INSPECTION RELEASE NOTE

FOR COATING
Control Report No.: F.01.09/QC

Report No. Page 1/1 Date

Client

Project

Contract No.

1. Material inspection report (MTC, Material Retest Report, etc.);


2. Material traceability report;
Scope of inspection 3. Welding inspection report
4. Dimensional inspection record(after welding complete);
5. NDT test report(VT,PT and MT);
6. Mark-up shop drawing
DESCRIPTION OF GOODS
Qty
No. Member No. Packages No.
(pcs)

1 1

 Total 1

Based on the results of our interventions in the manufacturer shops:

We certify that the goods inspected are in conformity with the quality and quantity and packing indicated
in mentioned the specification TZ-TAN-93-WPR2-320003 & UT-MID-60-WPR2-210010.

The goods have been inspected prior to coating and found in good condition and are released for next
step.

Note: MTC-Mill Test Certificate, NDT-Non Destructive Testing, VT-Visual Testing,MT- Magnetic Particle
Testing.PT-Dye Penetrant Testing.

CONCLUSION: Verified and release.

DDC Inspector: DDC 3rd Party BBN


Name: Name: Name:

Signature: Signature: Signature: