: IN-TJ-5601-22084
Page 1 of 10
Non-negotiable
Inspection Report
(Non-negotiable)
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 2 of 10
Non-negotiable
Contents
1. Background information........................................................................................................................................ 3
2. Instrument ............................................................................................................................................................ 3
9. Photos ................................................................................................................................................................... 7
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 3 of 10
Non-negotiable
1. Background information
2. Instrument
During the inspection, the following instrument calibration status has been checked for inspection:
Calibrated[1] [2] Certificate No.
No. Name ID No. Measuring range
(Yes/No/NA) (Optional )
[1]Calibrated
--- “Yes” means the instrument was calibrated and now is in the period of validity.
--- “No” means the instrument should be calibrated, in fact it was never calibrated or not calibrated before the expiry date.
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 4 of 10
Non-negotiable
--- “NA” means the instrument does not need to be calibrated in the view of its function.
[2] All calibrated instruments must be provided the total pages copy of calibration certificate.
During inspection, factory only agrees to sample the quantity required by customer from 2 packages. One
package was not completed and the inspector numbered it as 17. There were obvious pits on the narrow-ribbed
roof platform at the top of the package, and there were obvious black spots on the second and third samples.
The second package was numbered 5. After opening the package, there were two pits at the bottom of the side.
No obvious defects were found in the other 17 samples sampled.
3.3 Remark: The result of visual quality check randomly was subject to buyer’s evaluation.
When SGS inspectors arrived at the mill, the narrow-ribbed roof decks had 18 packages, 16 packed and 2
unpacked. According to the requirements of the customer, the inspector conducted a random inspection of the
packaging. The outermost layer of Outer package is wrapped in iron sheet and fixed with steel belt. The fastened
by 3 pieces steel straps at the radial direction and 4 pieces steel straps at the circumferential direction. The first
layer of Inner package is paper, second layer is plastic bag.
4.3 Remark: As no detailed requirement of packing was specified by client and any document, so the result of
packing check was subject to client’s evaluation.
The SGS inspectors did not find any marks on the outer package or the product.
5.3 Remark: The result of marking check randomly was subject to client’s evaluation.
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 5 of 10
Non-negotiable
6.3 Remark: As the customer did not provide a detailed packing list, so the result of quantity check by package
was subject to client’s evaluation.
According to client’s requirement ,SGS inspectors randomly checked the sizes of 20 pieces of narrow rib roof
decks, see the tables below for details:
Table1:
Tol Measured value(mm)
Measure
Req. .
ment
(mm) (m N-01 N-02 N-03 N-4 N-5 N-6 N-7 N-8 N-9 N-10
item
m)
Profile 38.02
38.1 \ 38.0 37.5 38.0 37.0 38.0 38.28 38.0 38.09 38.28
depth 6
Profile 152.0 152.0 152.3
152.4 \ 152.0 151.0 152.0 152.0 152.0 152.0 152.0
pitch 5 6 9
Rib
25.4 \ 38.0 38.0 38.0 38.0 38.0 38.21 38.05 38.15 38.02 38.21
width
Thickne 1.0~
\ 1.16 1.17 1.17 1.17 1.18 1,.16 1.155 1.155 1.15 1.17
ss 1.5
Note:“N”means Narrow rib roof deck
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 6 of 10
Non-negotiable
Table2:
Tol Measured value(mm)
Measure
Req. .
ment
(mm) (m N-011 N-12 N-013 N-14 N-15 N-16 N-17 N-18 N-19 N-20
item
m)
Profile
38.1 \ 38.06 38.16 38.05 38.14 38.12 38.06 38.06 38.03 37.96 38.06
depth
Profile 152.3 152.1 151.9 152.1 152.2 151.9 151.9 152.0 152.3 152.0
152.4 \
pitch 9 8 9 6 0 9 9 5 0 7
Rib
25.4 \ 38.06 38.12 38.19 38.07 38.06 38.02 38.01 38.06 37.79 38.13
width
Thickne 1.0~
\ 1.17 1.17 1.17 1.17 1.16 1.18 1,.17 1.18 1.165 1.168
ss 1.5
Note:“N”means Narrow rib roof deck
7.3. Remark: Rib width is not in line with customer requirements. The factory has informed the customer;so
the result of dimension check randomly was subject to client’s evaluation.
According to the client's requirements, 275 grams per square meter, which is 38 microns when converted into
microns, each side is 19 microns, SGS inspectors randomly measured the thickness of the zinc layer in 20
Narrow rib roof decks. The measured thickness of zinc layer varies from 30 to 36um.
8.3 Remark: the result of witness coating thickness check was subject to client’s evaluation.
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 7 of 10
Non-negotiable
9. Photos
Photo 1. Visual quality checks randomly(Topside) Photo 2.Visual quality checks randomly(backside)
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 8 of 10
Non-negotiable
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 9 of 10
Non-negotiable
Photo 12. Witness Coating thickness check Photo 13. Witness Coating thickness check
Photo 14. Witness Coating thickness check Photo 15. Witness Coating thickness check
3rd floor, C-13, No.80, Haiyun Street, TEDA, Tianjin, China, 300457
st
IND-F-OPS-05-21 [V:03, Jul.01 , 2017] Tel: (86-22) 5999 5001
Report No.: IN-TJ-5601-22084
Page 10 of 10
Non-negotiable
10. Timesheet
THIS REPORT ONLY REFLECTED OUR ACTUAL FINDINGS. THE INSPECTION WAS DONE TO THE BEST
OF OUR KNOWLEDGE AND ABILITY AND WITH DUE CARE. THE FINDINGS ARE VALID AS FOR TIME
AND PLACE OF INSPECTION.
Reviewed Approved
Issued by: Qingxiang Lei by: Charles Qi by: Lynn Ma
Title or Title or Title or Inspection
position: Inspector position: Coordinator position: Manager
December 7,
Date: December 7, 2022 Date: 2022 Date: December 12, 2022
End of Report