Professional Documents
Culture Documents
:
Report Date:
230116161470495R1
Jan 19, 2023
GENERAL INFORMATION
Inspection Type Normal
Buyer Name XXXXXX
Vendor Name N/A
Factory Name N/A
DANAS/ OVIO Operator desk/
Item Number
OVIO Triangle top/ HARDWARE BOX
DANAS(CTN 1/3, CTN 2/3 ,CTN 3/3) /
OVIO Operator desk(Desk top,
Product description Metal leg,Partition,Metal wire rack)/
OVIO Triangle top(Small triangle top )/
HARDWARE BOX(EXTRA HARDWARE)
P.O. Number N/A
Service performed Loading Supervision
Inspection Date Jan 18, 2023
Inspection Location Anji,Zhejiang,China
Total Cartons 407
INSPECTION RESULTS
OVERALL CONCLUSION Conform
A. Quantity Conformity ☒
B. Product Conformity ☒ 2
C. Loading Condition Check
Container Condition check ☒
D. Loading Stuff Check ☒
E Sealing Check ☒
A. Quantity Conformity
Presented Qty
Order Shipment QTY Not
Item Packed Units Finished
P.O. No Quantity Qty Packed Qty Finished
Number Cartons Not Packed
(sets) (sets) (pieces/sets) (pieces/sets)
(cartons) (pieces/sets)
CTN 1/3 N/A 113 113 0 0
CTN 2/3 N/A 450 450 113 113 0 0
CTN 3/3 N/A 113 113 0 0
Desk top N/A 80 80 20 20 0 0
Metal leg N/A 80 80 20 20 0 0
Partition N/A 80 80 20 20 0 0
Metal wire rack N/A 40 40 5 5 0 0
Small triangle top N/A 20 20 2 2 0 0
EXTRA N/A 0
1 1 1 1 0
HARDWARE
Total 751 751 407 407 0 0
Total N/A cartons were selected randomly
Selected carton number:N/A
E. Sealing Conformity
Container Number Shipper Seal# TESTCOO Seal#
MRKU0891901 ML-CN2888087 Nil
VALIDATION TEAM
Inspected by TC770779
Inspection date Jan 18, 2023
Reviewed by Leon Li
Review date 25 January 2023
Approved by Steven Jin
Review date 25 January 2023
I. INSPECTION PHOTO ( All inspection related photos with descriptions attached here )
Packing list