You are on page 1of 31

CORPORATE

HANDBOOK

Anytime . everywhere . everyday . preserving your assets


Company Organization
PROFILE CHART

CHAIRMAN
 RESERVING YOUR ASSETS
P
> Anytime
• From construction phase to maintenance CEO
programs, shutdowns and outages, we assess,
design and execute the right technical solutions,
maximizing industrial asset life.
> Everywhere
• From our base in Vietnam, we operate onshore
VIVABLAST MALAYSIA VIVABLAST VIETNAM VIVABLAST THAILAND VIVABLAST MYANMAR
and offshore in South-East Asia supporting our
Customers wherever they invest.
> Everyday
• Driven by our values and code of business
conduct, we deliver results-oriented services daily, COUNTRY BRANCH MANAGER ACCOUNT & PROCUREMENT MANAGER
valuing long-term vision and fair partnerships.

>  UR VALUES
O
Mechanical Estimation Store &
> Safety Commercial Project QA.QC/HSE Maintenance ADM-HR Procurement
Fabrication Manager Logistic
Manager Manager Manager Manager Manager Manager
• V
 IVABLAST is determined to safeguard people’s Manager Manager
ABOUT US health and safety, to operate the business safely
and to protect the environment. We absolutely Deputy

Since 1994, Vivablast has been servicing industry Mechanical ADM-HR Procurement
leaders for the major projects, from construction phase believe that all we have achieved is based on the Commercial Estimation Project Maintenance
safety of the workforce and the surrounding com- Fabrication QA.QC HSE Leader Store Staff
to maintenance programs. Executive Engineer Engineer Engineer Staff Staff
munities. For us, safety is good for business. We Assistant Manager
Our vertical expertise includes all industrial sectors
 are committed to provide customers with the safest
and particularly oil & gas: onshore & offshore, power and highest quality services
generation, shipbuilding and manufacturing industries Fabrication Project QA.QC HSE Maintenance Store Accountant
> Excellence Engineer Supervisor Leader Supervisor Staff Keeper Staff
 UR MISSION
O • T
 hrough systematic and disciplined management,
 ur mission is to secure, protect and maintain
O we commit to deliver services excellence to our
plant assets and equipment in construction, with customers’. VIVABLAST does the job right the first
professional integrated solutions and specialty Fabrication Foreman QA.QC
time, every time. We demonstrate our commitment
Team Inspector Mechanic
services. to quality by meeting or exceeding customer expec-
tations and avoiding non-conformities in our daily
 UR VISION
O activities. We commit to continuous improvement.
Team
 ur vision is to be the most preferred and trustful
O
solution provider for industrial asset preservation. > One Team Spirit Leader
As a leading industrial service provider, we are • W
 e believe that with the power of a united will, we
operating for more than 25 years from Vietnam; have can reach our goals. VIVABLAST shall always put
been already playing an active role into the sustain- team successes ahead of individual successes. Skilled Headquarter
able industrial development of Vietnam and several We trust on each other to deliver on our respective Worker Vietnam Ho Chi Minh City
South East Asia Countries where we operate. obligations and commit to build further our team
capabilities toward greater Safety, Quality and
As a responsive corporate citizen, we promote safety
overall excellence in our field.
and ethics in our working and business environments
. Binh Son Workshop
Quang Ngai Province

Myanmar
Thailand
Cambodia

Malaysia Branch & Main Workshop


Ba Ria - Vung Tau Province

Indonesia
Jacques Vivarés Boris Vivarés
>2 Chairman Chief Executive Officer >3
Factsheet Our Code
QUICK FACTS & HISTORY OF CONDUCT
> F
 ACTSHEET > H
 ISTORY > OUR COMMITMENT
> Founded in 1994 > 1994 : Vivablast Vietnam established > We believe business cannot be done sustainably
> 100% foreign owned Company > 2004 : Certificated ISO 9001 by Bureau Verias without committing rules of engagement..
> Headquartered in Ho Chi Minh City, Vietnam > 2010 : Certificatied OHSAS 18001 by Bureau Verias
> Accredited ISO 9001:2015 and OSHAS 18001:2007 by BV > We do business through transparency, loyalty
> 2014 : Myanmar Branch & Thailand Branch were opened
> Vietnamese & International Management (35) and integrity for the benefit of all stakeholders
> 2016 : Malaysia Branch was opened for RAPID project
> Multiskilled Technicians (370 in 2020) of our projects, striking a balance between
awarded Package 3, Package 6A, Package 30A
> Client portfolio from regional to worldwide industry > OUR GOLDEN RULES
> 2018 : Establishment of 2 Workshops economic growth, corporate social responsibility
leaders
> Industrial expertise: oil & gas, power & utilities, (Coating, Mechanical, Steel Fabrication Services) and sustainable environmental performance. 1. Caring for people and environment:
marine, manufacturing, cement and other industries. - Dong Xuyen IZ, Vung Tau City > Health and safety for our Teams first.
- Dung Quat EZ, Quang Ngai
> We promote a safe work environment.
> We strive to achieve zero harm to environment.
Manpower

465 2. Basic behavior:


> We respect elementary basic Human Rights.

414 419 425 > We comply with laws and regulations.


405
> We prohibit corruption and bribery.
> We strictly control gifts and donations handling.
3. Relation with third parties:

240 > We prevent conflicts of interest.


> We value respect and honesty in our relationships and
partnerships.
> We promote transparent communication.
80 > We ensure our Business Policy is also respected
all along the supply chain.
4. Handling information:
1994 2004 2014 2015 2016 2017 2018 Year
> We promote fair and transparent information.
> We respect confidentiality.
5. Attitude on project site:
> We care for our Clients’ properties as if they
were ours.
> We enforce our Clients’ Codes of Business Conduct.
> We promote Team spirit and positive attitude.
6. Sustainable
> We are all ambassadors of Vivablast’s professionalism
and reputation.
> We handle Company assets in a safe and long term
vision.
> We constantly train our Teams to international
business standards.
> We enforce internal compliance at all levels.

>4 >5
HSE
PRESENTATION
HSE
STATISTICS
> SAFETY FIRST > H
 SE STATISTICS (VIVABLAST VIETNAM)
> V
 ivablast has always believed that People and
Environment are the most important assets. Therefore, YEAR 2016 2017 2018 2019 2020
it is one of our top concern to protect the environment
and safeguard the health and safety of our Staff.
> 
We will be distinctive in our pursuit of our health, Man Hour Worked (MHW)
safety and environmental performance and targets. 1,027,315 759,384 834,607 911,288 1,002,117
It is our aim to demonstrate our respect of the
(N)
Environment and to strive achieving our goals:
> No ACCIDENT No. of Environment Incident 0 0 0 0 0
> No HARM TO PEOPLE
> No DAMAGE TO THE ENVIRONMENT
No. of Unsafe act 4 2 6 8 0

No. of Fatality case


0 0 0 0 0
(G)

No. of First aid case 4 0 1 0 6

No. of Lost Time Treatment case (Except first aid) 0 1 0 0 0

No. of Lost Time Incident (LTI)


3 0 0 0 1
(H)
No. of Cases with job transfer or restriction
0 1 0 0 0
> O UR COMMITMENT TO HSE EXCELLENCE (I)
> To endorse the laws and regulations of the countries
No. of Other recordable case
where we operate and fully respect local customs. 3 2 0 0 0
> To attach upmost importance to safety and taking (J)
adequate precautions.
> To protect the Environment by promoting clean No. of Lost Work Day (LWD)
operations and the rational use of resources 27 0 0 0 1
(saving manners).
(K)
> To optimize the allocation of our HSE resources
and continuously improve our HSE Management. No. of Days with job transfer of restriction
0 1 0 0 0
> To reinforce HSE training to establish and maintain (L)
an excellent HSE culture.
Loss Time Incident Rate (LTIR)
> CERTIFICATES OF ZERO LTI RECORDS 2.92 1.32 0.00 0.00 1.00
(F) = ((H)+(I))*1,000,000 / (N)
> 
SIEMENS for the Nhon Trach II CCPP Project
> 
SIEMENS for the Ca Mau I & Ca Mau II TPP Projects Total Recordable Incident Rate (TRIT)
5.84 3.95 0.00 0.00 1.00
> 
MEKONG ENERGY for the Phu My 2.2 TPP Outage (F) = ((H)+(I)+(J))*1,000,000 / (N)
Projects
> 
SHELL for the Go Dau Plant Project Severity Rate
> 
HOLCIM for the Thi Vai Grinding Terminal Project 26.28 1.32 0.00 0.00 1.00
(F) = ((K)+(L))*1,000,000 / (N)

>6 >7
Quality Applicator
PRESENTATION CERTIFICATES

>  UR ISO 9001: 2015 QUALITY MANAGEMENT SYSTEM


O
> 
Our QMS covers all aspects of our organization, business and
processes.
> Our quality objectives and procedures are established in two levels:
Company and Department class. Periodically, we assess our quality
performance in order to define and enforce all necessary corrective and
preventive actions.
> Our quality procedures are implemented to guarantee total compliance
of our solutions & services with international standards such as:
• ISO • NORSOK
• NACE • British Standards
• SSPC • AS / NZS
> FIRE PROOFING

> O
 N SITE QUALITY CONTROL & INSURANCE IMPLEMENTATION
> Total Quality Control
As ISO operating Company, our extensive Quality Our QA/QC Manager is a certified NACE coating In-
Management Systems defines all procedures and spector who supervises our system and equipment.
rules enforced in all aspects of our organization, Our Technicians, Foremen and Supervisors are
to deliver quality services only. regularly trained with quality inspection courses and
Our whole organization is oriented towards Total are familiar with quality control instrumentations.
Quality Control. Organization, Procedures and Specifications
> 
Our Quality Control Inspectors on site enforce
international quality standards and our Clients’ Our QA / QC Inspectors produce quality documentation
procedures, also their specifications. daily, which is properly checked and recorded by our
Project Managers and HSE Officers.
For each project we undertake, we ensure a proper
implementation of our ISO quality procedures. Project documentation and forms are shared by
our Project Managers, QA / QC Officers as well as
Strict compliance with quality specifications is supervisors.
permanently monitored, which is recorded at site
and reported to our Management. Each stakeholder on any project can hold the works
whenever quality is compromised and apply defined > C
 ERAMIC COATING
Our organization fully complies with all international corrective actions as required.
quality standards.
All materials, equipment and tools we purchase meet
> Quality Control Program our ISO quality specifications.
Our Quality Control Program defining all rules related We manage material storage and handling in compliance
to daily quality control inspection and documentation with the highest safety and environmental standards.
is strictly implemented.

> I NSULATION > FLOORING AND WATERPROOFING

>8 >9
Permanent Mobile
FACILITIES FACILITIES
> FEATURES EPC Contractors can mobilize our mobile blasting & painting factories anywhere in South East Asia
Automatic abrasive
>  > Dedusting integration Oil free air supply with
>  > Moisture separator nearby major projects & infrastructure construction sites.
recovery system (dust-free) system air cooling system system
> BENEFITS
 > HEADQUARTERS > High quality compliance & all QA/QC inspection at one location
> Location: Lot B1, Street 2, Binh > Full traceability and warranty of all blasting & painting works by VIVABLAST
Chieu Industrial Zone, Binh Chieu > Reduction of drastically handing and mechanical damages
Ward, Thu Duc District, Ho Chi
Minh City 700000, Vietnam.
>  SR PROJECT
B
> Main Office: to receive and solve MOBILE FACTORY
mostly inquiries from all branches, >
welcome guests and prepare > C
 ustomer: PREZIOSO TECHNILOR
documents for audit, organize all SAS,TECHNIP CONSORTIUM
strategic discussion of top Vivablast
> 
Location: Dung Quat Economic
Management.
Zone, Binh Thuan Commune, Binh
Son District, Quang Ngai Province,
Vietnam
 > VUNGTAU BRANCH > Main product: Surface preparation,
& MAIN WORKSHOP Blasting, Painting, Insulation

> Location: Street 11, Dong Xuyen


Industrial Zone, Rach Dua Ward, >  UNG ANG 1 TPP MAIN
V
Vung Tau City 790000, Vietnam. COOLING WATER PIPING
> Main products: Painting, Insulation, MOBILE FACTORY
Cleaning, Fabrication, Mechanical > C ustomer: Torishima - Lilama 18
Works Consortium
> Production area m2: 16,930 m2 > Location: Vung Ang Industrial Zone,
Ha Tinh, Vietnam
> Main product: Blasting, Painting,
Thermal Spraying Coating, and
Cleaning Services.
BINH
>  SON BRANCH
& WORKSHOP
> 
Location: Dung Quat Economic >  GHI SON REFINERY
N
Zone, Binh Thuan Commune, Binh MOBILE FACTORY
Son District, Quang Ngai Province,
Vietnam. > Customer: JGCS Consortium
> Main products: Painting, Insulation, > Location: Nghi Son Economic Zone,
Cleaning, Fabrication, Mechanical Tinh Gia, Thanh Hoa, Vietnam
Works > Main product: Surface preparation,
> Production area m2: 25,000 m2 Blasting, Painting

>  MYANMAR BRANCH


& WORKSHOP
MALAYSIA RAPID
> 
> Location: No.82C-82E, U Tun Nyo MOBILE FACTORY
Street & U Phoe Hlaing Rd corner, > Customer: Tecnicas Reunidas,
Ward 116, East Dagon Industrial Zone, PVE, CPP
PO 11451, Yangon, Myanmar > Location: RAPID Project,
Pengerang Area, Johor State,
> Main products: Painting, Insulation, Malaysia
Cleaning, Fabrication, Mechanical
Works > Main product: Surface preparation,
Blasting, Painting
> Production area m2: 5,000 m2

> 10 > 11
Integrated
SOLUTIONS > O
 UR MAINTENANCE PROGRAMS
cure
> O
 UR CONSTRUCTION PROJECTS
> A
 s a professional maintenance services provider, we
implement a systematic and documented methodology
e s

s
for any maintenance programs.

us
Study
>  > Execution

tain
• A
 s subcontractor for major EPC Companies, we design • P
 rocurement and logistics Audit QC / Asset construction
Technical Audit Action
Scope Execution Corrective
professional solutions to execute specialty services for 
Our procurement, maintenance and logistics Definition
Survey Conclusion Plan
Actions
large construction projects. Teams organize on-time deliveries of materials
and equipment to remote to sites, in compliance

prot
• W
 e have reasonable financial capabilities to undertake > We
 mainly proceed to onshore and offshore corrosion,
major projects, requiring large Teams, organizational with international safety and quality standards. Asset in production
insulation and access surveys to evaluate our Clients
capabilities and operational experience. 
We have strong partnerships with the major maintenance needs, determine corrective actions as

ec
international suppliers of protective and marine well as procedures to be implemented:

n
int
coatings (Jotun, PPG, International, Hempel,..),

ai
insulation materials, BS 1139+Ringlock Scaffolding • Our Certified NACE International Coating Inspectors
materials, heavy-duty equipments, etc. deliver corrosion surveys.
ma
• Our Insulation Specialists perform insulation surveys in
Our position in Vietnam and long-term cooperation
compliance with ASTM, EEMUA and BS standards.
with trustful and competitive regional suppliers enable
us to supply large quantities of quality materials, • O ur CITB Certified Inspectors execute access Industrial Asset Life Cycle
tools, consumables, as well as logistics services. surveys (BS scaffolding).
• Our IRATA trained Specialists execute rope access
• S
 peciality services
surveys.
> O
 UR TURNKEY PROJECTS
In our factories: surface preparation and coatings > W
 e define and execute tailor-made onshore and > 
Our project management and technical know-how,
applications, fabrication, mechanical and cleaning offshore maintenance programs, based on our added to a sound knowledge of regional business
works (UHP, Dry ice,...). assessments on-site. We can dispatch our multi- specificities allow us to stand as a trustworthy business
skilled Technicians to perform several complementary partner for turnkey projects, particularly for small to
• O
 n remote sites:
services during outages, shutdowns, overhauls and medium size projects (manufactures, warehouses,
-S  urface preparation and all types of coatings commercial buildings, etc.).
hook-ups:
application (mobile factory, blasting and painting
workshops) • Equipment repair by Fabrication works and Painting > Capabilities
- Mechanical works applied to steel structure, application, QA/QC testing for completion. • P roject Management: our operating ISO based
equipment (Boiler, Stack, Diverter...) • M
 echanical works like welding, cutting, replacement
Project Management System, our methodology is
- Thermal, acoustic and PU foam insulation for damage repair of steel structure and equipment. simple but highly efficient: on time, on budget, safely
and sustainably.
- B S and Multidirectional scaffolding: design, • H
 P/UHP services for a safe surface preparation
erection, inspection and dismantling. • Our approach to any project is Client-focused and
works onshore and offshore / wet slurry blasting
- Rope Access: Executed by IRATA level I,II, III results-oriented.
• Dry blasting and all other types of surface preparation
Technicians with support of certified equipment • Engineering: our Vietnamese and French Engineers
• Repair and renewal of all types of protective and
- Other professional services: floor coatings, can provide both local and international engineering
marine coatings
thermally sprayed coatings, waterproofing, passive services, meeting international and local statutory
• R emoval of damaged insulation systems and
fire protection, rope and powered accesses requirements.
reinstallation
As a professional Contractor, we all comply with • BS scaffolding, rope access and other types of • Procurement: with procurement operations, equipment
offshore and onshore site regulations in coordina- accesses to perform works at any location and material sources in SE Asia, we do have a
tion with our Customers (safety, environment, pro- truly regional procurement presence and experience
• Other maintenance services such as thermally
duction). We provide trained, certified and experi- obtaining the best possible value for our Clients.
sprayed coatings, floor coatings, waterproofing,
enced Technicians as well as proper equipment and passive fire protection • Our expertise includes:
materials. - Vendors qualification & selection
> A
 s professional Contractor, we comply with offshore
• C
 ommissioning activities and onshore site regulations in coordination with - Transportation & logistics
our Customers (safety, environment, production), - Local customs duty requirements...

We support our Customers during commissioning
providing trained, certified and experienced Technicians • Construction: we provide both direct equipment
with reactive, flexible and experienced multiskilled
as well as proper equipments and materials. erection and construction management services
Teams to perform our professional services, such as:
as best suit the project location and Clients requirements.
- Repairs of all types of coatings (touch-up) Enforcing international HSE standards in our
-R
 emoval and re-installation of all types of insulation factories and on sites, we have an impressive safety
systems track-record.
- Provision of access services. • Commissioning: our know-how allows us to ensure
project completion including pre-commissioning and
commissioning.

> 12 > 13
Protection
> F
 IRE PROTECTION
> We provide the best passive fire protection systems, from initial consultation
to application and project management.
> We mainly provide four types of passive fire protection systems:
•B
 oarding / sealing systems:
For penetration seals, cables and other utilities: mineral wool panels,
SERVICES ablative dry mortars mixes, sealbags systems.
•A
 blative spray:
Especially developed for the fire protection of grouped or bundled electrical
> H
 P/UHP WATER JETTING cables and for penetration seals.
> We provide high pressure (10,000 PSI) and ultra high pressure •C
 ementitious sprays or trowelled:
(36,500 PSI) water jetting (hydroblasting) systems and solutions to a Designed for direct protection of structural steelwork. From low and medium
wide range of industries. density through to high performance fireproofing for critical areas, Vivablast
is able to recommend, supply and install the most suitable product.
> We are experts in applying the correct specialized tooling, the exact
pressure and volume to get the job done quickly and safely. • I ntumescent coatings:
> Our equipment is operational in places where spark free is essential We master all types of both water-borne or/and solvent-based intumescent
such as oil, gas and petrochemical plants, refineries, CCPP power coatings application to protect commercial and public buildings, oil and gas
industry, chemical plants, on gas tanks, fuel / diesel tanks and other infrastructures and plants.
places where traditional sand blasting units cannot work due to the
risk of explosion.
> DRY ICE AND DEEP CLEANING SOLUTIONS
> Our systems allow from 300bar to 2,500bar of pressure (4,300 to
36,250PSI), for cleaning, paint removing, surface preparation. > Experiences from numerous blast cleaning projects at Phu My 2.2
TPP and other power plants including turbines blades and also
> S
 URFACE PREPARATION diaphragms aluminum oxyde blast cleaning
> Surface preparation of all types of metals as per ISO 8501-1-1988, > Vivablast most skilled Supervision, Blasters and Scaffolders will be
NACE, SSPC, AS/NZS 1627 standards and cleaning methods: assigned to the Project
• Solvent cleaning • Wet abrasive blast cleaning > Vivablast can design & implement a step by step plan following a
• Hand tool cleaning • Commercial blast cleaning standard cleaning pattern to be sure debris is removed.
• Power tool cleaning • Brush-off blast cleaning > Vivablast will be able to max out the productivity thanks to the right
• White metal blast cleaning • Pickling selection of the nozzles that direct the dry ice on the surface being
• Flame cleaning • Near-white blast cleaning cleaned
• Industrial blast cleaning • Chemical stripping > We are proud to provide dry ice production with best quality to market.
• Commercial grade power • HP/UHP cleaning With 1400kg/cube density, our Dry Ice production is highest, result in
tool cleaning higher performance of cleaning and avoid evaporation lost.
> Concrete substrates surface preparation
• Scarifying • Non-metallic, grit and shot
• Dust free captive blasting blasting
> INDUSTRIAL FLOORING SYSTEM
• Diamond disk grinding > We are specialists of all types of floor coatings application and maintenance.
> We deliver high performance floor coatings and screeds, including remedial
> ALL TYPES OF COATING APPLICATION works on worn cracked floors or laying new systems.
> We have delivered advanced protective coatings services for our > We provide long lasting and cost-effective flooring solutions for all types of
Customers’ assets such as anticorrosion protection, appearance, environments.
sanitation, cleanliness, visibility and safety. > We master surface preparation techniques with the most technically advanced
> Depending on exposure (atmospheric, immersion, underground), equipments: dust-free shot blasting, grinding, UHP.
we select, supply and apply as per international standards the > We can apply any kind of industrial flooring systems, such as :
most suitable and efficient coatings for all kinds of protection from • Heavy Industrial traffic floorings • Antistatic coatings
corrosion, seawater, extreme temperatures, chemical products,
• Resin coatings • Color, slurry coatings
abrasion, weather, etc.
• Resin screeds • Chemical resistant floors
> We master professional application techniques of all types of
• Self Leveling coatings • High build-Industrial and
protective coatings for steel, stainless steel, aluminum, zinc,
copper, concrete, etc. commercial systems

> T
 HERMAL SPRAY COATINGS > W
 ATERPROOFING
> We deliver high quality thermally sprayed coatings services such as > Vivablast is a trusted name for effective waterproof services to
both Thermal Sprayed Aluminium (TSA), Thermal Sprayed Zinc (TSZ) meet the requirements of diverse industries.
and other thermal sprayed metals as per NORSOK M-501.
> We have delivered a wide range of waterproofing techniques.
> Our services provide significant anticorrosion protection improvements Our systems have been used widely and given satisfaction to
over conventional coating systems, which is particularly effective to pro- our Customers, in various construction sites & also demanding
tect our Customers’ assets in marine and other industries from high or low environments.
temperatures to corrosive environments.
> We deliver various waterproofing systems from bituminous
> Thermal sprayed coatings are a highly costs-effective & straightforward membrane, liquid applied coatings reinforced waterproofing
solution for adding superior properties and performance qualities to any with fiber glass, to waterproofing combined with thermal and
given engineered surface. The variety of substrates that could be all acoustic insulation.
enhanced by thermal spray are virtually limitless.

> 14 > 15
Insulation
> F LEXIBLE TURBINE INSULATION SYSTEMS
> We deliver flexible & single layer insulation to maximize turbines energy
efficiency & safety by fixing, as well as tp reduce maintenance costs and
outages duration. Our OEM-approved insulation is designed to prevent hot
spots and heat leakages to increase power generation of turbines made by
Siemens, MHI and Alstom.

SERVICES > Thanks to its high quality insulation materials and smart fixation systems,
the insulation pillows need less maintenance on the long term and can be
removed, repaired and reinstalled quickly to shorten outages duration.
> Our insulation enables optimal health and safety conditions with cooler
ambient temperature inside turbines enclosures and on turbines surface
and contributes to protect electrical equipments, sensors and thermal
controls.

> C
 ONVENTIONAL INSULATION
> We can supply and install all types of insulation
(rockwool, glasswool, calcium silicate,
closed cell elastomeric insulation, polyurethane
foam), metal coverings and ancillaries
depending on temperature requirements. > PU FOAMING INSULATION
> Our Insulation Engineers are able to proceed to > Polyurethane Foaming insulation
the insulation material take-off and ensure with provides a highly effective, seamless
our Insulation Supervisors and Foremen that and long-term insulation, made of a
our works are carried out in compliance with job self-adhering two component system
specifications, with a strong focus on quality and which is implemented mostly for cold
efficiency. insulation application.
> Our Tinsmiths and Insulators are able to > Our PU foaming services are safely
fabricate, install, repair, remove and re-install executed by our professional
all types of insulation systems. applicators with modern twin
> We can build and operate high-productivity component spraying equipments.
fabrication workshops with state-of-the art equip- > We can intervene both in-situ or in
ment and tools to perform any kind of insulation workshops as we master all possible
scope, ensuring that quality is in line with our application methods including spraying,
Customers‘ expectations. injection and pouring techniques.

> F LEXIBLE INSULATION


PILLOWS > S PRAY ON INSULATION
> We provide CAD designed flexible
> We deliver spray on insulation for fire protection,
insulation pillows made from fiberglass
thermal insulation & soundproofing application.
tissues and insulation materials for
valves, flanges, piping & all types of > T
 hermal, acoustic and moisture insulation with
industrial equipments requiring regular glasswool spray-on application, with temperature
access & maintenance. resistance up to up to 600oC.
> Our flexible insulation pillows are easily Fire protection with rockwool spray-on application,
> 
assembled and disassembled to provide with temperature resistance up to 1125oC.
superior functionality for the customer. > S
 pray on insulation technology can be considered
Depending on Customers requirements, as more environment-friendly (low wastage)
we select the right quality insulation & cost-effective than conventional insulation
materials to manufacture the insulation techniques requiring fasteners and cutting.
pillows with state-of-the-art computer
controlled production facilities. Our > S
 pray on insulation materials and binders are
expert Technicians make sure that all mixed in the air during application and congeals
insulation components fit together into a seamless gel-like structure when hits the
accurately even when it comes surface to be insulated and/or fire protected.
to complex profiles.

> 16 > 17
Fabrication
Vivablast has also performed fabrication works at workshop
for non-pressure parts of Heat Recovery Steam Genera-
tors and complete the package with coating application and
packing for delivery:
> Casing

SERVICES > Ducting


> Stack
> Heat Exchanging System

> FABRICATION CAPABILITIES


> Our fabrication partners proudly hold the industry’s
most coveted quality certifications, including:
ISO 9001:2015
AISC (Complex building fabrication)
CWB (shops and welders)
AWS (shops and welders)
And we also have capabilities in:
ASME Section I (Stamp)
ASME Section VIII, div1 (U Stamp)
ASME Section VIII, div2 (U2 Stamp)
> Establish New System and Spare Part Supply

Vivablast has delivered fabrication works to numerous


power industries around the world, technical cooperation
with seasoned Gas Exhaust Engineering companies,
Vivablast is capable of fabricating Gas Exhaust System
such as.
> Diverter Powertrain
> Silencers
> Internal Insulation
> Diffuser
And other items

> STEEL FABRICATION - EQUIPMENT


MANUFACTURING & REPAIR
Vivablast in co-operation with our fabrication partners
working hard to deliver outstanding products of:
> Piping
> Pipe rack
> Steel structure
> Cooling Tower
> Tanks

> 18 > 19
> IN-SITU MACHINING AND CONTROLLED BOLTING SERVICES

Mechanical
> COLD PIPE CUTTING & BEVELLING > FLANGE FACING > CONTROLLED BOLTING
Supply machines to part off heavy Provide flange facing solutions from Provide technicians and equipment
wall wipe, perform any kind of bevels 2'' diameter up to 126'' diameter on to ensure properly leak-free bolting
for various weld preparations due to any material to meet the surface connections on any bolted joints
its precision and higher safety. finish as required. safely and competently.

SERVICES
> E
 QUIPMENT MECHANICAL MAINTENANCE
> EXPANSION JOINT REPLACEMENT > FILTER HOUSE REPAIR > PLANT REFURBISHMENT
Including new expansion joint supply Including Louver and Roof fabrication, Including Scaffolding, Steel structure
and reinstallation to protect pipeline in Steel structure replacement, Scaffod- replacement & Anti-Corrosion painting
thermal expansion process ing and Painting application application

> BOILER AND TURBINE CLEANING SERVICES


> CHEMICAL CLEANING > ALU OX ABRASIVE CLEANING > COAL FIRED BOILER CLEANING
Apply chemicals for cleaning and Use particle to blasting and clean- Remove coal slag and refractory by
supply QA/QC supervisors to check ing the surface, applied for gas and using rope access as main access
and record result steam turbine method

> DIFFUSER REPAIR > BOILER FIN TUBE REPAIR > TECHNICAL ADVICE & UPGRADE
Including A support Change, new bolt Including Cuting, Welding, Process Including Boiler Cyclones modification,
& nut installation, Internal & External hydraulic test to recognize leakage/ and Hanger inspection and replacement
Repainting, and Insulation. abnormal deformation for cold and hot position

> THERMAL SPRAYING SERVICE


> INNOVATIVE REPAIR METHODS
Apply thermal spray with high quality and long term
guarantee, use of different materials applied to specific
equipment/ metal parts such as Aluminum, Zinc, Alloy
(HVOF) for prevention of metal loss and protection of
structure in long-term operation:

> AUXILIARY BOILER REPAIR > CATHODE PROTECTION > WEAR-PAD APPLICATION • Boiler tube

Including tank, pipeline, valve & steel Including Welding, Drilling, Fitting and Including Surface preparation, Wear-pad • Boiler wall
structure replacement, hot works and Installing on Cooling Water Pipeline to application at pipe support and coating • ID fan blade
insulation installation, re-coating. protect metal surfaces from corrosion. for anti-corrosion protection.
• Duct and Damper

> C
 OMMISSIONING & PRE-COMMISSIONING
- Start up sea water system, closed cooling water, chemical
system
- Lube oil, hydraulic oil…
- Run test for pump, air compressor, fan
- Correct flow rate, pressure, temperature value for operation
- Short circuit test, earth test, synchronizing, energization
load test, load reject test

> 20 > 21
Access > P
 OWERED ACCESS EQUIMENTS
>  We can also provide other types of accesses:
- Manitou Access 180ATJ
- Scissor Lifts & Mechanically Elevated

SERVICES Working Platforms


- Permanent Access
- Support Work
- Basket / Cradle Work
- Rigging & Crane Services.
> B
 S SCAFFOLDING
> We deliver BS 1139 and 5973 scaffolding services for
construction and maintenance projects in all industrial
sectors, both onshore and offshore.
> We meet our Customers’ deadlines and access needs
with flexibility and safety.
> Our multi-skilled Inspectors, Supervisors and advanced
Scaffolders are able to perform any scaffolding works.
• Free standing scaffolds • Independent tied scaffolds
• Hanging scaffolds • Shelters
• Cantilever scaffolds • Stair cases
• Mobile scaffolds • Temporary workshops
• Confined space scaffolds • Weather protection

> M
 ULTIDIRECTIONAL SCAFFOLDING
> We upgrade and apply this new technology, especially in
the Shutdown periods of Power Generation Industry for
its advantages: faster to erect, safer to execute and fewer > D
 RONE INSPECTION (UAVS ACCESS)
manpower needed to construct.
> Our scaffolders are trained and qualified under Interna- Survey
> 
tional Standards by professional trainer. - Data collection & analysis
> First application of this method is at short yearly outage > Emergency
of Power Plant in the fourth quarter of 2018.
- Hazard detections (gas/leak)
> Our skilled scaffolders execute this new scaffolding
method for: > Mapping
• Turbine Cleaning - 3D mapping / hot spot
• Insulation Installation
• External wall coating - Corrosion detection and evaluation
> Inspection
> R
 OPE ACCESS - Routine inspection
> We perform rope access as a safe, time-saving and cost- - Corrosion monitor / Thermal scan
effective solution to access difficult areas.
Our rope access Technicians are certified IRATA level 1, and
are regularly trained by an IRATA level 3 Supervisor.
We comply with ISO 9001 and Vietnamese standards for
work at height condition (TCVN 8207-1:2009)
We only use the latest technology for PPE by Petzl ® and
regularly inspect all our equipments as per manufacturer’s
recommendations.
> Our certified rope access Technicians can deliver safely:
• All types of surface preparation and all types of protective
coating application services
• HP/UHP water jetting services for cleaning
• Thermal spray coating application services
• All types of insulation services
• Mechanical services
• NDT services (visual inspections, ultrasonic testing, MPI,
etc.)

> 22 > 23
ENGINEERED COATING
5. Floating Hose Repairs
Ability to protect and return the hoses into serviceable conditions in a prompt and timely manner and refurbish

AND MATERIAL
damaged sealing flange faces quickly and without the need for welding and on-site machining techniques. Main
advantages are faster, safer, easier and requires no specialised tools.

SERVICES

>  SOLUTIONS AND APPLICATION


> With Belzona products enabling alternative repair / maintenance solutions
that eliminate the need for hot-work, we, Vivablast Vietnam Co., Ltd are readily
prepared to propose and engineer the appropriate solutions to be offered to your
company for the following:

1. Valves, Pipes & Fitting:

A wide range of cold-curing and epoxy 6. Mechanical Power Transmission


coatings specifically designed to offer
outstanding erosion and corrosion A comprehensive range of solvent-free
protection as well as demonstrating epoxy designed to repair and prevent
excellent chemical resistance the common failures associated with
mechanical power transmission, and a
reliable alternative to welding and also
machining techniques strictly required
for conventional repairs.

2. Gasket, Seal and Shim


Usage for immediate formation of
7. Wrapping System:
irregular shaped and high strength
load bearing shims used in equipment A new generation repair solution for
location or construction projects restoring the strength of corroded,
weakened and holed pipe and tank
Heat Exchangers
walls.
Cold curing epoxy products allow for
This system was engineered for
rapid, in-situ application minimising down-
pipe wrap and patch repairs, as an
time whilst providing long-term erosion
alternative to replacing defective
and corrosion protection.
metallic substrates, and providing
superior strength, corrosion and
3. Pumps: chemical resistance.
Heavily damaged pumps can be
restored to their original profile
by using Belzona cold-curing. VIVABLAST is certified distributor for products of:
Our epoxy reduces further
deterioration, increasing pump
efficiency and reducing frequent
maintenance costs.

4. Tanks and Secondary Containment


Specifically created for the maintenance
of storage tanks, high strength quickly
restore secondary containment areas
and damaged concrete whilst providing
excellent chemical and impact resist-
ance, as well as compressive strength.

> 24 > 25
Power Generation
CONSTRUCTION MAINTENANCE GE HAI PHONG
> P roject: Blasting Room Upgrade
PROJECTS PROJECTS >D  uration: 2019
MEKONG ENERGY - GE (FIELDCORE)
> Works description:
PROJECT: N
 HON TRACH 2 CCPP PRO-
JECT PHU MY 2.2 THERMAL POWER PLANT • Supply of Material, Equipment and Man-
> P roject: M
 ajor Outages & power to upgrade blasting room
TORISHIMA & LILAMA 18 JSC
routine maintenance

INDUSTRY PROJECTS
CONSORTIUM
>D uration: 2010 - 2011
> Works description:
>D  uration: 2005 - 2025
> Works description: RENEWABLE
• Main Cooling Water Piping
internal & external lining
• Daily maintenance: painting,
insulation, BS scaffolding, MAINTENANCE
cleaning PROJECTS
• Tank Internal linings
SIEMENS AG - DOOSAN - • More than 100 tons of
BS scaffolding material mobilized CS WIND THAILAND, PHILIPPINES, VIETNAM
SEONGHWA - LILAMA 45.1 -
CHIEN THANG ENGINEERING every year for shutdowns > P roject: Wind Tower Maintenance
• Turbines & diaphragms >D  uration: 2016 - 2021
> Works description: > Works description:
• Main BS Scaffolding support blast-cleaning, FRP Casing Repair
Subcontractor • Water tanks internal lining & Leak repair • Access method: Rope Access (IRATA
• Rope access • Gas station cold insulation level I, II, III)
• Floor coating & hardener • Surface Preparation
SAMPYUNG • Expansion Joint Replacement
POWER POWER RENEWABLE >D uration: 2010 - 2012 • Anti-corrosion Application
• Air inlet house and HRSG spot repair
> Works description: • Site survey for Anti-corrosion

GENERATION GENERATION POWER • 2 units HSRG: PETROVIETNAM CAMAU - CAMAU 1 & 2

CONSTRUCTION MAINTENANCE MAINTENANCE


BS scaffolding, blasting/painting, THERMAL POWER PLANT EVN - PHU QUY WIND FARM
piping & equipments insulation > P roject: Major Outages, Mechanical > P roject: Wind Tower Maintenance
Maintenance >D  uration: 2018, 2020
TORISHIMA & LILAMA 18 JSC > Works description:
CONSORTIUM >D  uration: 2016 - 2021
> Works description: • Access method: Rope Access (IRATA
> P roject: Vung Ang 1 TPP level I, II, III)
• Gas Turbines & Steam Turbines OEM
>D  uration: 2010 - 2012 • Surface Preparation
insulation pillows maintenance
> Works description: • Diffuser and Fin Tube Repair: Cut, • Anti-corrosion Application
• Design, mobilization and Weld, Material replacement, Insulation
erection of blasting & painting factory at application VESTAS VIETNAM, TAIWAN
Site • Filter House and Stack Repair: Steel > P roject: Technician Supply
• Main Cooling Water Piping structure replacement, Blasting, Painting >D  uration: 2018, 2019, 2020
internal & external lining application. > Works description:
• Supply, installation supervision, • BS scaffolding, Rope Access, Crane • Supply Skilled Technician to repair
and commissioning of cathodic access support wind tower and wind blade
protection system • Cathode protection for MCW Pipeline, • Blade Access Platform Rental
Wear Pad Installation at Gas Pipe Sup-
PROJECT: C
 AMAU 1 & 2 TPP port. NOVASIA
> Duration: 2008 • Auxiliary Boiler Repair > P roject: Met Mast and Solar Projects
POSLILAMA • D.O Filter Upgrade >D  uration: 2018, 2019, 2020
> Works description: > Works description:
• S teel structures blasting GENCO 3 • Supply Skilled Technician to repair
and coating projects > P roject: Shutdown Maintenance wind tower
VINCI GP >D  uration: 2018, 2019 • Met Mast Supply and Installation
> Works description: > Works description: • Supply Skilled Technician to install
• Various painting works: • Perform coating application work for filter rooftop solar panels.
house (GT22)
HAZAMA - BTC – LILAMA • VT2 PP Thermal Spray Coating ID Fan K2
> P roject: Nhon Trach 1 TPP Impeller > P roject: Technician Supply
& Phu My 2.1 TPP >D  uration: 2019
>D  uration: 2004 / 2008 AES MONG DUONG > Works description:
> Works description: > P roject: Insulation, Boiler Cleaning and • Met Mast installation (BT)
• Main Cooing Water Piping Material Supply
internal & external lining NORTHWIND - NORTH LUZON
>D  uration: 2018, 2019
> Works description: > P roject: Wind Maintenance
PROJECT: P
 HU MY 3 PP >D uration: 2019
> Duration: 2005 • Survey for steam turbine insulation repair > Works description:
• Turbine flexible pillow insulation, new • Wind turbine Blade voids & Leading
SIEMENS VIETNAM LTD fabrication, fact finding & repair
> Works description: Edge Repair Service by Rope Access
• B
 lasting & coating of electrical • Boiler Cleaning: Using rope access to Method and Blade Access Platform
equipments & structures remove slag and refractory • Wind Tower Maintenance
LEIGHTON DOOSAN HEAVY INDUSTRIES SPUC
> Works description: > P roject: Nghi Son Refinery, Song Hau, > P roject: Rooftop Solar Panel Installation
• R ack cable fireproofing project (2004-
Vinh Tan 4 Power Plant and >D  uration: 2019
2005) > Works description:
Construction Projects
• Ablative coating KBS
>D uration: 2018 - 2021 • BEL Parking Installation
TOA CORP. > Works description:
> Project: Nghi Son 2 Power Plant • Re-hot deep galvanizing & package ATB
> Duration: 2020 handrail, plate & ladder > P roject: Hydro Power Pipeline Coating
> Works description: • Coating for Xylence column >D  uration: 2019 - 2020
• Jetty Pile Wrapping Protection • Blasting and Painting for Boiler Steel > Works description:
Structure & Fireproofing work at Vinh • Internal Ringlock Scaffolding Erection
Tan 4 • Internal Coating Application
• Blasting & Painting at Dung Quat WS

> 26 > 27
Power Generation
>  IEMENS AG - CTCI
S
– POSLILAMA - G + H
SCHALLSCHTZ
– VINCI GP
> Project: Camau 1 & 2 TPP Project,

CONSTRUCTION PROJECTS MECO 2.2


> Duration: 2006 – 2018
> Works description:
• Power Island / steel structures:
blasting & painting works
• HRSG (2 units): Scaffolding,
> COOLING WATER PIPING LINING cleaning works
> Execute quality shop blasting, • Pipes and flexible pilow insulation
internal & external lining of • GT/ST : Dry Ice cleaning
above & underground piping
including site welding joints
coating after piping installation.
>  ORISHIMA & LILAMA 18 JSC
T
CONSORTIUM - SIEMENS
AG - LILAMA 45.1 - CHIEN
THANG ENGINEERING
- DOOSAN - SEONGHWA -
> TANK LINING SAMPYUNG
> Internal & external lining of filter > Project: Nhon Trach 2 CCPP Project
water storage tanks, demineralized
water tanks, potable water & other > Duration: 2010 - 2017
tanks including provision of BS > Works description:
standard scaffolding for safe access
• Main Contractor for scaffolding works
• Cleaning, Blasting & painting works
• HRSG (2 units): insulation & painting
> EQUIPMENT AND PIPING • BOP: Cooling water piping & tanks
BLAST & PAINT AND INSULATION blasting & lining works
> Shop and field professional
surface preparation and coating
application works for anti-corrosion
protection of structural steel assets
and equipment. >  ORISHIMA & LILAMA 18 JSC
T
> Thermal insulation of piping, CONSORTIUM
stacks, casings, ducts and
> Project: Vung Ang 1 TPP Project
drums with quality mineral wool
& calcium silicate materials and > Duration: 2010 – 2012
protection by metal jacketing
> Works description:
• Mobile blasting & painting
Factory at Site
> JETTY PILE WRAPPING • Cooling water piping blasting
PROTECTION & lining works
• Cooling water piping impressed
> Use specialized materials current cathodic protection
(Wrapping) to cover jetty piles
(both above and under water
level) in order to protect the pile
from corrosion and erosion.
> TOA CORP.
> Project: Nghi Son 2 Power Plant
> Duration: 2020
> Works description:
> GAS EXHAUST FABRICATION • Supply equipment, material and
skilled manpower to perform Jetty Pile
> Perform fabrication works Wrapping Protection
for Diffuser, Diverter, Stack,
Silencer,... in Power Plants at
Construction Phase.

> 28 > 29
Power Generation
> PV POWER - CA MAU 1, 2
THERMAL POWER PLANT
> Project: Shutdown Maintenance
> Duration: 2016 - 2021
> Works description:
MAINTENANCE PROJECTS • Stack + Staircase & Filterhouse repair
• Diffuser and Boiler Fin Tube Repair
• Auxiliary Boiler Repair, Wear Pad
application for gas pipe support and
Cathode protection.

> MECHANICAL REPAIR


 >  AS AND STEAM TURBINES OEM
G
WORKS AT POWER PLANT INSULATION
> Cuting, Welding and Replacing > Supply & maintain OEM-approved
Fin Tube, Louver, Diffuser, Stack single-layer insulation pillows for gas
to repair damages after long-term & steam turbines during operations &
usage scheduled maintenance.

> MEKONG ENERGY - GE (FC)


PHU MY 2.2 THERMAL POWER
PLANT
> Project: Shutdown & Daily Maintenance
> Duration: 2005 - 2025
>  ANKS & COOLING WATER
T >  URBINES BLADES, DIAPHRAGMS
T > Works description:
PIPING INTERNAL LINING BLAST-CLEANING AND BOILER
• Access method: BS & Ringlock Scaffold,
> Perform new lining of tanks CLEANING Crane, Rope Access,...
internal shells, bottoms and roofs; > Aluminum oxyde blast, Deep, Chemi- • Cleaning, Blasting & Painting works
and over critical internal sections cal cleaning of steam/ gas turbines &
of cooling water pipings as per diaphragms, including mobilization of • Steel structure replacement
international quality standards for temporary blasting chambers at site. As • Turbines & diaphragms blast-cleaning
a durable & safe result. well as, Boiler cleaning with support of • Water tanks internal lining & Leak repair
rope access • Expansion Joint Replacement
• GT & ST Insulation repair
• Inspection & Mechanical maintenance
>  AINTING, INSULATION,
P
SCAFFOLDING &
CLEANING
MAINTENANCE >  ES MONG DUONG THERMAL
A
POWER PLANT
> Provide power plants operators
with a permanent team of > Project: Yearly Maintenance Shutdown
Technicians to maintain all > Duration: 2016 - 2018
facilities with professional painting,
insulation & scaffolding solutions > Works description:
• Boiler cleaning: using rope access
equipment and IRATA Technicians to
execute cleaning for slag and refrac-
tory removal.
• Insulation installation for turbines in
power plant in shutdown period.

> 30 > 31
Renewable Power
> VIETNAM WIND FARM
> Project: Wind Tower maintenance
> Duration: 2018, 2019, 2020
> Work description:

PROJECTS • Access method: Rope Access (IRATA


level I, II, III)
• Surface Preparation
• Anti-corrosion Application
• Site Survey and Blade Access
Platform Rental

SOLAR POWER > PHILIPPINES WIND FARM


> Project: Wind Maintenance
> Duration: 2019
> Work description:
• Wind turbine Blade voids & Leading
Edge Repair Service by Rope Access
> SOLAR INSTALLATION, > SOLAR INSTALLATION
Method and Blade Access Platform
COMMISSIONING AND CLEANING
MAINTENANCE • Wind Tower Maintenance
> Optimize the performance
• Site survey by Specialized Drone
> Perform Solar installation through of existing solar installation
two models: NO CAPEX installation through regular maintenance
and Direct supply following Euro-
pean standards for design, construc-
tion and sourcing

> BLADE, TOWER, & THIRD PARTY >  IND TOWER ANTI-CORROSION
W > MET MAST SUPPLY AND
INSPECTION PROTECTION , BLADE REPAIR & INSTALLATION
Perform Visual and ultrasound inspec-
>  RECOATING, TOWER CLEANING & > Project: Met Mast Installation
tion method done by IRATA level I,II,III BASEMENT SEALING (In Vietnam)
WIND POWER and Wind Turbine Inspection Trained
Technicians, as well as Third Party In-
> Execute MBX surface preparation for
blade, tower and basement, then blade
> Duration: 2019 - 2020
> Work description:
spection to ensure conformity to OEM recoating, basement sealing and anti-
Standards. corrosion painting application for tower. • Supply Met Mast
• Site Survey and Installation of Met
Mast

VIVABLAST has Membership of and Technicians certified by:

> WIND TURBINE DRONE > GWO TRAINING CENTER


INSPECTION > Establish the 1st GWO Training
Using the latest hi-tech drone
>  Center in ASEAN to provide GWO
to provide a full and detailed Safety training and also the new
inspection of wind turbines in GWO Technical training modules
Asia. for the Wind Turbine Industry
> 32 > 33
PLATFORMS OFFSHORE CUU LONG JOC
> Project: Internal Coating for Pipeline
MAINTENANCE

Oil & Gas – Upstream


> Works description:
• Provision internal dry blasting and
PROJECTS painting for pipeline with robotics
KNOC ROSNEFT
>P  roject: Rong Doi Platforms > Project: Insulation material and Belzona product
>D  uration: 2008 - 2019 > Works description:
> Works description:

MAINTENANCE PROJECTS
• Provision of Pyrogel XTE insulation
• Equipments & piping thermal insulation maintenance and Belzona products
• Offshore Flare Boom Coating Work & Scaffolding provision
PHATECO
VIETSOVPETRO
> Project: Platform Maintenance Projects
> Project: BK Thien Ung, BK20 and BK21 Project > Works description:
Equipment Upgrade • Supply of insulation for offshore service
>D  uration: 2008 - 2020 • UHP Water jetting equipment and manpower supply
> Works description: • Internal Coating Pipeline & Amarda FPSO Belzona Repair
• Fireproofing BK topside
• End plate repair for vacuum pump PC MYANMAR
> Project: Yetagun PVE - Offshore
PVD OFFSHORE >D  uration: 2018
> Project: Machine, Insulation and Engineered coating > Works description:
> Works description: • Provision of PFP Repair Work
• UHP Water jetting machine supply
• STT offshore insulation installation DK ENGINEERING
> Project: Equipment and Structure Repair
PREMIER OIL >D  uration: 2018 - 2020
> Project: Repair Works and Coating Application > Works description:
> Works description: • 04 Filters - Internal coating
• Fibre optic JP support repair • Pig Receiver ASFCA-EP-3801 External Coating
• Offshore wrapping and leak repair works • Open Drain Tank and Filter Coating
• External coating and Belzona Application • Liquid Seal Pot Repair
• Fire water tank coating
BIEN DONG POC • Pig launcher external painting
> Project: Training and Material Supply
> Works description:
• Belzona application training
• Spare part supply for MP oil mist blowers & consumable

> OUR VIETNAMESE


 > OUR MULTI-SKILLED
& EXPAT TECHNICIANS TECHNICIANS
ARE QUALIFIED FOR PERFORM SAFELY WITH
OFFSHORE WORKS FULL PPE EQUIPMENT
> UHP operations & safety > UHP water-jetting cleaning
procedures certificates > Captive, dry and slurry blasting
> T-BOSIET & UKOAA certificates > All types of painting services
> Medical certificates > BS 1139/5973 scaffolding services
> IRATA rope access
> Thermal & acoustic Insulationn

> EQUIPMENT FOR


 >  QUIPMENT FOR
E
SURFACE PREPARATION COATING APPLICATION
> Pneumatic deck scalers > Peristaltic hose pumps
> Captive wheel blast equipment > Airless spray pumps (45/1 &
with recycling-vacuum unit & 68/1) and underwater
magnetic broom accessories > Painting lines
> Ultra High Pressure Water > Silver guns & switch guard paint
Jetting Pump (36K PSI) tips (up to 394 bars)
> Slurry & dry blasting equipment > Paint nozzles for all
> Mechanical cleaning equipment: requirements
bristles, educt-o-matic, straight > Paint mixers (pneumatic) &
sanders, needle hammers JEX paint masks cartridges
> Diesel air compressors > Profile & wet gages, elcometer
DFT, surface temperature, dew
point, spark test, QA/QC forms
> EQUIPMENT FOR for coating application quality
ACCESS OPERATIONS control
> All consumables for coating
> BS 1139 scaffolding tubes, application
boards, couplers, base plates,
ladders, etc. Packed in offshore-
certified baskets
> IRATA compliant rope access
equipment kits
> 34 > 35
Oil &Gas–Upstream
> KNOC
> Project: Rong Doi Platforms
> Duration: 2008-2019
> Works description:
• Equipments & piping thermal
MAINTENANCE PROJECTS insulation maintenance (2008-
2012)
• Scaffolding works (2017-2019)
• NDT and anti corrosion for plare
with rope access method ex-
ecuted by Ievel II, III IRATA rope
access technicians

>  HP WATER
U
JETTING CLEANING
> 
Professional & safe hydro blasting
operations with ultra high pressure
water jetting pumps designed to
deliver up to 2500bar (36.250PSI)
with two operators fully equipped
with PPE

> DRY & SLURRY BLASTING


> 
Surface treatment by dry and wet
blast cleaning up to NACE #2 / > VIETSOVPETRO
SSPC-SP10 "Near White Blast" or > Project: BK Thien Ung Project
Sa 2½ as well as power and/or hand
tool cleaning to ensure surface > Duration: 2015
cleanliness & contamination-free > Works description:
• Fireproofing BK topside

> ALL TYPES OF COATING



SERVICES
> 
Comprehensive corrosion survey
to determine priority painting
maintenance works & execute
corresponding remedial actions
as per Customer’s coating system PREMIER OIL
> 
specifications > Project: Repair works and
coating application
> Duration: 2013 - 2021
> Works description:
• Fibre optic JP support repair
• Offshore wrapping & leak
> THERMAL & ACOUSTIC INSULATION repair works
> 
Seasoned Tinsmiths and Insulators • External coating & Belzona
application
to fabricate, install, repair, remove and re-install all
types of conventional,
flexible & spray on insulation systems

> PHATECO
> Project: UHP machine and
manpower supply
> Duration: 2020
> Works description:
• Provision: Full set of UHP
ENGINEERED COATING machine and skilled technicians
> Perform Belzona application for steel to perfom UHP cleaning on
struture with Technicians qualified by offshore platform.
Belzona, along with material supply

> 36 > 37
Oil & Gas – Mid &
PLATFORMS NAM PHUONG XANH - DUC TUNG
> P roject: Long Son Refinery Construction GAS
& RIGS >D  uration: 2020
PLANTS
CONSTRUCTION
> Works description:

Downstream
• S teel Structure Blasting & Coating PROJECTS
PROJECTS • Internal Pipe Blasting and Painting

PTSC MC CONSTRUCTION PROJECTS


MAINTENANCE & SHUTDOWN
> P roject: P
 V shipyard: Daman PROJECTS NAM CON SON PIPELINE

CONSTRUCTION & MAINTENANCE PROJECTS


Development Phase 2
> P roject: N
 am Con Son Pipeline
> D
 uration: 2016 TECHNIP
> Works description: >D  uration: 2016 - 2017
• Fabrication, Erection, Pre-commis > P roject: P
 TSC Quang Ngai > Works description:
sioning (Onshore Vietnam), Load-out, >D  uration: 2014 • B lasting & Painting and touch-up/repair
Sea-fastening and grillage. > Works description: gas pipeline(2016)
• Tank and drum coating service • Repair PFP system on Sub-racks and
> P roject: H
 RD Process Platform Project Platform of Gas Process Train 2 (2016)
> D uration: 2014 PVMC • PFP system repair (2017)
> Works description: > P roject: B
 inh Son shutdown
• Structural steel thermal spray coating >D  uration: 2014
> Works description:
MAINTENANCE & SHUTDOWN
> P roject: S
 ao Vang Dai Nguyet Project PROJECTS
• S
 caffolding material & manpower
> D uration: 2019
supply
> Works description: SHELL GO DAU
• PFP Coating Service SVDN-LS-0008: DMC
Supply certified manpower and Training > Project: T
 ank Coating and Pipeline Spot
course > P roject: B
 inh Son Refinery Repair Work
>D  uration: 2017 >D uration: 2016
> P roject: G
 allaf Project > Works description: > Works description:
> D uration: 2019 - 2020 • Sea water intake repair and coating • Provision of manpower and materials
> Works description: for Base Oil Tank external recoating
• Gallaf PFP Coating (BATCH 1) - DUNG QUAT REFINERY and tank bottom repair
Alshaheen G28: Supply PFP Material, • 8'' PO Pipeline spot repair work.
Equipment and Certified Manpower > Project: M
 ain Cooling Water Pipe Coating
• Rejuvenation and painting for T-03,
and Flange Repair
T-04, T-201, T-202 Tanks
VIETSOVPETRO >D uration: 2017
> Works description:
> P roject: BK Thien Ung Project • P rovision of Manpower and Materials to TOTAL GO DAU
>D  uration: 2016 do coating for Main Cooling Water Pipe > Project: P
 FP Coating and Sphere Tank
> Works description: • Application Belzona to repair flange Coating
• Fireproofing for BK topside
>D uration: 2017
BINH SON REFINERY > Works description:
AIBEL (THAILAND)
> Project: F
 loating Hose Repair, Equipment • Provision of manpower and materials
> P roject: JSP2 Offshore Platform for PFP and Sphere Tank Coating
Maintenance
>D  uration: 2019 - 2020
> Works description: >D uration: 2017, 2019 - 2022
• Thermal Spraying Aluminum Coating
> Works description: NAM CON SON PIPELINE
• Provision of Manpower and Materials to > P roject: S
 caffolding Supply and PFP
• Conventional coating
repair floating hose
• Equipment maintenance at site and at >D  uration: 2017-2019
Dung Quat WS (Tank, Spool,...) > Works description:
REFINERY
PROJECTS
ANH PHAT JSC
• Provision of manpower and material
for Scaffolding works at NCS Plant.
• Cementitious PFP Repair
> P roject: N
 SRP 1st TA
>D  uration: 2019 TRUNG TIN ASIA (TT ASIA)
CONSTRUCTION PROJECTS > Works description: > P roject: P
 V Gas - Sphere Tank Legs
JGCS CONSORTIUM • Flange Facing & Hot Bolting Works
>D  uration: 2019
• Insulation Installation, Material Supply
> P roject: N
 ghi Son Refinery and Petro > Works description:
Chemical Complex Project • Hydro Jetting Work
• PFP Application for Sphere Tank Legs
>D uration: 2014-2017 • Refractory Work
> Works description:
• M
 obilization, erection & operation of PME
Vivablast Centralized Painting work- > P roject: N
 SRP 1st TA
shop -200,000 m2 of steel structure
and piping, General cosmetic coating >D  uration: 2019
> Works description:
TECHNICAS REUNIDAS • Bolt Tightening Work
> P roject: R
 APID Project
>D  uration: 2016-2018 DOBC - XN3
> Works description: > P roject: B
 SR 4th TA
• Painting piping work
>D  uration: 2020
PV ENGINEERING > Works description:
• Internal Anti-corrosion coating for
> P roject: R
 APID Project
seawater pipeline.
>D  uration: 2017 - 2018
> Works description:
• B
 lasting & painting pipe spool support
package 6

> 38 > 39
Platforms & Rigs
> PTSC MC
> Duration: 2011 - 2012

> Project: Su Tu Den Project / Risers


> Works description:
• Structural steel thermal spray coating
CONSTRUCTION PROJECTS > Project: Su Tu Vang Project –
Flare Booms
> Works description:
> BLASTING & PAINTING
 > PASSIVE FIRE PROTECTION
 • Structural steel thermal spray coating
> 
All types of professional blasting > 
Structural steel passive fire
and coating services delivered protection system installation > Project: Topaz Development
both at Vivablast Workshops or for wellheads, production > Works description:
at Customers jobsites & quarter platforms (steel structures,
• Beam Topside Firewall
risers, piping, supports & firewalls)
• Passive Fire Protection Coating
Chartek 8 (H-50 Fire Rating)

> PTSC MC

> Duration: 2011 - 2012
> Project: Bien Dong 1 Project -
WHP, PQP, Flare Boom
> Works description:
• Structural steel passive fire
protection by application of epoxy
> THERMAL SPRAY COATING > CERAMIC COATING intumescent fireproofing system
(Firetex M89/M90)
> 
Shop and field metalizing > 
Surface preparation and
• Structural steel thermal spray coating
services of flare booms, risers, gas internal ceramic lining systems.
compressors, seal panel Application for vessels and • Vessel internal lining by ceramic
piping, valves, splash zones for anticor- coating application
drums, designed to resist high
rosion and high temperature protection temperatures, abrasion & chemicals

> VIETSOVPETRO
> Duration: 2011

> Project: DK1/14 Project


> Works description:
• Structural steel blasting
& anti-corrosion protection

> Project: Bien Dong 1 Project –


Moc Tinh Flare Bloom
> THERMAL INSULATION

> Works description:
> 
Provision and installation
of mineral wool insulation • Structural steel thermal spray
with metal cladding for piping Aluminium coating
& equipments as well as
non-combustible & fire-resistive spray
on insulation
> AIBEL (THAILAND)

> Duration: 2019 - 2020
> Project: JSP2 Offshore Platform
> Works description:
• Thermal Spraying Aluminium Coating
• Conventional Coating

> 40 > 41
Refinery & Gas Plant
> J GCS CONSORTIUM
- NGHI SON REFINERY
> Duration: 2014-2017
> Project: Nghi Son Refinery and
Petro chemical Complex

PROJECTS Project
> Works description:
• Mobilization, erection & operation
of Vivablast Centralized Painting
workshop -200,000 m2 of steel
structure and piping, General
cosmetic coating.

> TECNICAS REUNIDAS



- RAPID PROJECT
> Duration: 2016-2018
> Project: RAPID Project
> Works description:
• Surface preparation and painting
application for piping of awarded
packages at site and workshop in
> MOBILE BLASTING &
 > THERMAL INSULATION
 Malaysia
PAINTING FACTORY > 
Manage large scope of thermal
> 
Centralize all blasting & painting works insulation works (material supply
near refinery project site at VB Mobile & installation) for construction &
factory, which helps to reach high commissioning of utility boilers,
productivity & quality compliance with storage tanks, vessels, drums,
all QA/QC inspection at one location. piping, and pipe racks.
> BINH SON REFINERY
> Duration: 2017
> Project: Floating Hose Repair
> Works description:
• Visual Inspection to determine the
damages to be repaired (other tests
shall be conducted by DMC/BSR)
• Cut and removal of damaged and
loose hose particles from each
cracked position
• Abrading the surface by using a
strong wire brush
• Belzona application

> DOBC - XN3



> PAINTING, INSULATION &
 > SHUTDOWNS PROJECTS > MECHANICAL WORKS
SCAFFOLDING DAILY > Duration:2020
MAINTENANCE > 
We deliver ceramic & other special > 
We perform mechanical repair works
> Project: BSR 4th TA
coating maintenance services as at refineries and gas plants to repair
> 
We provide multi-skilled and well as comprehensive scaffolding & damages of equipment and steel > Work description:
trained Technicians to maintain insulation solutions for structure due to long lasting usage. • Surface Preparation
every day refineries & gas plants shutdowns projects.
with professional scaffolding, • Internal Coating Application for
insulation & painting works. Seawater Pipeline

> 42 > 43
EQUIPMENTS INDUSTRIAL PLANTS INDUSTRIAL PLANTS

Industrial assets
FABRICATION & INFRASTRUCTURE MAINTENANCE
& COATING CONSTRUCTION PROJECTS
PROJECTS PROJECTS CARGILL (2005 - 2016)
ROLLS ROYCE MARINE (2009-2017) > P roject: Bien Hoa Factory Maintenance
BLUESCOPE STEEL (2004-2018) > Works description:
> P roject:  > P roject: P hu My Cold Rolling Mill Project • HP water cleaning, painting works, logo

PROJECTS
OBW, ARF, KDE 40, KDE 60, > Works description: coating, cladding replacement. Floor
CGGV, KDE 80, SINOPEC, • Equipments, sheet cladding, metal doors coating & Road Marking
BAKER HUGHES, CRC 150, & frames surfaces surface preparation
IOCAS, OIL TANKS, KDE 400, & coating VINAKRAFT SCG (2012-2018)
NIO, WESTERN GECO, > P roject: facility Refractory > P roject: Shutdown & Equipment Coating
STX LANGSTEN, ARF STM, > Works description: > Works description:
CTD JACKING FRAME • The revamping of Refractory linings in • Scaffolding Provision
> Works description: a well-recognized steel manufacturer’s
• Boiler pipe & Gear box external coating
• Blasting & protective coating facility
& internal blasting. Nash Pump blasting
• Thermal spray coating TOTAL (2004 - 2018)
MASAN RESOURCES (2014 - 2020)
COMMON GROUND RESOURCES > P roject: Tanks, sphere tanks
(2011-2018) > P roject: Nui Phao Mining
refurbishment
> P roject:  > Works description: > Works description:
• Various surface preparation • Surface preparation, UHP cleaning,
Waste Water Treatment Containers
> Works description: & painting works touch-up painting. Ruber lining
• Fabrication • Provide Scafollding, Rope Access • Shutdown & Daily general maintenance
• Blasting and anti-corrosion treatment URC VIETNAM (2008-2018) • Cable tray CO2 cleaning, Cable PFP
coating & Heat exchanger cleaning
METACOR (2013-2017) > P roject: Food Plant
> Works description: • BS1139 Scaffolding & Tank Coating
> P roject:
- Stejasa Project • Floor coating VINA ECO BOARD (2018 - 2020)
• Mold, baker cleaning by CO2 Dry Ice > P roject: Maintenance Projects
- Bergemann Project
- NEM Beni Suef Combined Cycle Project NESTLE (2013-2014) > Works description:
- Hamitabat Project > P roject: C
 leaning and Insulation • Tank Internal Coating
> Works description: • Dry ice cleaning Heater and Conveyor
- Baltec Project belt, Sliding door & Sealing work
• CO2 dry ice cleaning coffe drier
- Babcock & Wilcox cleaning, Pathway, • Air receiver tank refurbishment
Nooter/ Eriksen Project • Acoustic Insulation for settling Tank
> Works description: system (Noise Insulation) ADM (INVIVO) (2018, 2019)
• Blasting and Painting for dampers, • Hot insulation and painting > P roject: Maintenance Project
diverter, steel structure DONAFOOD - DONG NAI (2014) > Works description:
DK ENGINEERING JSC (2014-2016) > P roject: F
 loor Coating Repairs • Cladding Repair by Rope Access
> P roject: C
 IS Skid, Rig Laucher, Tote Tank, > Works description: BUNGE/VAL (2018-2020)
Hot Water Skid • Floor repair and Coating application
> Works description: > P roject: Equipment Maintenance
• Surface preparation with 3 & 4 coating RUSSIAN VODKA JSC > Works description:
appplication > P roject: B
 uilding New Factory • Acid Floor Tiles & Condensor Tube
• Silo tank bottom repair
• Insulation installation > Works description: • Water proofing service
BPE THAILAND (2017) • Factory Setup and Building
NSG (2019 - 2021)
> P roject:  FARGO - CHINA (2017) > P roject: Cleaning Project
Seperator skid, Valve and Casing > P roject: M
 ercedes Benz factory > Works description:
> Works description: > Works description: • ESP & Coaters Cleaning
• Surface preparation with 3 coating • Surface preparation & repainting
appplications BARIA SERECE (2018-2019)
FAIST - CHINA (2017)
> P roject: Maintenance Project
BACONCO FACTORY (2018) > P roject: F
 actory Construction Phase > Works description:
> P roject: Conveyor Repair > Works description:
• Surface preparation • Scaffolding, Man-lift & Rope Access
> Works description: • Painting application • Surface Preparation: Power tool
• Conveyor Fabrication and Coating cleaning, HP Water Cleaning, Steel Grit
RESINOPLAST - DONG NAI Blasting
HATASI (2019) > P roject: F
 actory Upgrade EPC • Concrete column repairing & coating
> P roject: S
 pool Fabrication > D uration: 2018 - 2019 • Equipment refurbishment
> Works description: > Works description:
• Pipe Spool Fabrication at Vung Tau WS PV - CA MAU FERTILIZER (2018-2019)
• Site survey for inspection and detailed > P roject: Maintenance Campaign
BARIA SERECE (2019) technical solution
> Works description:
> P roject: S
 tructure Fabrication • Concrete floor surface preparation and
coating • Provision of Manpower, Material, and
> Works description: Equipment for Anti-corrosion Coating
• Refurbishment hopper No. 14 • Re-engineering of Production processes Work at the plant in Shutdown period
• Supply & installation anti-slip sheet • Overall factory upgrade for production and Production time.
VIET INDU (2019 - 2020) optimization • TSA coating performance
> P roject: Tambour Fabrication > P roject: D
 aily Maintenance Program ALPHA ECC & NDT (2017 - 2020)
> Works description: > D uration: 2019 - 2023 > P roject: Maintenance Projects
• Supply material, machine & manpower > Works description: > Works description:
to fabricate Tambour, Pin Tack • Manpower, Equipment Supply for Equip- • Blast & Painting and TSA Application
Other equipments & structural steel anti-corro- ment Erection • UHP Cleaning
sion protection Projects • System modification SWIC (2020 - 2021)
• Zamil Steel Vietnam • Maintenance spare part & equipment > P roject: Maintenance Projects
• Bluescope Steel supply > Works description:
• Universal Steel Fabrication • Anti-corrosion protection for Under-
Vina-Japan ground Pipeline
• Atlas Copco

> 44 > 45
Equipment
> BEST PERFORMANCE ENGINEERING
> Duration: 2017
> Project: Seperator Skid, Valve and Casing
> Works description:
• Surface preparation and apply 3-layer coating

FABRICATION AND COATING PROJECTS

> EQUIPMENT > CONTAINERS A60



FABRICATION FIREPROOFING
INSULATION
Execute fabrication works for
>  A60 rated decks & bulkheads rock
> 
equipment both at site and at wool spray on insulation services
workshops such as waste water for accommodation modules built
> ROLLS ROYCE MARINE
containers for offshore purpose
> Duration: 2009-2017
> Project: OBW, ARF, KDE 40, KDE 60,
CGGV, KDE 80, SINOPEC,
BAKER HUGHES, CRC 150,
IOCAS, OIL TANKS,
KDE 400, NIO,
WESTERN GECO,
STX LANGSTEN, ARF STM,
CTD JACKING FRAME
> Works description:
• Blasting & protective coating
• Thermal spray coating

>  AMIL STEEL VIETNAM


Z
BLUESCOPE STEEL
> THERMAL SPRAY
 USF
>  URFACE PREPARATION
S ORIENTAL SHEET PILING
AND PROTECTIVE COATING COATING
CHINA HARBOUR ENGINEERING
Professional anticorrosion
>  Equipments metalizing through
>  SAMSUNG
solutions for equipments to electric arc wire and flame wire SIEMENS VAI
be exported to the world’s spray processes as per NACE HYUNDAI MOBIS
largest shipyards including standard RP0287 for surface > Duration: since 1994
steel grit blasting & application preparation & ISO 4624 for
> Works description:
of protective, polysiloxane & coating quality control
other special coatings. • Steel structures, sheet piles, piping, equipments
blasting & anti-corrosion protection

> FABRICATION WORK AT


VUNG TAU WORKSHOP
> Duration: 2018 - 2020
> Project: Hopper No. 14, Pipe Spool
Fabrication, Tambour & Pin
Tack Fabrication,
> Works description:
• Supply Material, Equipment, Tools and
Specialized Machines
• Fabrication as client's specifications

> 46 > 47
Industrial plant
RESINOPLAST
> 
> Project: Factory Upgrade
> Duration: 2018 - 2019
>  Works description:
• Site survey for inspection and
detailed technical solution.

INFRASTRUCTURE CONSTRUCTION PROJECTS • Concrete floor surface prepara-


tion and coating.
• Re-engineering of Production
processes
• O verall factory upgrade for
production optimization

FAIST
> 
> Project: Mercedes Benz factory
>  ROTECTIVE COATING
P > WATERPROOFING & > FLEXIBLE &
> Duration: 2017
(SHOP & FIELD) HDPE MEMBRANE CONVENTIONAL INSULATION
>  Works description:
INSTALLATION
• Surface preparation with solvent
Mobilize & operate heavy-duty
>  Supply and installation
>  Design & manufacturing of
> 
cleaning, fresh water usage to
equipment at VB workshops of APP, SBS and other types tailor-made flexible insulation
neutralize all solvents, sufficient
& on site for all types of of waterproofing membranes pillows & conventional insulation
surface roughness creation
professional surface preparation for roofs as well as application systems for all types of industrial
of cementitious mortars for equipment and piping • Repainting application
& painting works
concrete waterproofing and HDPE • Access method: Cherry picker
membrane for ground site soil and Scissor lift
improvement

VINATABA - BRITISH
> 
AMERICAN TOBACCO
> Project: F
 ire Fighting System
Repair
> Duration: 2017
>  Works description:
• Replaceing Teflon by Eco-friendly
material
• Hydro testing after completion
• Access method: Boom lift, BS
> INDUSTRIAL
 > MECHANICAL WOKS > ENGINEERING, PROCUREMENT
 Scaffolding, Ladder
FLOORING SYSTEMS STEEL REPLACEMENT / AND CONSTRUCTION (EPC)
RE-ENGINEERING
Provision of specialized
>  Provide cuting, welding and
>  Provide full package for
>  > NESTLE
equipment for concrete floor replacement works for steel industrial factory upgradation
surface preparation and various structure at industrial plants in including survey, floor coating, > Project: Nestle Tri An / Route 66 Coffee
flooring systems application for construction phase re-engineering. > Duration: 2012
all types of industrial purposes
>  Works description:
• Main subcontractor for all piping
equipment and thermal insulation works
• Waste to Energy Boiler: ESP, boiler, ducting
and piping
• Roasting, Extraction, Evaporation & Egron
Buildings: Equipments and piping insulation
• Roasting & Egron Building: Valves and
flanges flexible insulation pillows design and
supply
• Gensets & Blowers Rooms: Acoustic
spray-on insulation

> 48 > 49
Industrial Plant
PV CAMAU FERTILIZER
> 
> Project: 
Maintenance Campaign

MAINTENANCE PROJECTS
> Duration: 2018-2019
> Work description:
• Provision of Manpower, and
Equipment, Material for anti-
corrosion coating at plant
• TSA Coating

MECHANICAL WORKS
> 
MAINTENANCE AND REPAIR
Provide cuting, welding,
> 
> VINAKRAFT SCG
replacement works for steel > Project: Shutdown and
structure to repair damages Equipment Maintenance
after long term usage.
> Duration: 2012 - 2020
> 
Work description:
• Scaffolding Provision
• Boiler pipe external coating
& internal blasting
• Gear box internal lining &
> COATING external coating
MAINTENANCE PROGRAMS • Nash Pump blasting

Our coating Inspectors deliver


> 
corrosion surveys to define and
execute all types of protective
coating application for repairs
and renewals. MASAN RESOURCES
> 
> Project: Nui Phao Mining
> Duration: 2014 - 2019
> 
Work description:
• Surface preparation, UHP water
>  P/UHP WATER
H cleaning, touch-up painting
• Daily general maintenance
JETTING CLEANING • Cable tray CO2 cleaning
High pressure and ultra high
>  • Cable PFP coating
pressure water jetting systems • Fitter and Welder Supply
allow from 300bar to 2,500bar • Tank External Coating
of pressure (4,300 to 36,250PSI) • Rubber Liner Supply
for cleaning, paint removal and • Blaster and Painter Supply
surface preparation. • Heat Exchanger Cleaning
• BS1139 & Ringlock Scaffolding

BARIA SERECE
> 

> Project: Equipment Daily


Maintenance
> Duration: 2018 - 2020
> Work description:
• Access Method: Scaffolding,
Rope Access, Man-lift
• Surface Preparation: Power
tool cleaning, HP Water
Cleaning, Steel Grit Blasting
• Painting Application

> 50 > 51
Shipbuilding
> PIRIOU (SEAS)
> Project: Sapmer 92 m.
Deep Freeze Tuna Vessels
Projects (4 units)
> Duration: 2007-2012

PROJECTS > Works description:


• HP/UHP water jetting
• Marine, protective, polyester &
gel coating. Deck,floor coatings
• PVC tiling. Carpentry
• Polyurethane foaming
• Spray-on & conventional
insulation. BS scaffolding, rope access &
cherry pickers
> Project:
62.8m Long Liner Insulation & Coating
> Duration: 2017 - 2018

> VARD (STX)


> Project: Supply Vessels
Project (5 units)
> Duration: 2010 – 2012
> Work description:
• Marine & protective coating
• Thermal spray coating
• Thermal insulation
• PU foaming injection

>  TRATEGIC MARINE


S
VIETNAM
> Project: Barges & Pontoons
Projects (10 units)
> FLOOR COATING > TANKS INTERNAL LINING
 > HULLS ANTI-CORROSION

> All types of floor coating for > Ballast, potable water & other tank AND ANTIFOULING PROTECTION > Duration: 2010 - 2012
sanitary & kitchen areas and PVC surface preparation as per SA 2.5 > As per SSPC and ISO standards for > Works description:
floor covering for accommodation, ISO 8501-1:1998 and professional full QA/QC traceability and warranty of
mess & control rooms lining • Marine & protective coating
surface preparation & coating application
• Ballast tanks, void spaces
internal lining
• Decks, underwater, topsides
coating

> CONVENTIONAL

THERMAL AND > AUSTAL VIETNAM
ACOUSTIC INSULATION > Project: Deck & Catamaran
> Exhaust pipe main engines, Coating
generators and auxiliary engines
thermal and acoustic insulation by > Duration: 2018 - 2021
mineral wool & metal jacketing > Work description:
• Pillars Blasting & Painting
• Deck Coating
• 94M Catamaran External &
> EQUIPMENTS
 Internal coating
POLYURETHANE • H423 Surface Preparation
FOAMING COLD and Apply Primer Coat
INSULATION • Epoxy Fillers
> DNV certified polyurethane foaming • Cylinder Paint Repairing
materials injection and pouring for
cold insulation of equipments, piping
and cold rooms

> 52 > 53
Shipbuilding
> PIRIOU (SEAS)
> Project: Bourbon Offshore 53m.
Fast Service Intervention Vessels
Projects (5 units)

PROJECTS > Duration: 2012


> Work description:
• Marine & protective coating
• BS scaffolding & cherry
pickers

> PIRIOU (SEAS)


> Project: Bourbon Offshore 18 m
& 26 m. Surfer Projects
> Duration: 2007-2012
> Work description:
• Marine, protective & silicone
elastomer antifouling coating
• Cabin thermal insulation
> THERMAL SPRAY >  P/UHP WATER
H >  ECKS AND EQUIPMENTS
D
COATING JETTING CLEANING ANTI-CORROSION
PROTECTION
> Fenders, masts, alley ways and > With Hughes Ultrabar 24 UHP and
piping metalizing (arc & wire spray) Harben HP water jetting pumps > With professional equipments including
including blasting SA 3 as per ISO operated by certified & qualified peristaltic pumps for sprayguard & armor
8501-1:1998 (site & workshop) Operators compound application

> STRATEGIC MARINE


VIETNAM
> A60 FIREPROOFING AND
 > Project: Trawler Ship Insulation
ACOUSTIC SPRAY ON and Painting
INSULATION > Duration: 2018
> Bulkhead and deck A60
> Work description:
fireproofing by rock wool spray
on insulation & equipments • Marine & protective coating
acoustic insulation by glass wool • Polyurethane foaming
spray on insulation

> CARPENTRY,
 > WOOD FLEET
STRATIFICATION
AND GELCOAT > Project: Freezer Insulation
> Wood frames & plywoods > Duration: 2019
installation, PU foaming insulation,
stratification & food grade gel > Work description:
coating for cold room insulation • 30m Freezer Trawler Freezer
insulation

> 54 > 55
Equipment
• M
 anual folding machine • M
 anual punching machine
• E
 lectric cutting machine POINC 63
• M
 anual rolling machine • M
 anual cutting machine

• M
 anual grooving machine • M
 anual folding machine

• E
 lectric sawing machine • E
 lectric cutting machine

LIST SELECTION • Insulation line • S


 tud welding machine
Cutlass Clipper
> H
 DPE MEMBRANE INSTALLATION
> H
 IGH PRESSURE WATER JETTING • E
 lectric wedge welding • Extruders
• UHP Hughes Ultrabar 24, twin operator 2500bar (36.250PSI)
machine
• UHP Densin Ultra High Pressure Pump C-2500/25D (40,000 PSI) > STEEL FABRICATION AND MECHANICAL WORK
• HP Harben Pump (10,000 PSI) • Stand drilling machine • Plasma/ Gas cutting
• H
 igh pressure water cleaner Kanzl, Densin 220v, Karcher (300 bars) • Arc welding machine SAF • Plate punching
> B
 LASTING • Mig welding machine Iron • H-Beam Beveling/ Drilling
Hobart machine
• A
 ir filter pot for blaster Meiji • A
 quablast pot 200L
(wet blasting) • Arc welding machine • Plate shearing
• Air filter pot for blaster
• P
 ortable dust free
• Tig welding machine • Band sawing
• Air lubricator
blasting Clemco • Tig/arc welding machine • Y line and Conveyor
• Air cooler
• Internal blasting devices • Stud welding machine • Plate Fold-Bending machine
• Air receiver tank 3200L RSR-2500
• M
 anifold quick coupling
• Air receiver tank 5000L Ø32/8.5 > POWER AND SCAFFOLDING ACCESS
• Blasting pot 100L / 200L • R
 ecycler Blasting pot C-130
• Gondola • M
 ultidirectional Scaffolding:
• B
 lasting pot 450L • Recycler grit kV8 3-8 tom/H 50 tons of steel planks,
+ Vaccom Blast • Manitou Access 180ATJ
• Dryolite tank ledgers, braces, transoms, etc.
• Blasting pot 600L • Rope access equipment kits
• B
 S 1139 Scaffolding:
> P
 AINTING 1200 tons of tubes, boards,
• Airless pump 45:1 • Airless pump 68:1 couplers, base plates,
ladders, etc.
• Painting pot HVLP • E
 lectric paint heater machine
• I nternal painting devices • Peristaltic Hose Pump > LIFTING
• A
 irless pump underwater • T-Bone crane 5T • Bobcat forklift 743
• Zoomlion crane 25T • M
 anitou forklift MT1335SL
> P
 ASSIVE FIRE PROTECTION 3,5T
• Groove crane 30T
• CoverCat 352F Plural Component Pump Systems • I SUZU trucks 4.6DI
• Manitou forklift 8T
• Putzmeister machine 5.5 tons
• TCM forklift 5T
• I SUZU boom truck 4.6DI
> T
 HERMAL SPRAY COATING • Toyota forklift 3T 5.5 tons
• Flame metallizing machine • Arc metallizing machine • M
 anitou forklift MT732 3,5T

> INDUSTRIAL FLOORING > C


 OMPRESSORS
• Concrete trowel machine • Airless stripper line lazer • E
 lectric compressor HS.1001 • Compressor IR400
• Concrete cutting machine • Blastrac machine 1.10 DS
380v • C
 ompressor Denyo 775, 670
• Helicopter machine • E
 lectric concrete grinding
• E
 lectric compressor Iwata
• C
 ompressor Airman 655,
machine CS-390NB, GZ/10Hp 380v, 390
• Concrete mixer machine 10bar 380v
• Blastrac vacuum • C
 ompressor Atlascopco 750
• C
 imar planetary grinding • E
 lectric compressor
machine • Brusher machine for floor Atlascopco GA-160 • C
 ompressor Komatsu 740
• Cimar Scarifier • E
 lectric compressor • E
 lectric compressor
Hitachi-Bebicon, 75 SCR-100I
> P
 U FOAMING & SPRAY ON INSULATION • E
 lectric compressor
• Matrafoam GH 140 • M
 agnus Venus Composite Bumatec 16m3/min
• P
 lural component spray coating
& Gelcoat Pump
equipment Graco XP70 • Mini Jet spray machine & > G
 ENERATORS
equipments • Generator Volvo 500Kva • Generator Isuzu 35Kva
> D
 RY ICE EQUIPMENT • G
 enerator Yanmar 350Kva • Generator Yanmar 150Kva
• Cold Jet Selected SDI 60 • Cold Jet Aero 40HP • Generator Vinapro 15Kva • Generator Honda 10Kva
• Cold Jet i3 Micro Clean • Cold Jet Pelletizer P325 & Reformer > S
 TORAGE & OFFICE CONTAINERS
> C
 ONVENTIONAL INSULATION • Office container 20Ft • Container 40Ft
• E
 lectric rolling machine • M
 anual punching machine • Container 10Ft • Living container 40Ft
• E
 lectric grooving machine • Decoiler DS-301 • Container 20Ft • Living container 20Ft
• Electric lockformer • Decoiler DS-300

> 56 > 57
Testimonial Index
FROM OUR CLIENTS FOR YOUR INFORMATION

> Company Profile .............................................................................................................................. 2-5


> HSE (Presentation & Statistics) .......................................................................................... 6-7
> Quality Presentation & Applicator Certificate ........................................................... 8-9
October 11, 2017 LETTER OF RECOGNITION 29 Jun 2017

To: Whom this May Concern 14 march 2017 To whom it may concern > Facilities (Permanent & Mobile) ............................................................................ ............. 10-11
Sub: AES – VCM Mong Duong Power Co., Ltd would like to provide To whom it may concern Since Jan 2014, our strong cooperation with VIVABLAST Vietnam
testimonial for Vivablast during 2017 Outage. Following the successful completion of Supply of PFP repairs on the pipe
has been a real asset for Masan since VIVABLAST integrated
solutions and services do meet our international quality, safety and
> Integrated Solutions ............................................................................ ............. 12-13
rack Train 2, NAMCONSON PIPELINE CO.,
AES would like to thank the Vivablast team in accepting the challenge. Vivablast schedule.

Services
demonstrated strong dedication towards the successful accomplishment of the scope.
This was the first ever attempt for AES to clean a coal-fired boiler using the rope
NCSP Management is pleased to present to VIVABLAST (VIETNAM)
CO., LTD
We are confident in Vivablast’s capabilities and professionalism to >
access method. deliver our expected results on-time, on-budget and safety.

The rope access method has delivered its promise while keeping a high standard
This letter of Recognition for the work achieved during Dec 2016
VIVABLAST has been providing the shutdown services to Protection ............................................................................ ........................................... 14-15
of safety and providing a versatile, secure way of performing our intended tasks at - Train No. 2 – Supply of Man Power for Passive Fire Protection Masan:
height. We are confident in Vivablast’s capabilities and professionalism to deliver our
expected results on-time, on-budget and safety.
Repairs
- Shutdown Jan 2014, Oct 2014, Apr 2015, Oct 2015, Mar 2016, Insulation ............................................................................ ........................................... 16-17
- All works were achieved in compliance with NCSP HSE system of Oct 2016, Jun 2017
This work was implemented together along with other Vivablast specialist trades
such as Ultra High Pressure Water Jetting Services, Coating Supervision and Anti-
works with ZERO LOST TIME INJURY Safety Target Achieved.
- Anticorrosion Campaign since Jan 2017 Fabrication ............................................................................ ........................................... 18-19
- All works were achieved in compliance with NCSP Specification,
corrosion survey inspection during our shutdown following international standards schedule and budget.
in the field.
- All works were found of high quality standards, and good
Based on the achievements of VIVABLAST since 2014, we are
pleased to confirm VIVABLAST as a professional Company for all Mechanical ............................................................................ ........................................... 20-21
management between VIVABLAST (Vietnam) CO., LTD and types of surface preparation, coating, special linings, BS scaffolding
Based on the achievements of Vivablast, we are pleased to confirm Vivablast as a
specialized company for all Industrial Assets Protection works required for daily
NAMCONSON PIPELINE CO. and insulation works required for challenging and large construction Access ............................................................................ ........................................... 22-23
growing Industrial demands. - Supervisor and Project Engineer had good safety behavior, good daily
projects in Vietnam.
reports, managed their manpower very well to follow strictly NSCP
WCS and HSE requirements.
Engineered Coating And Material ................................................................ 24-25
> Project References
Power Generation .................................................................................................. 26-27
Power Generation Construction ...................................................... 28-29
Power Generation Maintenance ...................................................... 30-31
Renewable Power Maintenance ...................................................... 32-33
Oil & Gas - Upstream ............................................................................ ............. 34-35
Platforms Offshore Maintenance ...................................................... 36-37
Drilling Rigs Offshore Maintenance ............................................... 36-37

TO WHOM IT MAY CONCERN Following the completion of Oil & Gas - Mid & Downstream ...................................................................... 38-39
According to the request of Mekong Energy, Vivablast performed 7 days of
Dry ice cleaning to remove sulfur residue from its boiler HRSG 1 during the
Date: 26th of August, 2012 B.O.T Phu My 3 Project 700 MW CCPP Platforms & Rigs Construction ......................................................... 40-41
2nd week of December, 2013.

Operating safety with its heavy-duty equipment for hazardous contaminants To whom it may concern
SIEMENS Power Generation is pleased to present to Refinery .................................................................................................. 42-43
Gas Plants 42-43
removal, the Vivablast Team was able to meet our productivity and safety
expectations throughout this period while ensuring full compliance with our
V3 / PREZIOSO (Vietnam) co., ltd.
..................................................................................................
technical specifications for boiler cleaning. On behalf of Diamond Offshore Drilling, Vivablast performed a 40 day offshore
maintenance project to refurbish the coating(s) on some of the main decks on the This Letter Of Recognition,
Thanks to efforts and professional expertise, our productivity has recovered 1.2
MW which is equivalent to 0.16% of the power plant’s capacity.
Ocean Monarch rig during the June and July of 2012. Industrial Assets ................................................................................................. 44-45
For their work achieved from June 2003 to February 2004
Mekong Energy is confident in Vivablast’s capabilities and professionalism
to deliver expected results on time, on budget and safety since their integrated
Operating safety with its heavy-duty equipment for surface preparation and coating Equipment Fabrication & Coating ................................................... 46-47
application, the Vivablast Team was able to meet our productivity and safety ex-
solutions and services do meet our international quality, safety and perfor- pectations throughout this period while ensuring full compliance with our coating MECHANICAL AND ELECTRICAL COMPONENTS PAINTING WORKS.
mance standards. Therefore, we have been very pleased with the results and
safety performance delivered by Vivablast and hope that we can work with
technical specifications for offshore projects. Industrial Plants & Infrastructure Construction ............................. 48-49
the Vivablast Team again in the future. All works were achieved in compliance with SIEMENS specifications.
We have been very pleased with the results and safety performance delivered by
Vivablast and hope that we can work with the Vivablast Team again in the future.
All works were found of high quality standards. Industrial Plants Maintenance ......................................................... 50-51

Yours faithfully. Shipbuilding ...................................................................................................... 52-55


Duncan Coulson
> Equipment ..................................................................................................................................... 56-57

> Testimonial ..................................................................................................................................... 58

> 58 > 59
Vivablast delivers global industrial asset life solutions in South-East Asia from our
bases in Vietnam, Myanmar, Indonesia, Malaysia, Philippines, Cambodia & Thailand.
Since 1994, we have been servicing industry leaders for major projects, from construction
phase to maintenance programs.
Our vertical expertise includes all industrial sectors and particularly: oil & gas: onshore &
offshore, shipbuilding, power generation and manufacturing industries.
We secure and protect plants and equipment in construction, as well as maintain operating
industrial assets with professional integrated solutions and specialty services.

M ECHANICAL P ROTECTION
 INSULATION
SERVICES SERVICES SERVICES

> Mechanical / Electrical > HP / UHP water jetting > Conventional insulation
equipment installation
> Dry Ice CO2 Cleaning > Flexible insulation pillows
> Mechanical maintenance > Surface preparation (all types) > Flexible turbine insulation systems
services
> Protective & marine coatings > PU foaming insulation
> Commissioning services (all types of application)
> Spray on insulation
FABRICATION > Thermal spray coatings
SERVICES
> Engineer coating repairs
ACCESS SERVICES
> Fabrication capabilities > BS & Multidirectional scaffolding
> Passive fire protection and
> Steel fabrication - Equipment systems > IRATA Rope access
manufacturing & Repair
> Industrial flooring systems > Powered & mechanical equipment
> Waterproofing > Drone Inspection

Headquarters
> 
L ot B1, Street 2, Binh Chieu Industrial Zone, Binh Chieu Ward,
Thu Duc District, Ho Chi Minh City, Vietnam
 Tel: (84-28) 38 965 006/7/8 | Fax: (84-28) 38 965 004
Email: vivablast@vivablast.com
>  ranch Office & Factory 1:
B Branch Office & Factory 2:
>  > Branch Office & Factory 3:
Vung Tau - Vietnam Yangon - Myanmar Kuala Lumpur - Malaysia
Street 11, Dong Xuyen IZ, Rach No.82C-82E, U Tun Nyo Street & Level 7, Menara Milenium, Jalan
Dua Ward, Vung Tau City, Vietnam Damanlela Pusat Bandar Daman-
U Phoe Hlaing Rd corner, Ward sara, Damansara Heights 50490
Tel (+84-254) 3 616 865 116, East Dagon Industrial Zone, Kuala Lumpur, Wilayah Persekutuan,
Fax (+84-254) 3 627 187 PO 11451, Yangon, Myanmar Malaysia
Email: vivablast@vivablast.com Email: vivablast@vivablast.com Email: vivablast@vivablast.com

ISO 9001 : 2015 | OHSAS 18001 : 2007


www.vivablast.com

You might also like