 0+110 1+871 1267.3 3,702.72 1,289.09 2,463.72 #REF!
4.b Canal Lining of MFD @ Lateral B 0+000 0+750 750 8,251.41 200.00 200.00 1,137.16 9,229.30 9,229.30
4.c Canal Lining of @ Lateral D 0+000 1+260 1260 4,736.80 776.29 1,106.72 449.94
sub-total (Package 4) 3277.3 11,954.13 - - 1,489.09 2,663.72 #REF! 1,137.16 9,229.30 9,229.30 - - -
Package 5
5.a Canal Lining @ Lateral C (staggard length) 0+108 1+980 1872
5.b Canal Lining of Lateral C-1 (staggard length) 0+023 2+804 2129 14,437.93 7.02 1,036.45 2,424.46 1,167.91 4,612.89 4,612.89
5.c Canal Lining of MFD @ Lateral C-1 0+000 0+950 950
sub-total (Package 5) 4951 14,437.93 7.02 - 2,424.46 1,167.91 - 4,612.89 4,612.89 - - -
Package 8
8.a Canal Lining of MFD @ Main Canal 0+000 700 700 1,379.96 298.61 174.65 90.00 3,762.00 3,762.00
sub-total (Package 5) 700.00 - 1,379.96 - - 298.61 174.65 - 90.00 - 3,762.00 3,762.00 - - - - - -
C. CONTROL GATES
Package 6 (Dulag)
6. Fabrication & Installation of Steel gates
6.a. Lateral A
6.a.1 Steelgate (1.10m x 1.00) 9
6.a.2 Steelgate (1.0m x 0.60) 10
6.a.3 Steelgate (1.60m x 1.0) 1
sub-total (Package 6) 20.0 - - - - - - - - - - - -
MASTERLIST OF ACTIVITIES
STATION Clearing & Dewate Structure Str. Backfill 170 KGSC Fab. & Fab. & Fab. &
Length Units Concrete 170 KGSC 211 KGSC RSB Furnishing RSB Cut Rubble Concrete
Grubbing ring Excavation w/ reinforced Installation of Installation of Installation of BoulderRipra
PARTICULARS Demolitio Concrete ReinforcedCo & Stockpiling Bend & Masonry piles
Manual (sq.m.)/ Manual Compaction Concrete RCP 12"dia RCP 8"dia RCP 24"dia p (cu.m.)
FROM TO m n (cu.m.) ncrete (cu.m.) (kg) Placing (kg) (cu.m.) (pcs)
(sq.m.)/ (cu.m.) (HB) (cu.m.) (cu.m.) (pcs) (pcs) (pcs)
Package 7 (Mayorga)
7. Fabrication & Installation of Steel gates
7.a. Main Canal, Lat B, C & D
7.a.1 Steelgate (3.0m x 1.50) 1
7.a.2 Steelgate (1.90m x 1.40) 2
7.a.3 Steelgate (1.0m x 0.90) 3
7.a.4 Steelgate (1.20m x 1.10)
7.a.5 Steelgate (1.10m x 1.00) 15
7.a.6 Steelgate (1.0m x 0.60) 2
sub-total (package 7) 23
TOTAL 18,706.30 43.00 64,447.48 247.02 - 4,992.91 16,551.34 #REF! 359.78 1,287.73 37,506.72 37,506.72 12.00 3.00 9.00 13.08 266.29 -
IST OF ACTIVITIES
OF WORK CY 2017
S (UPGRADING OF NIS DAMAGED BY YOLANDA)
yorga & Mac Arthur, Leyte
174.93
7
- 181.93 - -
- 181.93 - - - -
187.80
45.60
- 233.40 - - - - -
- - - - - - -
184.08
- 184.08 - - - - -
- - -
9
10
1
- - - - - 20.0 - -
IST OF ACTIVITIES
OF WORK CY 2017
S (UPGRADING OF NIS DAMAGED BY YOLANDA)
yorga & Mac Arthur, Leyte
1
2
3
15
2
23
ACTIVITY Unit Quantity ESTIMATED COST INDIRECT MARK-UPS Total Cost Unit Cost
CANAL SYSTEM
Package 1
Construction of Canal Lining @ Lateral A (Sta 0+033 - Sta 4+600) L= 3532 m.
a. Clearing and grubbing (manual) sq.m. 15,759.22 81,947.94 21,274.95 103,222.89 6.55
b. 211 KGSC Palin Concrete cu.m. 1,313.01 11,602,032.09 3,016,535.43 14,618,567.52 11,133.63
c. Structure Excavation (Manual) cu.m. 1,559.11 162,147.44 42,158.34 204,305.78 131.04
d. Structure Backfill Compaction (Haul Borrow) cu.m. 3,745.25 3,963,972.60 1,030,617.90 4,994,590.50 1,333.58
total (Package 1) 15,810,100.07 4,110,586.62 19,920,686.69
ACTIVITY Unit Quantity ESTIMATED COST INDIRECT MARK-UPS Total Cost Unit Cost
Package 2
DIVERSION WORKS
Package 2
1. Construction of Alinsorang Checkgate
a. Clearing & Grubbing (Manual) sq.m. 903.68 4,699.14 1,472.99 6,172.13 6.83
b. Diversion & Care of River cu.m. 21.36 2,054.62 642.07 2,696.69 126.25
d. Structure Excavation (Manual) cu.m. 118.18 12,290.72 3,840.85 16,131.57 136.50
e. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 812.85 860,320.44 268,850.14 1,129,170.58 1,389.15
f. 211 KGSC Reinforced Concrete cu.m. 25.97 232,021.43 72,506.69 304,528.12 11,726.15
g. Furnishing and Stockpiling of RSB kgs 1,558.20 88,303.19 27,595.72 115,898.91 74.38
h. Cutting, Bending & Placing of RSB kgs 1,558.20 17,732.32 5,547.19 23,279.51 14.94
j. Rubble Masonry cu.m. 4.75 28,257.47 8,830.45 37,087.92 7,807.98
k. Grouted Riprap cu.m. 11.60 55,262.28 17,269.50 72,531.78 6,252.74
l. Boulder Riprap cu.m. 10.50 21,262.08 6,644.40 27,906.48 2,657.76
m. Gravel Blanket cu.m. 5.46 9,797.21 3,061.64 12,858.85 2,355.10
n. Filter Drain cu.m. 5.92 12,187.80 3,808.70 15,996.50 2,702.11
o. Pipe Railings m. 39.00 13,788.06 4,308.72 18,096.78 464.02
p. Fabrication and Installation 18" dia RCP pcs 6.00 14,628.54 4,571.40 19,199.94 3,199.99
Sub-total checkgate 1,372,605.30 428,950.46 1,801,555.76
ACTIVITY Unit Quantity ESTIMATED COST INDIRECT MARK-UPS Total Cost Unit Cost
CANAL SYSTEM
Package 3
A. Construction of Canal Lining at Main Canal (Sta 0+000 - Sta 3+500) L = 3500m
a. Clearing & Grubbing (Manual) sq.m. 16,881.40 87,783.28 22,789.89 110,573.17 6.55
b. 211 KGSC Plain Concrete cu.m. 1,374.60 12,146,254.27 3,158,033.53 15,304,287.80 11,133.63
c. Structure Excavation (Manual) cu.m. 2,578.30 268,143.20 69,717.23 337,860.43 131.04
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 8,752.30 9,263,434.32 2,408,457.91 11,671,892.23 1,333.58
total (Package 3) 21,765,615.07 5,658,998.56 27,424,613.63
ACTIVITY Unit Quantity ESTIMATED COST INDIRECT MARK-UPS Total Cost Unit Cost
CANAL SYSTEM
Package 4
4-a. Construction of Canal Lining at Lateral B (Sta 0+724 - Sta 3+400) L = 2261m
4-b. Construction of MFD Canal Lining at Lateral B
4-c. Construction of Canal Lining at Lateral D
a. Clearing & Grubbing (Manual) sq.m. 12,781.81 66,465.41 17,255.44 83,720.85 6.55
b. 211 KGSC Plain Concrete cu.m. 1,080.04 9,543,460.25 2,481,305.50 12,024,765.75 11,133.63
c. 170 KGSC Reinforced Concrete cu.m. 42.80 343,310.78 89,260.68 432,571.46 10,106.81
d. Furnishing and Stockpiling of RSB kgs 1,442.00 81,718.14 21,240.66 102,958.80 71.40
e. Cutting, Bending & Placing of RSB kgs 1,442.00 16,409.96 4,268.32 20,678.28 14.34
f. Structure Excavation (Manual) cu.m. 1,489.09 154,865.36 40,264.99 195,130.35 131.04
g. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 2,663.72 2,819,281.25 733,002.47 3,552,283.72 1,333.58
total (Package 4) 13,025,511.15 3,386,598.06 16,412,109.21
ACTIVITY Unit Quantity ESTIMATED COST INDIRECT MARK-UPS Total Cost Unit Cost
CANAL SYSTEM
Package 5
5-a. Canal lining at Lateral C (sta 0+108 - Sta 1+129) L = 1001m
5-b. Canal lining at Lateral C-1 (Sta 0+248- Sta 2+804)
5-b. Canal lining of MFD at Lateral C-1 (Sta 0+000- Sta 0+200)
a. Clearing & Grubbing (Manual) sq.m. 9,868.40 51,315.68 13,322.34 64,638.02 6.55
b. 211 KGSC Plain Concrete cu.m. 1,077.09 9,517,393.43 2,474,528.11 11,991,921.54 11,133.63
c. 170 KGSC Reinforced Concrete cu.m. 40.66 326,145.24 84,797.64 410,942.88 10,106.81
d. Furnishing and Stockpiling of RSB kgs 1,369.90 77,632.23 20,178.63 97,810.86 71.40
e. Cutting, Bending & Placing of RSB kgs 1,369.90 15,589.46 4,054.90 19,644.36 14.34
f. Structure Excavation (Manual) cu.m. 1,036.45 107,790.80 28,025.61 135,816.41 131.04
g. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 2,521.70 2,668,967.28 693,921.41 3,362,888.69 1,333.58
total (package 5) 12,764,834.12 3,318,828.64 16,083,662.76
ACTIVITY Unit Quantity ESTIMATED COST INDIRECT MARK-UPS Total Cost Unit Cost
CONTROL GATES
Package 6
Main Canal, Lateral B, C, & D -
A. Fabrication of Steel gates
a.1 Steelgate (3.0m x 1.50) units 1 62,536.85 19,542.77 82,079.62 82,079.62
a.2 Steelgate (1.90m x 1.40) units 2 108,766.78 33,989.62 142,756.40 71,378.20
a.3 Steelgate (1.0m x 0.90) units 3 153,972.45 48,116.40 202,088.85 67,362.95
a.4 Steelgate (1.10m x 1.00) units 15 772,656.90 241,455.30 1,014,112.20 67,607.48
a.5 Steelgate (1.0m x 0.60) units 2 99,509.86 31,096.82 130,606.68 65,303.34
sub-total (Steelgate Fabrication) 1,197,442.84 374,200.91 1,571,643.75
ACTIVITY Unit Quantity ESTIMATED COST INDIRECT MARK-UPS Total Cost Unit Cost
CONTROL GATES
Package 7
Lateral A -
a. Fabrication of Steelgates
a.1 Steelgate (1.10m x 1.00) units 9 463,594.14 144,873.18 608,467.32 67,607.48
a.2 Steelgate (1.0m x 0.60) units 10 497,549.30 155,484.10 653,033.40 65,303.34
a.3 Steelgate (1.60m x 1.0) units 1 52,972.89 16,554.03 69,526.92 69,526.92
sub-total (Steelgate Fabrication) 20 1,014,116.33 316,911.31 1,331,027.64
b. Installation of Steelgates
b.1 Steelgate (1.10m x 1.00) units 9 63,203.76 19,751.22 82,954.98 9,217.22
b.2 Steelgate (1.0m x 0.60) units 10 67,961.20 21,238.00 89,199.20 8,919.92
b.3 Steelgate (1.60m x 1.0) units 1 7,211.34 2,253.53 9,464.87 9,464.87
sub-total (Steelgate Installation) 138,376.30 43,242.75 181,619.05
ACTIVITY Unit Quantity ESTIMATED COST INDIRECT MARK-UPS Total Cost Unit Cost
CANAL SYSTEM
Package 8
Construction of Canal Lining of MFD
a. Clearing & Grubbing (Manual) sq.m. 1,379.96 7,175.79 1,862.94 9,038.73 6.55
c. 170 KGSC Reinforced Concrete cu.m. 90.00 643,921.20 167,418.91 811,340.11 9,014.89
d. Furnishing and Stockpiling of RSB kgs 3,762.00 213,192.54 55,414.26 268,606.80 71.40
e. Cutting, Bending & Placing of RSB kgs 3,762.00 42,811.56 11,135.52 53,947.08 14.34
f. Structure Excavation (Manual) cu.m. 298.61 31,055.44 8,074.42 39,129.86 131.04
g. Structure Backfill (Haul Borrow) cu.m. 174.65 184,849.56 48,060.22 232,909.78 1,333.58
sub-total (Package 8) 1,123,006.09 291,966.27 1,414,972.36
Package 2
B. Construction of Canal Lining at Lateral B
a. Clearing & Grubbing (Manual) sq.m. 3,702.72 7.22 26,733.64
b. 211 KGSC Plain Concrete cu.m. 343.82 11,455.38 3,938,588.75
c. Structure Excavation (Manual) cu.m. 368.16 136.28 50,172.84
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 669.76 1,290.24 864,151.14
4,879,646.37
Package 3
C. Canal lining at Lateral C
a. Clearing & Grubbing (Manual) sq.m. 2,681.28 7.22 19,358.84
b. 211 KGSC Plain Concrete cu.m. 248.98 11,455.38 2,852,160.51
c. Structure Excavation (Manual) cu.m. 1,200.11 136.28 163,550.99
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 36.29 1,290.24 46,822.81
3,081,893.15
Package 4
2. CONTROL GATES
Fabrication & Installation of Steel gates
a. Main Canal -
a.1 Steelgate (1.25m x 0.60) @ Sta 1+100 ,1+500,3+200,3+500 units 4 66,984.48 267,937.92
a.2 Steelgate (1.0m x 0.60) @ Sta 0+800,1+700,1+800 units 3 66,859.97 200,579.91
a.3 Steelgate (1.7m x 1.40) @ Sta 2+200 units 1 73,056.72 73,056.72
a.4 Steelgate (1.4m x 0.60) @ Sta 0+680 units 1 68,960.90 68,960.90
a.5 Steelgate (1.60m x 0.70) @ Sta 1+300, 2+700 units 2 69,495.47 138,990.94
a.6 Steelgate (1.60m x 1.0) @ Sta 2+300, 3+100, 3+800 units 3 70,670.65 212,011.95
961,538.34
b. Lateral B
b.1 Steelgate (1.0m x 0.60) @ Sta 2+700 units 1 66,859.97 66,859.97
b.2 Steelgate (1.60m x 0.70) @ Sta 0+000, 2+200 units 2 69,495.47 138,990.94
205,850.91
c. Lateral C
c.1 Steelgate (1.25m x 0.60) @ Sta 1+700 units 1 66,984.48 66,984.48
c.2 Steelgate (1.4m x 0.60) @ Sta 1+900 units 1 68,960.90 68,960.90
c.3 Steelgate (1.60m x 0.70) @ Sta 0+200 units 1 69,495.47 69,495.47
c.4 Steelgate (1.60m x 0.70) @ Sta 0+000 units 1 71,168.29 71,168.29
276,609.14
3 CONTROL GATES
Fabrication & Installation of Steel gates
a. Main Canal ls 1,468,950.00 1,468,950.00
b. Lateral A ls 588,000.00 588,000.00
b. Lateral B ls 367,000.00 367,000.00
b. Lateral C 294,000.00 294,000.00
2,717,950.00
A. SURVEYING:
Profile
Capability per Team = 5 km/day
Cross-Section
Capability per Team = 3 km/day
Traverse
Capability per Team = 3 km/day
Equipment Cost
Cross-Section
Capability per Team = 8 km/day
Traverse
Capability per Team = 8 km/day
SUMMARY:
ESTIMATED DIRECT COST:
Computation &
Surveying Plotting
Labor Cost 4161.12 294.12 = 4455.24
Rental Cost 1073.47 1073.47
Fuel & Oil 123.07 123.07
3% FSS 165.86
CONTRACT WORKS
Package 1 PROJECTED 2.00 7.00 15.00 25.00 37.00 50.00 63.00 75.00 85.00 93.00
Canal Lining of Lateral A 19,768.070 21.14 ACTUAL
Package 2 PROJECTED 1.99 6.99 15.00 25.00 37.00 50.00 63.00 75.00 85.00 93.00
Alinsorang Checkgate w/ canal lining 3,609.693 3.86 ACTUAL
Package 3 PROJECTED 4.00 10.00 19.00 30.00 43.00 56.00 67.00 78.00 87.00 94.00
Canal Lining @ MC 27,372.339 29.28 ACTUAL
Package 4 PROJECTED 3.00 8.00 17.00 28.00 41.00 54.00 67.00 79.00 88.00 94.00
Canal Lining @ Lat D & Lat B w/ MFD 16,392.315 17.53 ACTUAL
Package 5 PROJECTED 2.00 9.00 18.00 28.00 41.00 54.00 67.00 78.00 87.00 94.00
Canal Lining @ Lat C & Lat C-1 16,057.711 17.17 ACTUAL
Package 6 PROJECTED 3.00 9.00 17.00 28.00 41.00 54.00 67.00 78.00 87.00 94.00
Fabrication and Installation of steelgates 1,783.000 1.91 ACTUAL
Package 7 PROJECTED 2.00 7.00 15.00 25.00 37.00 50.00 63.00 75.00 85.00 93.00
Fabrication and Installation of steelgates 1,489.438 1.59 ACTUAL
PROJECTED
FORCE ACCOUNT WORKS - - ACTUAL
3.00 9.00 19.00 30.00 43.00 56.00 68.00 78.00 87.00 94.00
Improvement of BIG Building 2,491.716 2.66
PROJECTED 4.00 12.00 22.00 34.00 48.00 60.00 70.00 80.00 85.00 90.00
II INSTITUTIONAL DEVELOPMENT PROGRAM 906.771 0.97 ACTUAL
PROJECTED 3.00 10.00 25.00 40.00 50.00 65.00 75.00 80.00 85.00 90.00
III CONSTRUCTION SURVEY 906.771 0.97 ACTUAL
PROJECTED 2.00 7.00 15.00 25.00 37.00 50.00 63.00 75.00 85.00 93.00
IV Field Support, Supervision & Monitoring 2,720.328 2.91 ACTUAL
93,498.15 100 PROJECTED 2.84 8.57 17.34 27.93 40.61 53.62 65.95 77.32 86.54 93.62
CY PHYSICAL STATUS
ACTUAL
NEW AREA Projected
__ (Has.) Actual
AREA GENERATION
REHAB AREA Projected
_ (Has.) Actual
GIBUGA RIS, Mayorga, Leyte
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
2017
%
NOV DEC
(17) (18) (19)
100
98.00 100.00 90
98.00 100.00
80
98.00 100.00
98.00 100.00 70
98.00 100.00
60
98.00 100.00
98.00 100.00 50
40
98.00 100.00
95.00 100.00 30
95.00 100.00
20
98.00 100.00
10
0
97.93 100.00
CMD FORM Y-2A GIBUGA RIS, Mayorga, Leyte
CY 2017 SCHEDULE EXPENDITURES AND STATUS CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
2017
ITEM ESTIMATED COST % Wt.ORIG./
MAJOR ITEM OF WORK PARTICULAR
NO. ORIGINAL/REVISED REV.
JAN FEB MAR APR MAY JUNE JULY AUG SEPT
(1) (2) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
I. CIVIL WORKS
CONTRACT WORKS
Package 1 PROJECTED 395.361 1,383.765 2,965.211 4,942.018 7,314.186 9,884.035 12,453.884 14,826.052 16,802.859
Canal Lining of Lateral A 19,768.070 21.14 ACTUAL
Package 2 PROJECTED 72.194 252.679 541.454 902.423 1,335.586 1,804.846 2,274.106 2,707.269 3,068.238
Alinsorang Checkgate w/ canal lining 3,609.693 3.86 ACTUAL
Package 3 PROJECTED 547.447 1,916.064 4,105.851 6,843.085 10,127.766 13,686.170 17,244.574 20,529.255 23,266.489
Canal Lining @ MC 27,372.339 29.28 ACTUAL
Package 4 PROJECTED 327.846 1,147.462 2,458.847 4,098.079 6,065.157 8,196.158 10,327.159 12,294.237 13,933.469
Canal Lining @ Lat D & Lat B w/ MFD 16,392.315 17.53 ACTUAL
Package 5 PROJECTED 321.154 1,124.040 2,408.657 4,014.428 5,941.353 8,028.855 10,116.357 12,043.282 13,649.053
Canal Lining @ Lat C & Lat C-1 16,057.711 17.17 ACTUAL
Package 6 PROJECTED 35.660 124.810 267.450 445.750 659.710 891.500 1,123.290 1,337.250 1,515.550
Fabrication and Installation of steelgates 1,783.000 1.91 ACTUAL
Package 7 PROJECTED 29.789 104.261 223.416 372.360 551.093 744.720 938.347 1,117.080 1,266.024
Fabrication and Installation of steelgates 1,489.438 1.59 ACTUAL
Projected 2.06 7.09 15.20 25.33 37.33 50.33 63.24 75.10 85.00
93,498.151 100.00
Actual
Projected - - - -
Actual
Projected 1,926.062 6,629.019 14,211.719 23,683.082 34,902.860 47,057.619 59,128.231 70,217.111 79,473.428
TOTAL CY 2017 PROJECT COST 93,498.151
Actual
1,926.062 6,629.019 14,211.719 23,683.082 34,902.860 47,057.619 59,128.231 70,217.111 79,473.428
CY FINANCIAL STATUS
GIBUGA RIS, Mayorga, Leyte
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
2017
%
OCT NOV DEC
(16) (17) (18) (16)
100
40
2,317.299 2,441.889 2,491.716
10
0
92.94 97.94 100.00
Institutional Development
1 Personnel Services
1.a Wages & Allowances
1 - IDO-A , 1 - RAB = 544,062.72
sub-total = 544,062.72
2 MOOE
2.a IA Capability Building = 44,406.27
2.b IDO/Staff Capability Building = 32,643.76
2.c Assistance Program/Inter Agency Coordination = 36,270.85
2.d Supervisory Cost = 44,406.27
2.e Office Supplies = 45,338.56
2.f Fuel & oil = 63,473.98
2.g TEV = 45,338.56
2.h Miscellaneous = 50,830.23
sub-total = 362,708.48
-
NAME OF PROJECT GIBUGA RIS
LENGTH OF CANAL 18,706.30 meters
DISTANCE 15 kms. or 30 kms. vice versa
AVERAGE SPEED 65 kms./hr.
DATA:
A. TYPE OF VEHICLE TO BE USED RENTAL RATE FUEL CONSUMPTION OIL CONSUMPTION
P/ Liter km./ Liter km./ Liter
Mitsubishi Pick-Up P 21.00 7 60
B. FUEL PRICE PER LITER P 40.00
C. OIL PRICE PER LITER P 280.00
1. Establishments of reference points preferably 1m. From the U/S and D/S limits of each structure and along centerlines
Total
Personnel
No. Wage/day Allow/day TEV remuneration No. of days TOTAL
Involved
/day
(1) (2) (3) (4) (5) (6)=(3)+(4)+(5) (7) (8)=(7)*(6)
1 G.E. Asst. 587.31 333.81 400 /day 1,321.12 32 42,275.84
1 Recorder 409.09 409.09 32 13,090.88
5 Laborers 2,045.45 2,045.45 32 65,454.40
1 Driver 631.36 348.33 400 /day 1,379.69 32 44,150.08
TOTAL: P 3,673.21 P 682.14 P 800.00 P 5,155.35 P 164,971.20
a. Labor
Total
Personnel
No. Wage/day Allow/day TEV remuneration No. of days TOTAL
Involved
/day
(1) (2) (3) (4) (5) (6)=(3)+(4)+(5) (7) (8)=(7)*(6)
1 G.E. Asst. 587.31 333.81 400 /day 1,321.12 32 42,275.84
1 Recorder 409.09 409.09 32 13,090.88
5 Laborers 2,045.45 2,045.45 32 65,454.40
1 Driver 631.36 348.33 400 /day 1,379.69 32 44,150.08
TOTAL: P 3,673.21 P 682.14 P 800.00 P 5,155.35 P 164,971.20
= 7.2275 days
Travel time:
30 kms 1 day
* 0.06 days
65 kms./hr. 8 hrs.
Total number of days
7.23 + 0.06 = 7.29 days
say 8 days
+ 4 days
= 12 days
*Additional days will be given for canals are from different locations and in different packages
3. Equipment Utilization
EQUIPMENT USED: Mitsubishi Pick-Up
SUMMARY
1 Labor = 400,853.40
2 TEV = 63,200.00
3 Equipment Cost = 5,040.00
4 Fuel and oil Cost = 10,971.43
Cost for Staking-out of Canals & Canal structures = 480,064.83
2 PLANS-IN-HAND WALK THRU/ INSPECTION
A. LABOR
Total
Personnel
No. Wage/day Allow/day TEV remuneration No. of days TOTAL
Involved
/day
(1) (2) (3) (4) (5) (6)=(3)+(4)+(5) (7) (8)=(7)*(6)
1 Engineer A 1,047.45 485.89 1,533.34 28 42,933.52
1 G.E Asst. 587.31 333.81 400 /day 1,321.12 28 36,991.36
1 Driver 631.36 348.33 400 /day 1,379.69 28 38,631.32
TOTAL: P 2,266.12 P 1,168.03 P 800.00 P 4,234.15 P 118,556.20
= 9353.15 days
Travel time:
30 kms 1 day
* 0.01 days
400 0 8 hrs.
Total number of days
9,353.15 + 0.01 = 9,353 days
say 7 days
+ 4 days
= 11 days
*Additional days will be given for canals are from different locations and in different packages
B. Equipment Utilization
EQUIPMENT USED: Mitsubishi Pick-Up
Total
Personnel
No. Wage/day Allow/day TEV remuneration No. of days TOTAL
Involved
/day
(1) (2) (3) (4) (5) (6)=(3)+(4)+(5) (7) (8)=(7)*(6)
1 G.E Asst. 587.31 333.81 400 /day 1,321.12 30 39,633.60
1 Driver 631.36 348.33 400 /day 1,379.69 30 41,390.70
TOTAL: P 1,218.67 P 682.14 P 800.00 P 2,700.81 P 81,024.30
B. Equipment Utilization
EQUIPMENT USED: Mitsubishi Pick-Up
OVER-ALL SUMMARY
1 Labor = 600,433.90
2 TEV = 109,600.00
3 Equipment Cost = 28,980.00
4 Fuel and oil Cost = 63,085.72
5 Office Supplies (addt'l.) = 104,671.58
Misc. Survey Works During Const. = 906,771.20
GIBUGA RIS, Mayorga, Leyte
CLIMATE CHANGE ADAPTATION WORKS (UPGRADING OF NIS DAMAGED BY YOLANDA)
KEY INDICATOR
CY 2017 PROGRAM OF WORK
AREA GENERATED
AREA RESTORED
DIVERSION DAM
a. Checkgate unit 1
IRRIGATION FACILITIES
a. Main Canal
Earth Canal km
Concrete Canal km 5.38
Structures km
b.. Lateral Canals
Earth Canal km
Concrete Canal km 6.5283
Structures km
ON-FARM FACILITIES
a. Main Farm Ditch km 0.96
b. Supplementary Farm Ditch km
c. Ditch Structures km
d. Turnout km
e. Farm Drains km
PROJECT FACILITIES
1 unit
2 unit
AREA GENERATED
AREA RESTORED
DIVERSION DAM
IRRIGATION FACILITIES
a. Main Canal
Earth Canal km
Concrete Canal km
Structures km
b.. Lateral Canals
Earth Canal km
Concrete Canal km 3.532
Structures km
SUPPLEMENTARY CANAL km
ON-FARM FACILITIES
a. Main Farm Ditch km
b. Supplementary Farm Ditch km
c. Ditch Structures km
d. Turnout km
e. Farm Drains km
PROJECT FACILITIES
1 unit
2 unit
a. CONTRACT WORKS
CANAL SYSTEM
Clearing & Grubbing 107,002.02 #REF! 92
211 kgsc. Plain Concrete 12,885,432.65 #REF! 209
170 kgsc. Reinforced Concrete #REF! #REF! #REF!
Furnishing and Stockpiling of RSB #REF! #REF! #REF!
Cutting, Bending & Placing of RSB #REF! #REF! #REF!
Backfill with Compaction (HB) 411,325.51 #REF! 15
Filter Drain 307,583.94 #REF! 236
Fabrication & installation of Concrete Piles #REF! #REF! #REF!
Rubble Masonry #REF! #REF! #REF!
10% 15% 20% 25% 30% 34% 38% 42% 44% 47% 51% 55%
1% 6% 10% 12% 15% 20% 25% 30% 35% 39% 45% 49%
2% 5% 8% 15% 18% 24% 29% 32% 37% 41% 45%
2% 7% 12% 14% 18% 22% 27% 33% 37% 41% 46% 50%
1% 6% 10% 12% 15% 20% 25% 30% 35% 39% 45% 49%
2% 3% 7% 13% 16% 23% 27% 30% 35% 40% 44%
2% 4% 6% 11% 14% 19% 24% 30% 34% 38% 43% 47%
3% 7% 11% 14% 17% 22% 28% 33% 37% 41% 46% 50%
2% 4% 6% 11% 14% 19% 24% 30% 34% 38% 43% 47%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CY 2017
July August September
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
86% 86% 86% 86% 86% 86% 86% 86% 86% 86% 86% 86%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
84% 84% 84% 84% 84% 84% 84% 84% 84% 84% 84% 84%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
74% 74% 74% 74% 74% 74% 74% 74% 74% 74% 74% 74%
80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
CY 2017
April May June
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
58% 62% 64% 68% 73% 77% 82% 86% 86% 86% 86% 86%
53% 56% 61% 65% 70% 74% 78% 83% 83% 83% 83% 83%
49% 52% 56% 59% 62% 66% 70% 75% 75% 75% 75% 75%
54% 58% 62% 67% 71% 75% 80% 84% 84% 84% 84% 84%
53% 56% 61% 65% 70% 74% 78% 83% 83% 83% 83% 83%
48% 50% 55% 59% 62% 65% 69% 74% 74% 74% 74% 74%
51% 54% 58% 62% 65% 70% 74% 80% 80% 80% 80% 80%
54% 58% 63% 67% 72% 76% 81% 85% 85% 85% 85% 85%
51% 54% 58% 62% 65% 70% 74% 80% 80% 80% 80% 80%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 83% 83% 83%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 83% 83% 83%
CY 2017
October November December
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
86% 86% 86% 86% 86% 86% 90% 100% 100% 100% 100% 100%
83% 83% 83% 83% 83% 83% 88% 95% 98% 100% 100% 100%
75% 75% 75% 75% 75% 75% 79% 85% 90% 93% 98% 100%
84% 84% 84% 84% 84% 84% 88% 93% 96% 98% 100% 100%
83% 83% 83% 83% 83% 83% 88% 95% 98% 100% 100% 100%
74% 74% 74% 74% 74% 74% 79% 84% 89% 93% 98% 100%
80% 80% 80% 80% 80% 80% 84% 87% 92% 95% 100% 100%
85% 85% 85% 85% 85% 85% 88% 92% 97% 99% 100% 100%
80% 80% 80% 80% 80% 80% 84% 87% 92% 97% 100% 100%
83% 83% 83% 83% 83% 83% #REF! #REF! #REF! #REF! #REF! #REF!
83% 83% 83% 83% 83% 83% #REF! #REF! #REF! #REF! #REF! #REF!
IBAWON RIS
Construction of Canal Lining of Main Canal with MFD
GANNT CHART
Total Project Duration: 360 Calendar Days
a. CONTRACT WORKS
CANAL SYSTEM
Clearing & Grubbing (Manual) 128,340.35 #REF! 92 8% 13%
211 KGSC Plain Concrete 416,107.78 #REF! 209 5% 10%
170 KGSC Reinforced Concrete #REF! #REF! #REF! 2%
Furnishing and Stockpiling of RSB #REF! #REF! #REF! 7% 12%
Cutting, Bending & Placing of RSB #REF! #REF! #REF! 6% 11%
Structure Excavation (Manual) 115,475.72 #REF! 15 7% 12%
Structure Backfill w/ Compaction ( 9,512,931.72 #REF! 236 2% 5%
July
1st Qtr 2nd Qtr
86% 86%
83% 83%
75% 75%
85% 85%
84% 84%
85% 85%
80% 80%
83% 83%
83% 83%
CY 2017
January February March
3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
18% 22% 25% 28% 32% 37% 43% 47% 51% 55%
15% 19% 23% 26% 30% 35% 40% 44% 48% 52%
5% 10% 15% 18% 24% 29% 32% 37% 41% 45%
17% 21% 24% 27% 31% 36% 42% 46% 50% 54%
16% 20% 23% 26% 30% 35% 41% 45% 49% 53%
17% 21% 24% 27% 31% 36% 42% 46% 50% 54%
8% 17% 14% 19% 24% 30% 34% 38% 43% 47%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CY 2017
July August September
3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
86% 86% 86% 86% 86% 86% 86% 86% 86% 86%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
84% 84% 84% 84% 84% 84% 84% 84% 84% 84%
85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
CY 2017
April May June
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
58% 62% 65% 68% 73% 77% 82% 86% 86% 86%
54% 59% 62% 65% 70% 74% 79% 83% 83% 83%
49% 52% 56% 59% 62% 66% 70% 75% 75% 75%
57% 61% 64% 67% 72% 76% 81% 85% 85% 85%
56% 60% 63% 66% 72% 75% 80% 84% 84% 84%
57% 61% 64% 67% 72% 76% 81% 85% 85% 85%
51% 54% 58% 62% 65% 70% 74% 80% 80% 80%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 83%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 83%
CY 2017
October November December
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
86% 86% 86% 86% 86% 86% 90% 95% 100% 100%
83% 83% 83% 83% 83% 83% 87% 92% 98% 100%
75% 75% 75% 75% 75% 75% 79% 85% 90% 93%
85% 85% 85% 85% 85% 85% 89% 94% 97% 99%
84% 84% 84% 84% 84% 84% 88% 93% 96% 98%
85% 85% 85% 85% 85% 85% 89% 94% 97% 99%
80% 80% 80% 80% 80% 80% 84% 87% 92% 95%
83% 83% 83% 83% 83% 83% #REF! #REF! #REF! #REF!
83% 83% 83% 83% 83% 83% #REF! #REF! #REF! #REF!
June
3rd Qtr 4th Qtr
86% 86%
83% 83%
75% 75%
85% 85%
84% 84%
85% 85%
80% 80%
83% 83%
83% 83%
December
3rd Qtr 4th Qtr
100% 100%
100% 100%
98% 100%
100% 100%
100% 100%
100% 100%
100% 100%
#REF! #REF!
#REF! #REF!
IBAWON RIS
Construction of Canal Lining of Lateral B with MFD
GANNT CHART
Total Project Duration: 360 Calendar Days
a. CONTRACT WORKS
CANAL SYSTEM
Clearing & Grubbing (Manual) 128,340.35 #REF!
211 KGSC Plain Concrete 416,107.78 #REF!
170 KGSC Reinforced Concrete #REF! #REF!
Furnishing and Stockpiling of RSB #REF! #REF!
Cutting, Bending & Placing of RSB #REF! #REF!
Structure Excavation (Manual) 115,475.72 #REF!
Structure Backfill w/ Compaction (Haul Borrow) 9,512,931.72 #REF!
42% 47% 51% 55% 59% 64% 68% 73% 77% 82%
41% 46% 50% 54% 58% 61% 64% 68% 71% 74%
37% 41% 45% 49% 52% 56% 59% 62% 66% 70%
41% 46% 50% 54% 58% 61% 64% 68% 71% 74%
41% 46% 50% 54% 58% 61% 64% 68% 71% 74%
40% 45% 50% 54% 57% 62% 67% 71% 75% 80%
33% 37% 41% 44% 47% 50% 54% 58% 63% 70%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CY 2017
September October November
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr
86% 86% 86% 86% 86% 86% 86% 86% 86% 90%
78% 78% 78% 78% 78% 78% 78% 78% 78% 82%
75% 75% 75% 75% 75% 75% 75% 75% 75% 79%
78% 78% 78% 78% 78% 78% 78% 78% 78% 82%
78% 78% 78% 78% 78% 78% 78% 78% 78% 82%
85% 85% 85% 85% 85% 85% 85% 85% 85% 87%
75% 75% 75% 75% 75% 75% 75% 75% 75% 78%
83% 83% 83% 83% 83% 83% 83% 83% 83% #REF!
83% 83% 83% 83% 83% 83% 83% 83% 83% #REF!
ay June
4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
mber December
4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
a. CONTRACT WORKS
CANAL SYSTEM
Clearing & Grubbing (Manual) ### #REF! 92 5%
211 KGSC Plain Concrete ### #REF! 209 3%
170 KGSC Reinforced Concrete #REF! #REF! #REF!
Furnishing and Stockpiling of RSB #REF! #REF! #REF! 3%
Cutting, Bending & Placing of RSB #REF! #REF! #REF! 3%
Structure Excavation (Manual) ### #REF! 15 4%
Structure Backfill w/ Compaction (Haul Borrow) ### #REF! 236 2%
July
1st Qtr
86%
78%
75%
78%
78%
85%
75%
83%
83%
CY 201
January February March
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CY 201
July August September
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr
86% 86% 86% 86% 86% 86% 86% 86% 86% 86%
78% 78% 78% 78% 78% 78% 78% 78% 78% 78%
75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
78% 78% 78% 78% 78% 78% 78% 78% 78% 78%
78% 78% 78% 78% 78% 78% 78% 78% 78% 78%
85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
CY 2017
arch April May June
4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr
51% 55% 59% 64% 68% 73% 77% 82% 86% 86%
50% 54% 58% 61% 64% 68% 71% 74% 78% 78%
45% 49% 52% 56% 59% 62% 66% 70% 75% 75%
50% 54% 58% 61% 64% 68% 71% 74% 78% 78%
50% 54% 58% 61% 64% 68% 71% 74% 78% 78%
50% 54% 57% 62% 67% 71% 75% 80% 85% 85%
41% 44% 47% 50% 54% 58% 63% 70% 75% 75%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CY 2017
ember October November Decemb
4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr
86% 86% 86% 86% 86% 86% 86% 90% 100% 100%
78% 78% 78% 78% 78% 78% 78% 82% 87% 91%
75% 75% 75% 75% 75% 75% 75% 79% 85% 90%
78% 78% 78% 78% 78% 78% 78% 82% 87% 91%
78% 78% 78% 78% 78% 78% 78% 82% 87% 91%
85% 85% 85% 85% 85% 85% 85% 87% 92% 100%
75% 75% 75% 75% 75% 75% 75% 78% 84% 89%
83% 83% 83% 83% 83% 83% 83% #REF! #REF! #REF!
83% 83% 83% 83% 83% 83% 83% #REF! #REF! #REF!
June
2nd Qtr 3rd Qtr 4th Qtr
December
2nd Qtr 3rd Qtr 4th Qtr
ACTIVITY Unit
A. DIRECT COST
1. CIVIL WORKS
I. CONTRACT WORKS
DIVERSION WORKS
Package 2
1. Construction of Gemiranat Checkgate (Mayorga)
w/ Concrete Canal lining
a. Clearing & Grubbing (Manual) sq.m.
b. Diversion & Care of River cu.m.
d. Structure Excavation (Manual) cu.m.
e. Structure Backfill w/ Compaction (Haul Borrow) cu.m.
f. 211 KGSC Reinforced Concrete cu.m.
g. Furnishing and Stockpiling of RSB kgs
h. Cutting, Bending & Placing of RSB kgs
j. Rubble Masonry cu.m.
k. Grouted Riprap cu.m.
l. Boulder Riprap cu.m.
m. Gravel Blanket cu.m.
n. Filter Drain cu.m.
o. Filter Drain Pipe m.
p. Pipe Railings m.
q. Fabrication and Installation 18" dia RCP pcs
sub-total (package 2)
CANAL SYSTEM
Package 3
A. Construction of Canal Lining at Main Canal (Sta 2+380-3+187)
a. Clearing & Grubbing (Manual) sq.m.
b. 211 KGSC Plain Concrete cu.m.
c. Structure Excavation (Manual) cu.m.
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m.
2-b. Construction of MFD Canal Lining at Main Canal (Sta 0+000-Sta 0+800)
a. Clearing & Grubbing (Manual) sq.m.
d. 170 KGSC Reinforced Concrete cu.m.
e. Furnishing and Stockpiling of RSB kgs
f. Cutting, Bending & Placing of RSB kgs
c. Structure Excavation (Manual) cu.m.
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m.
sub-total (Package 3)
Package 4
4-a. Construction of Canal Lining at Lateral B
a. Clearing & Grubbing (Manual) sq.m.
b. 211 KGSC Plain Concrete cu.m.
c. Structure Excavation (Manual) cu.m.
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m.
sub-total (Package 4)
Package 5
5-a. Canal lining at Lateral C
a. Clearing & Grubbing (Manual) sq.m.
b. 211 KGSC Plain Concrete cu.m.
c. Structure Excavation (Manual) cu.m.
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m.
5-b. Construction of MFD Canal Lining at Lateral C
a. Clearing & Grubbing (Manual) sq.m.
d. 170 KGSC Reinforced Concrete cu.m.
e. Furnishing and Stockpiling of RSB kgs
f. Cutting, Bending & Placing of RSB kgs
c. Structure Excavation (Manual) cu.m.
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m.
CONTROL GATES
Package 6
Fabrication & Installation of Steel gates
a. Main Canal
a.1 Steelgate (1.25m x 0.60) @ Sta 1+070, 1+500, 2+020, units
2+160,3+090, 3+210, 3+298, 3+362
a.2 Steelgate (1.0m x 0.60) @ Sta 0+680,0+800,1+630,1+890 units
a.3 Steelgate (1.7m x 1.40) @ Sta 2+200 units
a.4 Steelgate (1.4m x 0.60) @ Sta 0+680 units
a.5 Steelgate (1.60m x 0.70) @ Sta 2+888 units
a.6 Steelgate (1.60m x 1.0) @ Sta 2+035, 3+090, 3+298,3+426 units
b. Lateral B
b.1 Steelgate (1.0m x 0.60) @ Sta 0+690 units
b.2 Steelgate (1.60m x 0.70) @ Sta 0+000, 0+440, 0+690 units
c. Lateral C
c.2 Steelgate (1.4m x 0.60) @ Sta 0+875 units
c.3 Steelgate (1.60m x 0.70) @ Sta 0+000, 0+360 units
sub-total (Steelgates)
Sub-total (FAW)
GRAND TOTAL
PREPARED BY: SUBMITTED BY:
ROSALYN S. DELFIN
Engineering Assistant A
NATIONAL IRRIGATION ADMINISTRATION
IBAWON RIS, Mayorga, Leyte
DETAILED BREAKDOWN OF CY 2017 PROGRAM OF WORKS
TYPHOON YOLANDA DAMAGES (UPGRADINGWORKS)
Sta 0+800)
1,778.27 5.20 9,247.00 1,102.53 746.87 551.26
151.48 8,021.28 1,215,063.49 145,807.07 97,204.72 72,904.29
5,119.10 56.67 290,099.40 34,809.88 23,189.52 17,404.94
5,119.10 11.38 58,255.36 7,013.17 4,658.38 3,480.99
368.16 104.00 38,288.64 4,594.64 3,063.09 2,297.32
469.76 1,058.40 497,193.98 59,664.22 39,774.58 29,829.76
8 66,984.48
4 66,859.97
1 73,056.72
1 68,960.90
1 69,495.47
4 70,670.65
1 66,859.97
3 69,495.47
1 68,960.90
2 69,495.47
1 395,880.00
1 95,011.20
14 10,000.00
3 10,000.00
3 10,000.00
SUBMITTED BY:
SANTOS D. MERACAP,JR
NIS Head / Principal Engineer A
Attachment "D"
ST TOTAL
TOTAL Unit Cost Project Cost
3,388,894.46
5,102.13 6.55 24,754.80
677,141.58 11,133.63 3,281,526.12
13,660.88 131.04 66,202.72
193,701.96 1,333.58 938,720.30
4,311,203.94
19,049,122.62 (0.02)
-0.003053435114504
-
535,875.84
267,439.88
73,056.72
68,960.90
69,495.47
282,682.60
1,297,511.41
66,859.97
208,486.41
275,346.38
68,960.90
138,990.94
207,951.84
395,880.00
95,011.20
490,891.20
2,271,700.83
24,709,717.91
140,000.00
-
30,000.00
30,000.00
200,000.00
24,709,717.91
249,237.38
249,238.11
498,475.49
747,713.72
25,955,907.12
25,955,907.12
APPROVED BUDGET FOR CONTRACT
IBAWON RIS
TOTAL INDIRECT
ITEM
NO. DESCRIPTION UNIT QUANTITY ESTIMATED COST COST TOTAL COST UNIT COST
MARK-UPS
CIVIL WORKS
Mac Arthur
Package 1
Construction of Canal Lining w/ Protection Works
@ Lateral A, - - -
a. Clearing and grubbing (manual) sq.m. 469.25 2,440.10 755.49 3,195.59 6.81
b. 211 KGSC Plain Concrete cu.m. 271.95 2,400,804.51 526,261.32 2,927,065.83 10,763.25
c. Furnishing and Stockpiling of RSB kgs 10,064.15 721,297.63 137,979.50 859,277.13 85.38
d. Cutting, Bending & Placing of RSB kgs 10,064.15 114,530.03 35,526.45 150,056.48 14.91
e. 170 KGSC Reinforced Concrete cu.m. 38.78 289,826.98 63,089.63 352,916.61 9,100.48
f. Furnishing and Stockpiling of RSB kgs 1,751.66 125,541.47 24,015.26 149,556.73 85.38
g. Cutting, Bending & Placing of RSB kgs 1,751.66 19,933.89 6,183.36 26,117.25 14.91
i. Filter Drain( graded gravel) cu.m. 148.80 231,339.36 49,975.97 281,315.33 1,890.56
j. Filter Drain Pipe cu.m. 466.00 180,188.22 34,306.92 214,495.14 460.29
k. Structure Backfill Compaction (Haul Borrow) cu.m. 740.12 783,343.01 171,589.42 954,932.43 1,290.24
l. Fabrication & installation of Concrete Piles pc 310.00 5,134,855.50 1,044,507.80 6,179,363.30 19,933.43
m. Furnishing and Stockpiling of RSB kgs 30,053.25 2,153,916.43 412,030.06 2,565,946.49 85.38
n. Cutting, Bending & Placing of RSB kgs 30,053.25 342,005.99 106,087.97 448,093.96 14.91
o. Rubble Masonry cu.m. 405.63 2,411,425.73 556,293.15 2,967,718.88 7,316.32
Sub-total (package 1) 14,911,448.85 3,168,602.30 18,080,051.15
Mayorga
Diversion Works
Package 2
1. Construction of Gemiranat Checkgate
a. Clearing & Grubbing (Manual) sq.m. 880.00 4,576.00 1,416.80 5,992.80 6.81
b. Cofferdam & Care of River cu.m. 21.36 3,039.96 943.47 3,983.43 186.49
PROGRAM OF WORK CY 2017
TYPHOON YOLANDA DAMAGES (UPGRADING WORKS)
Balire-Ibawon-Gibuga RIS
National Irrigation Administration
TOTAL INDIRECT
ITEM
NO. DESCRIPTION UNIT QUANTITY ESTIMATED COST COST TOTAL COST UNIT COST
MARK-UPS
c. Dewatering Activities cu.m. 66.67 31,068.22 9,643.82 40,712.04 610.65
d. Structure Excavation (Manual) cu.m. 106.18 11,042.72 3,427.49 14,470.21 136.28
e. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 824.85 873,021.24 191,233.22 1,064,254.46 1,290.24
f. 211 KGSC Reinforced Concrete cu.m. 25.97 229,266.02 50,255.59 279,521.61 10,763.25
g. Furnishing and Stockpiling of RSB kgs 1,558.06 111,666.16 21,361.00 133,027.16 85.38
h. Cutting, Bending & Placing of RSB kgs 1,558.06 17,730.72 5,499.95 23,230.67 14.91
j. Rubble Masonry cu.m. 3.97 23,601.21 5,444.58 29,045.79 7,316.32
k. Grouted Riprap cu.m. 9.60 46,367.62 13,892.35 60,259.97 6,277.08
l. Boulder Riprap cu.m. 9.47 19,167.85 4,500.05 23,667.90 2,499.25
PROGRAM OF WORK CY 2017
TYPHOON YOLANDA DAMAGES (UPGRADING WORKS)
Balire-Ibawon-Gibuga RIS
National Irrigation Administration
TOTAL INDIRECT
ITEM
NO. DESCRIPTION UNIT QUANTITY ESTIMATED COST COST TOTAL COST UNIT COST
MARK-UPS
m. Gravel Blanket cu.m. 4.13 7,380.97 1,569.90 8,950.87 2,167.28
n. Filter Drain (Graded Gravel) cu.m. 5.69 8,846.24 1,911.04 10,757.28 1,890.56
o. Filter Drain Pipe m. 13.00 5,026.71 957.06 5,983.77 460.29
p. Pipe Railings m. 34.18 13,201.00 2,526.24 15,727.24 460.13
q. Fabrication and Installation 18" dia RCP pcs 4.00 10,429.59 2,374.72 12,804.31 3,201.04
1,415,432.23 316,957.28 1,732,389.51
CANAL SYSTEM
Package 3
3.a. Construction of Canal Lining at Main Canal (Sta 2+380-3+187)
a. Clearing & Grubbing (Manual) sq.m. 3,779.36 19,652.67 6,084.77 25,737.44 6.81
b. 211 KGSC Plain Concrete cu.m. 294.74 2,601,997.14 570,363.16 3,172,360.30 10,763.25
c. Structure Excavation (Manual) cu.m. 505.21 52,541.84 16,308.18 68,850.02 136.28
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 703.91 745,018.34 163,194.49 908,212.84 1,290.24
3,419,209.99 755,950.60 4,175,160.59
3-b. Construction of MFD Canal Lining at Main Canal (Sta 0+000-Sta 0+800)
a. Clearing & Grubbing (Manual) sq.m. 2,000.00 10,400.00 3,220.00 13,620.00 6.81
d. 170 KGSC Reinforced Concrete cu.m. 171.20 1,279,483.74 278,518.43 1,558,002.17 9,100.48
e. Furnishing and Stockpiling of RSB kgs 5,768.00 413,392.56 79,079.28 492,471.84 85.38
f. Cutting, Bending & Placing of RSB kgs 5,768.00 65,639.84 20,361.04 86,000.88 14.91
c. Structure Excavation (Manual) cu.m. 368.16 38,288.64 11,884.20 50,172.84 136.28
PROGRAM OF WORK CY 2017
TYPHOON YOLANDA DAMAGES (UPGRADING WORKS)
Balire-Ibawon-Gibuga RIS
National Irrigation Administration
TOTAL INDIRECT
ITEM
NO. DESCRIPTION UNIT QUANTITY ESTIMATED COST COST TOTAL COST UNIT COST
MARK-UPS
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 469.76 497,193.98 108,909.16 606,103.15 1,290.24
2,293,998.76 501,972.11 2,806,370.87
sub-total (Package 3) 5,713,208.75 1,257,922.71 6,981,531.46
Package 4
4-a. Construction of Canal Lining at Lateral B
a. Clearing & Grubbing (Manual) sq.m. 3,702.72 19,254.14 5,961.38 25,215.52 6.81
b. 211 KGSC Plain Concrete cu.m. 343.82 3,035,280.78 665,339.83 3,700,620.61 10,763.25
c. Structure Excavation (Manual) cu.m. 368.16 38,288.64 11,884.20 50,172.84 136.28
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 669.76 708,873.98 155,277.16 864,151.15 1,290.24
3,801,697.54 838,462.57 4,640,160.11
PROGRAM OF WORK CY 2017
TYPHOON YOLANDA DAMAGES (UPGRADING WORKS)
Balire-Ibawon-Gibuga RIS
National Irrigation Administration
TOTAL INDIRECT
ITEM
NO. DESCRIPTION UNIT QUANTITY ESTIMATED COST COST TOTAL COST UNIT COST
MARK-UPS
Package 5
5-a. Canal lining at Lateral C
a. Clearing & Grubbing (Manual) sq.m. 2,681.28 13,942.66 4,316.86 18,259.52 6.81
b. 211 KGSC Plain Concrete cu.m. 276.08 2,437,264.61 534,253.45 2,971,518.06 10,763.25
c. Structure Excavation (Manual) cu.m. 1,200.11 124,811.44 38,739.55 163,550.99 136.28
d. Structure Backfill w/ Compaction (Haul Borrow) cu.m. 129.06 136,597.10 29,921.27 166,518.38 1,290.24
2,712,615.81 607,231.13 3,319,846.94
Package 6
Fabrication & Installation of Steel gates
PROGRAM OF WORK CY 2017
TYPHOON YOLANDA DAMAGES (UPGRADING WORKS)
Balire-Ibawon-Gibuga RIS
National Irrigation Administration
TOTAL INDIRECT
ITEM
NO. DESCRIPTION UNIT QUANTITY ESTIMATED COST COST TOTAL COST UNIT COST
MARK-UPS
a. Main Canal
a.1 Steelgate (1.25m x 0.60) @ Sta 1+070, 1+500, 2+020 units 8 453,248.40 82,627.44 535,875.84 66,984.48
2+160,3+090, 3+210, 3+298, 3+362 - - -
a.2 Steelgate (1.0m x 0.60) @ Sta 0+680,0+800,1+630, units 4 226,204.20 41,235.68 267,439.88 66,859.97
a.3 Steelgate (1.7m x 1.40) @ Sta 2+200 units 1 61,776.73 11,279.99 73,056.72 73,056.72
a.4 Steelgate (1.4m x 0.60) @ Sta 0+680 units 1 58,322.75 10,638.15 68,960.90 68,960.90
a.5 Steelgate (1.60m x 0.70) @ Sta 2+888 units 1 58,773.55 10,721.92 69,495.47 69,495.47
a.6 Steelgate (1.60m x 1.0) @ Sta 2+035, 3+090, 3+29 units 4 239,058.32 43,624.28 282,682.60 70,670.65
b. Lateral B
b.1 Steelgate (1.0m x 0.60) @ Sta 0+690 units 1 56,551.05 10,308.92 66,859.97 66,859.97
b.2 Steelgate (1.60m x 0.70) @ Sta 0+000, 0+440, 0+69 units 3 176,320.65 32,165.76 208,486.41 69,495.47
PROGRAM OF WORK CY 2017
TYPHOON YOLANDA DAMAGES (UPGRADING WORKS)
Balire-Ibawon-Gibuga RIS
National Irrigation Administration
TOTAL INDIRECT
ITEM
NO. DESCRIPTION UNIT QUANTITY ESTIMATED COST COST TOTAL COST UNIT COST
MARK-UPS
c. Lateral C
c.2 Steelgate (1.4m x 0.60) @ Sta 0+875 units 1 58,322.75 10,638.15 68,960.90 68,960.90
c.3 Steelgate (1.60m x 0.70) @ Sta 0+000, 0+360 units 2 117,547.10 21,443.84 138,990.94 69,495.47
CONTRACT WORKS
Package 1 PROJECTED 2.00 7.00 15.00 25.00 37.00 50.00 63.00 75.00 85.00 93.00
Canal Lining w/ Protection Works Lat A 21,363.719 23.45 ACTUAL
Package 2 PROJECTED 1.99 6.99 15.00 25.00 37.00 50.00 63.00 75.00 85.00 93.00
Gemiranat Checkgate w/ canal lining 3,609.693 3.96 ACTUAL
Package 3 PROJECTED 1.56 7.56 16.56 27.56 40.56 53.56 64.56 73.56 82.56 89.56
Canal Lining @ MC and MFD 27,372.339 30.04 ACTUAL
Package 4 PROJECTED 3.00 8.00 17.00 28.00 41.00 54.00 67.00 79.00 88.00 94.00
Canal Lining @ Lat B and MFD 16,392.315 17.99 ACTUAL
Package 5 PROJECTED 2.00 9.00 18.00 28.00 41.00 54.00 67.00 78.00 87.00 94.00
Canal Lining @ Lat C and MFD 16,057.711 17.62 ACTUAL
Package 6 PROJECTED 3.00 9.00 17.00 28.00 41.00 54.00 67.00 78.00 87.00 94.00
Fabrication and Installation of steelgates 1,783.000 1.96 ACTUAL
PROJECTED 4.00 12.00 22.00 34.00 48.00 60.00 70.00 80.00 85.00 90.00
II INSTITUTIONAL DEVELOPMENT PROGRAM 906.771 1.00 ACTUAL
PROJECTED 3.00 10.00 25.00 40.00 50.00 65.00 75.00 80.00 85.00 90.00
III CONSTRUCTION SURVEY 906.771 1.00 ACTUAL
PROJECTED 2.00 7.00 15.00 25.00 37.00 50.00 63.00 75.00 85.00 93.00
IV Field Support, Supervision & Monitoring 2,720.328 2.99 ACTUAL
91,112.65 100 PROJECTED #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
CY PHYSICAL STATUS
ACTUAL
NEW AREA Projected
__ (Has.) Actual
AREA GENERATION
REHAB AREA Projected
_ (Has.) Actual
Prepared by Submitted by
%
NOV DEC 2 5 8 10 12 13 13 12 10 8 5 2
(17) (18) (19) 2 7.00 15.00 25.00 37.00 50.00 63.00 75.00 85.00 93.00 98 100
100
2017
98.00 100.00 90 JAN FEB MAR APR MAY JUNE JULY AUG SEPT Oct nov dec
P2 72 180.48 289 360.97 433.16 469.26 469.260 433.163 360.969 288.7754 180.4847 72.1939 3,610
98.00 100.00 1DP 36.27 72.54 90.68 108.81 126.95 108.81 90.68 90.68 45.34 45.34 45.34 45.34 907
80 P1 427.27 1,068.19 1,709.10 2,136.37 2,563.65 2,777.28 2,777.28 2,563.65 2,136.37 1,709.10 1,068.19 427.27 21,364
93.56 96.38 P3 1,094.89 1,642.34 2,463.51 3,010.96 3,558.40 3,558.40 3,010.96 3,010.96 2,463.51 1,916.06 1,094.89 547.45 27,372
P4 491.77 819.62 1,475.31 1,803.15 2,131.00 2,131.00 2,131.00 1,967.08 1,475.31 983.54 655.69 327.85 16,392
98.00 100.00 70 P5 321.15 1,124.04 1,445.19 1,605.77 2,087.50 2,087.50 2,087.50 1,766.35 1,445.19 1,124.04 642.31 321.15 16,058
P6 53.49 106.98 142.64 196.13 231.79 231.79 231.790 196.130 160.470 124.810 71.320 35.660 1,783
98.00 100.00 P7 - - - - - - - - - - - - -
60
98.00 100.00
50 Can Sys 2,335.08 4,654.19 7,093.11 8,556.25 10,340.55 10,554.18 10,006.74 9,308.04 7,520.38 5,732.74 3,461.08 1,623.72
95.00 100.00 #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #REF! #REF! #REF! #REF! #REF! #REF!
20
98.00 100.00
10
0
#DIV/0! #DIV/0!
IDP
fUEL #REF! #REF! #REF! #REF! #REF! #REF! 81,186.0840
os #REF! #REF! #REF! #REF! #REF! #REF! 1.470
2011
AUG SEP OCT NOV DEC 2012 2013 2014 2015 TOTAL 2010
1,179 ###
- ### -
5,386
1,723 ###
#REF! ###
#REF! #REF! - ###
NATIONAL IRRIGATION ADMINISTRATION
IBAWON RIS, MacArthur, Leyte
TYPHOON YOLANDA DAMAGES (UPGRADING WORKS)
MANPOWER REQUIREMENT, EQUIPMENT REQUIREMENT & CASH REQUIREMENT
CY 2017 PROGRAM OF WORK
GRAND TOTAL
PARTICULARS DESCRIPTION Peso Counterpart LP-Cash TOTAL
F.O. C.O. F.O. C.O. PC LP
1. Monthly Personnel 7
2. Daily Personnel 4
3. Contractual 6
II. EQUIPMENT REQUIREMENT Units
(see attached list of equipment)
III. MATERIAL REQUIREMENT
IV. CASH REQUIREMENT
A. DIRECT COST
1. CIVIL WORKS
a. Contract Works
Diversion Works 3,609,693.44 3,609,693.44 -
Canal System 81,097,604.42 81,097,604.42 -
Control gates 3,272,437.67 3,272,437.67 -
b. Force Account Works - - -
Staff gauges 2,697,393.97 2,697,393.97 -
- - -
4. Parcellary Mapping/Survey
6. Procurement of Equipment
& Vehicles
8. Consulting Services
10. Contingencies - -
Prepared by Submitted by
Attachment "C-5"
GRAND TOTAL
TOTAL
TOTAL
3,609,693.44
81,097,604.42
3,272,437.67
-
2,697,393.97
-
906,771.20
906,771.20
2,720,327.74
95,210,999.64
Attachment "A"
AGENCY : NATIONAL IRRIGATION ADMINISTRATION Program No.: 1
SUBJECT : CY 2016 Date : July 16, 2015
PROJECT TITLE : UNFUNDED UNDER OPARR LISTING (526M)
I. GENERAL INFORMATION
1. Project Location 5. Project Cost Original Revised
a. Region VIII a. Peso Counterpart (PM) 5,423,235.84
b. Municipality Mac Arthur b. Loan Procceds (PM)
c. Province Leyte c. Others (Equity)
d. Total 5,423,235.84
2. Service Area 300 has.
a. New Area 6. Appropriation
b. Rehab Area 40 has a. Source of Fund
c. Restored
3. Source of Water Balire River b. Amount 5,423,235.84
4. Type of Irrigation
a. Run-off the River 7. Implementation Period Original Revised
b. Reservoir a. Physical Starting Date : January 2016
c. Groundwater Pump b. Completion Date : June 2016
II. WORK TO BE DONE (For the current year)
2. LOAN PROCEEDS
CMD FORM Y-2A IBAWON RIS, MacArthur, Leyte
CY 2016 SCHEDULE EXPENDITURES AND STATUS CLIMATE CHANGE YOLANDA CY 2016 POW
% 2016
ITEM ESTIMATED COST
MAJOR ITEM OF WORK CLASS Wt.ORIG./ PARTICULAR
NO. ORIGINAL/REVISED
REV.
JAN FEB MAR APRIL MAY
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
I. CIVIL WORKS
CONTRACT WORKS
PROJECTED 2,836.697 10,131.060 20,262.120 30,393.180 37,687.543
Canal System 40,524.238 89.94 ACTUAL
PROJECTED - - - - -
- ACTUAL
2016
%
JUNE
(12) (16)
100
40,524.240
90
-
80
70
906.772
60
906.772
50
2,720.328
40
-
30
20
10
0
100.000 -
45,058.108
45,058.108