You are on page 1of 2

Material Receiving / Inspection Report

AB-MRIR-1.21

Inspection No. AB-MRIR-006 Invoice No. 1


Inspection Date 23/02/2021 Date 21/02/2021
Inspector Saleem Khan P.O. Ref. No. UNC_4500030879

REJECTED
ITEM MATERIAL DESCRIPTION QTY PASS QTY REJECTION DETAILS
QTY
1 LED Panel Light 60x60. 45W, 220V 30

8
Action after Inspection Details Quality Inspector Signature Stamp
Accepted
Rejected
Rework Quality Manager Signature
Scrap
Return to Vendor

You might also like