You are on page 1of 98

Proposal

Under the provision of forest (Conservation) Act, 1980

For
Use of Forest Land
For non-forest purpose

ALIBAG FOREST DIVISION

Proposal No. : FP/MH/ROAD/32314/2018


Proposed Multi-modal Corridor Phase I: Section II from Chirner (JNPT) To
Balavali (NH17) for Length 18.00 km.

Forest Area Required 16.00 ha.

-Proposal submitted by-


Executive Engineer,
Mumbai Metropolitan Region Development Authority
Mumbai.
Dist.: - Alibag
Check list for preparing proposals of Maharashtra State for diverting forest land for non-
forest use under provisions of Forest (Conservation) Act, 1980 for irrigation
road/Transmission line/ wind mill/OFC/water supply scheme & other development
project.
Sr.
Details of Check list Compliance
No
1. Information of proposal from item of form 1(I) regarding short Page No.
description of the proposal / project which should invariably include.
a) cost of outlay
b) Justification for locating the project in forest area giving
alternative those were examined and reasons for the rejection.
c) Financial and social benefits
d) Total population benefited.
e) Employment generated.
2.a The Geo digital map in 1:10,000 or any suitable scale with geo- Page No.
reference boundary in shape file prepared by using total stations or
differential GPS and also indicate forest land, non-forest land &
adjoining land to the proposed for diversion, in different colors must
be duly signed by the Deputy Conservator of Forests concerned and
Project Authority, as per the GOI letter No.F.no.11-9/98-
FC,dt.8/7/2011. Compartment boundary on the map should clearly be
marked. Satellite imageries to be used to show the density of forest
cover to be enclosed.
b Index Map in 1:50000 scale with Project location: Latitude/ Longitude --
to be enclosed.
1. Proposed area up to 1.00 --
 Only one co-ordinate to be given
ha
2.Proposed area up to 1.00 Two co-ordinate diagonally to be --
to 5.00 ha given
3. Proposed area above 5.00 Four co-ordinates at four corners Page No.
ha. to be given.
B 4. Village Map Page No.

c Map of compensatory Afforestation of forest / Non forest area in Page No.


1:50000 scale with location of Latitude & Longitude. Land)
1. Proposed area up to --
 Only one co-ordinate to be given
1.00 ha
2.Proposed area up to 1.00 Two co-ordinate diagonally to be --
to 5.00 ha given
3. Proposed area above Four co-ordinates at four corners to --
5.00 ha. be given.
d A comprehensive land use plan of the area required should be --
attached if land is required for more than one purpose the building
plan and estimate should invariably be attached if the area is required
for construction purpose.
e The following information must be complied in the construction of --
State Highway /National Highway / Road/ Winding /Exploitation
Purpose / Canal / Transmission line & all other linear Project as per
GOI guideline vide No.6-MPB-071/2011-BHO-736, Dt.30/04/2012.
i Map of the alternative alignments or route map examined by Dy.CF/ Not Applicable
Project Authority to be enclosed.
ii Show proposed diversion of forest / non forest area in the Original, Page No.
colored or legible topo-sheet and to be enclosed.
iii To give the Latitude & Longitude of the proposed area at starting, Page No.
ending turning point and breaking of the forest area Which should be
identifiable.
iv To show the existing Water body / Water channel or road Which Not Applicable
should be identifiable?
v To show the newly proposed bridge /culvert / underground pass / Project Note
tunnel etc. to be identify clearly. Page No.
vi To enclose the cross section Plan / Map indicating dimension of Page No.
(Length / Width / Height /depth etc) clearly.
vii To show the additional impacted area clearly this may be impacted Not Applicable
temporarily by the proposed construction.
viii To show the diversity of the ecology this is to be impacted by the Not Applicable
proposed construction.
f Map of Eco-Sensitive Zone, in 1:2, 50,000 or 1” = 4 mile scale by Not Applicable
showing the distance of “Protected Area” from proposed forest areas
under diversion, in kilometre.
g Map of Wind Mill and Wind mast to be enclosed by showing the Not Applicable
10.00 Km radius area from the wind mast site on 1:50,000 or 1:25000
scale topo sheet.
Certificate by Dy. CF/ Chief Conservator of Forest and their
authenticated documents.
3 Documents verification Certificate by the Deputy Conservator of Certificate No.3
Forest Page No.
4 Certificate of Dy. Conservator of Forest for absences of alternative Certificate No.4
about the Project and minimum demand of forest area. Page No.

5 Certificate by the Deputy Conservator of Forests that no violation Certificate No.5


done of the FCA-1980 and their guideline. Page No.
a If violated, circumstances leading to violation date of commencement Not Applicable
of work /quantity of work done and the amount spent Certificate to
be furnished by the concerned inspection of the site of violation.
b If work started in forest land when and how much amount spent on Not Applicable
the project and the works done in the forest land.
c Detailed report of the disciplinary action or proposed to be taken Not Applicable
against the concerned staff for violation of the provisions of the Act.
d Details of clarification for violation, if administrative and technical Not Applicable
sanction accorded to the project by project authority / user agency
after the promulgation of the Forest (Conservation) Act, 1980.
6 Suitability certificate by the Deputy Conservator of Forests that forest Certificate No.6
and non forest land is suitable for raising trees species. Page No.
A The Compensatory Afforestation certificate must be geo-tagged Page No.
photos of the areas proposed for Compensatory Afforestation.
7 Certificate of Identified Forest and Acquired Forest for Compensatory Certificate No7
Afforestation Area by Dy. Conservator of Forests Page No.
8 Certificate of Identified Forest and Acquired Forest for Non Forest Certificate No.8
area under the project by Dy. Conservator of Forests. Page No.
9 Certificate by the Dy.CF Whether the proposed project likely to affect Certificate No.9
any monument site of cultural, historical, religious, archeological or Page No.
recreational importance including wild life sanctuaries and national
parks to be enclosed
10 Wild life Certificate by the Dy.C.F. Certificate No.10
Page No.
11 Net Present Value Certificate must be marked with eco-class Certificate No.11
/category of Forest as per the GOI letter F.No.5-3/2007/-FC, Page No.
Dt.05/02/2009 to be enclosed.
12 No cutting and felling of trees Certificate of by the Dy. Conservator of Certificate No.12
Forests to be enclosed Page No.
13 Certificate about distance of Project from Protected area by Deputy Certificate No.13
Conservator of Forest. Page No.
14 Certificate of Dy. Conservator of Forests regarding alternative Certificate No.14
examined for liner project (Certificate No-27) Page No.
15 Certificate by the Dy. CF Whether, the required Annexure and the Certificate No.15
particulars to the proposal furnished in English? If any Govt. orders Page No.
are in Marathi, English as required by the Government of India to be
enclosed.
16 Zudpi Jungle land offered certificate by the Dy. CF for the Certificate No.16
compensatory afforestation is in a compact patch and is Page No.
contingencies of the forest area and is suitable for the management
point of view.

17 Site inspection report form Deputy Conservator of Forests if forest Certificate No.17
area involves is less than 10 ha and by Conservator of Forests if forest Page No.
area involved is more than 10 ha in regard to sensitivity and potential
value of the forest area in regard to forest types in catchments and
submergence area.
18 Cetificicate of the Dy.CF regarding the proposal of the Eco-Tourism Certificate No.18
Page No.
Scruitininzed vide GOM order No.WLP-1002/c.r.53/F-1/dated
20.2.2008 to be enclosed.
19 Compensatory Afforestation scheme prepared by Dy.CF. Certificate No.19
Page No.
20 Medicinal plantation / road side/ canal side plantation scheme Certificate No.20
prepared by PA /Dy.cf whether the proposed area is diverted for wind Page No.
power/ transmission line and other linear proposals to be enclosed.
21 Cost benefits analysis. Whether the area is more than 20.00 ha. Certificate No.21
Page No.
22 Item wise break up of forest and non forest area required category Certificate No.22
wise (Damseat, submergence, quarry, roads, colony, canals etc.) area Page No.
statement to be enclosed
23 List of the Identified forest form the Deputy Conservator of Forest Certificate No.23
Page No.
24 List of tree, species wise/girth wise, with local and scientific name to Certificate No.24
be given. If felling of trees is essential? The estimate of tree felling to Page No.
be enclosed. As per GOI letter no. 7-1/89/(For)/Part-VIII/2012-
BHO/848, dt.18/05/2012.
Certificate by Chief Conservator of Forest and their authenticated
documents.
25 Net Present Value Certificate must be counter signed by Chief Certificate No.25
Conservator of Forest / with eco-class /category to be shown in the Page No.
certificate of Forest as as per the GOI letter F.No.5-3/2007/-FC,
Dt.05/02/2009 to be enclosed
Certificate by Project Agency and their authenticated documents:-
26 Chronological of Events Certificate No.26
Page No.
27 Attempts made to find out Non forest land for the proposal/ reasons Certificate No.27
for its rejection of the same and minimum demand of forest area. Page No.
28 Unqualified commitment from the project authority to bear cost of Certificate No.28
exploitation of felling of trees and their allied works under project. Page No.
29 Certificate by Project Authority for the cost of Compensatory Certificate No.29
Afforestation. (Certificate No.6) Page No.
30 Certificate by the project authority that no violation done of the FCA- Certificate No.30
1980 and their guideline. Page No.
31 Certificate by the Project Authority to furnish the Net Present Value Certificate No.31
as per the ordered by Government of India. Page No.
32 Certificate of project authority (Providing i.e. water supply facilities Certificate No.32
to) Page No.
33 Certificate of the Project Authority to get the Environmental Certificate No.33
clearance as per the Environmental Act. 2006 (whenever necessary) Page No.
34 Certificate of Non Indemnity to forest Department (by Project Certificate No.34
Authority) Page No.
35 Certificate or Noc from the private owner if the area under private Certificate No.35
forest act, (Acquisition) Act.1975 to be enclosed. (By villagers) Page No.
36 Certificate of the Projects Authority to take up catchments area Certificate No.36
treatment plan as per the guideline of Government of India Page No.
37 Catchment area treatment plan. Certificate No.37
Page No.
38 Command area development plan. Certificate No.38
Page No.
39 Certificate by Project Authority Whether stipulation is made that 5 % Certificate No.39
of area under command of the project is made available to the Forest Page No.
Department for planting trees and other vegetation for which
necessary irrigation should be provided free of cost by the project
authority / user agency. If the forest area involved is less than 2. 00
ha and there is no felling to tree growth; it is to be dealt with as per
simplified procedure.
40 Project note by the project authority. With salient features. Certificate No.40
a) Total catchment area Page No.
b) Total command area
c) Full reservoir level
d) High flood level
e) Minimum drawal level
f) Total catchment area of the dam (in Ha) and its breakup forest
land, cultivated land, Pasture, Human cultivation and others.
g) Details as per item (f) above for the area coming under
submergence.
h) Total No. of families and population affected, scheduled caste and
scheduled tribe families to be displaced should be separately
indicated.
i) Proposal for the rehabilitation of affected persons (Rehabilitation
Plan)
j) Comprehensive land use plan for the area required outside the
submergence i.e. building roads and other ancillary facilities
outside submergence i.e. building roads and other ancillary
facilities.
41 It has been observed that water hardly stands the ear around even Certificate No.41
upto FRL. Trees can definitely stand in water for one to three months Page No.
and therefore submergence should be calculated 2 M below FRL for
this following should be given for forest areas involved.
i) Area of submergence at H.F.L.
(High flood level)
ii) Area of submergence at F.R.L.
(Full Reservoir level)
iii) Area of submergence at 2 Meter below F.R.L.
iv) Area of submergence at 4 Meter below F.R.L.
42 List of trees 2 Meter, 4 Meter below F.R.L. in submergence area Certificate No.42
species wise. Page No.
43 Administrative/Technical approval from the competent authority to Certificate No.43
be enclosed. Page No.
44 Certificate/ undertaking by the project authority regarding the wind Certificate No.44
power project as per the GOI letter Dated 14/05/2004 to be enclosed. Page No.
Certificate by Other Department:-
45 In case of proposal related to stone quarries, the recommendation of Certificate No.45
the Director, Geological and Mines is required. Page No.
46 If any Protected/Archeological/Heritage site and other Important Certificate No.46
Monument is located in the area. The Certificate by Archeological Page No.
Department to be enclosed
47 Certificate about the distance of Project from Protected area by the Certificate No.47
Dy.CF Wildlife Department. Whether the Project area within 10.00 Page No.
Km. should be clearly shown and marked.
48 No Objection Certificate of M.D., F.D.C.M. for involvement of their Certificate No.48
area. Page No.
49 Relevant Notification/7/12 Extract/ restoration order/Rights of record Certificate No.49
etc. of the proposed forest land to be enclosed. Page No.
Certificate by Collector:-
50 Certificate from the Collector that no alternative suitable non-forest Certificate No.50
land is available for the project. (In A Form itself) Page No.
51 Certificate of Collector under the FRA-2006 with resolution of Gram Certificate No.51
Sabha/Gram Panchayat as per GOI letter dated 3/8/2009 to be Page No.
enclosed.
52 Certificate of Compensatory Afforestation land made available by Certificate No.52
Collector. Page No.
53 Certificate of non availability of non-forest area for Compensatory Certificate No.53
Afforestation by the Collector/Commissioner. Page No.
54 The agency has not given alternative land to the forest Department. If Certificate No.54
non forest land for C.A. scheme is not available in the entire state the Page No.
certificate from the Chief Secretary of the State to be enclosed.vide
GOI letter dt 13/2/12
55 As the project, area is within the 10.00 km from the boundary of PA Certificate No.55
area therefore, the information regarding 16 points check list Page No.
provided by Principle Chief Conservator of Forest (W.L.) Nagpur
which is enclosed herewith to be furnished
56. All the certificate and documents must have name of the signatory, Certificate No.56
designation, station, & date under the signature as per the GOM Page No.
letter vide, dtd.01 December 2010.
57. Resolution of the Gram Sabha may not be required in cases of Certificate No.57
projects like transmission line, roads, canals, laying of pipeline/optical Page No.
fibers where linear diversion of forest land in several villages are
involved, unless recognized rights of PTG/ PAC are being affected as
per Government of India F.No.11-9/98-FC(pt.) dated 05/02/2013
Date: / /2019
Place: Bandra.
Certificate No. 26
Chronology of Events
Sr. No. From To No. & Date
12/4/18 Executive Engineer, Deputy conservator of forest, MMC/5073/2018
M.M.R.D.A. Alibag Forest Division
02/06/18 Deputy conservator of forest, Executive Engineer, B/20/Land/930 Alibag-402 201
Alibag Forest Division M.M.R.D.A.
24/7/18 Executive Engineer, Deputy conservator of forest, MMC/Forest-2/6693/2018
M.M.R.D.A. Alibag Forest Division
20/08/18 Deputy conservator of forest, Executive Engineer, B/20/Land/2210/2018
Alibag Forest Division M.M.R.D.A. Alibag-402 201
22/01/19 Executive Engineer, Deputy conservator of forest, MMC/Forest-2/6961/2019
M.M.R.D.A. Alibag Forest Division
14/02/19 Deputy conservator of forest, Executive Engineer, B/20/Land/4802/2019
Alibag Forest Division M.M.R.D.A. Alibag-402 201
07/03/19 Executive Engineer, Deputy conservator of forest, MMC/Forest-3/7103/2019
M.M.R.D.A. Alibag Forest Division
19/03/19 Deputy conservator of forest, Executive Engineer, B/20/Land/ /2019
Alibag Forest Division M.M.R.D.A. Alibag-402 201

Date: / /2019
Place: Bandra.
Information in From-A
Part- I

Filled up by
The Project Authority

Executive Engineer,
Mumbai Metropolitan Region Development Authority,
M.M.R.D.A. Office Building,
Bandra-Kurla Complex,
C-14 & 15, E Block Bandra (East),
Mumbai- 400 051.
APPENDIX
(Sec Rule 6)
FORM – ‘A’
Form for seeking prior approval under section 2 of the proposals by the State
Governments and other Authorities
PART – 1
(To be filled up by user agency)
1.Project Details
(i) Short narrative of the proposal and Mumbai Metropolitan Region Development
project /scheme for which the Authority (MMRDA) is a planning,
forest land is acquired development, co-coordinating and
implementing agency established by the
Government of Maharashtra to ensure
balanced development combined with
sustainable growth of the Mumbai
Metropolitan Region (MMR).MMRDA's focus
has been to make the MMR a primary
destination of economic activities by
promoting infrastructure development and
improve the quality of life. In this context,
MMRDA has been instrumental in providing
various infrastructure facilities in the region.
The Government of Maharashtra (GoM)
through MMRDA with technical assistance
from World Bank under the Mumbai Urban
Transport Project (MUTP) has prepared an
updated Comprehensive Transportation
Study (CTS) for Mumbai Metropolitan Region
(MMR) known as TRANSFORM
(Transportation Study FOR the region of
Mumbai). The prime objective of this Study
was to identify the travel pattern of residents
in MMR and recommend long term
comprehensive transportation strategy for
MMR up to 2031. The Final Report was
completed in June 2008. One of the major
recommendations of TRANSFORM study is
development of Multi-Modal Corridors
(MMC) in MMR to satisfy the varied travel
demands of the region for the horizon period
up to 2031. One such corridor is from Virar to
Alibaug, also known as the Middle Ring.
MMRDA intends to seek the assistance of
consultants of international repute, for
preparation of Detailed Project Report for
Multimodal Corridor from Chirner (JNPT) to
Balavali (NH17).
The proposed Multimodal Corridor is 126.860
km Section-II from Chirner (JNPT) To Balavali
(NH17) for Length 18.00 km. (As per TEFS
Report) long and it passes through twelve
growth areas identified for future
development. The growth areas will
comprise total population of about 4.3
million by the year 2041 – these growth
areas are expected to witness continuous
and rapid development in residential,
commercial and industrial activities.
(ii) Map showing the required Essential map attached on Page No.
forest land, boundary of adjoining
forest on a 1:50,000 scale map
(iii) Cost of the project Total Cost of the Project Rs. 2150 Crores
(iv) Justification for locating the The Project of 99.00mtr wide alignment
project in forest area Cross the forest land, there is no alternative
non forest land available for this purpose.
So we have decided to take necessary
permission Under the provision of forest
(conservation) Act 1980, Hence this proposal
is submitted for necessary clearance.
(v) Cost-benefit analysis Not Applicable
(vi) Employment likely to be generated During Construction approximately 300
construction personals will work at site.
2 Purpose-wise break-up of the total Total Mangroves/forest land
land required Required = 16.00 ha
3 Details of displacement of people There is no displacement of the people due
due to the project, if any to this project in forest area.
(i) Number of Families Not Applicable
(ii) Number of Scheduled caste Tribe Not Applicable
families
(iii) Rehabilitation Plan (To be Not Applicable
enclosed)
4 Whether clearance from Not Applicable
Environment (Protection) Act,
1986 required? (yes/No)
5 Undertaking to bear the cost of Undertaking to bear the cost of
raising and maintenance of compensatory afforestation is enclosed on
compensatory forestation and/or page No.
penal compensatory forestation as
well as cost for protection and
regeneration of Safely Zone etc as
per the scheme prepared by the
State Government (undertaking to
be enclosed)
6 Details of Certificates / documents (1) Necessary Certificates and undertaking
enclosed as required under the (2) Brief note of the Project
instructions (3) 7/12 extract
(4) Village map
(5) Location Geo - Digital map
(6) Topo Sheet
Date: / /2019
Place: Bandra.
Information in From-A
Part- II

Filled up by
The Project Authority

The Deputy Conservator of forests,


Alibag Forest Division,
Raigad.
PART – II
(To be filled by the concerned Deputy Conservator of Forest)

7. Location of the Project/ Scheme Proposed Multi-modal Corridor Phase I: Section


II from Chirner (JNPT) To Balavali (NH17) for
Length 18.00km.
(i) State / Union Territory Maharashtra.
(ii) District Raigad
(iii)Forest Division Alibag Forest Division, Raigad.
(iv)Area of forest land proposed 16.00 Ha.
for Road (in ha)

Forest Land Required Legal Status


Sr. Name of
Taluka S./Gut Length & Area in of required
No. Village
No. Width SQ.M. HA. forest land
1 URAN DIGHODE 22 Irreguler 2313 0.2313 Mangroves
21 Shape 5309 0.5309 Mangroves
124c 2293 0.2293 Mangroves
2 URAN VINDHANE Na (River) Irreguler 9794.99 0.9795 Mangroves
Shape
173 4710.15 0.471 Mangroves
206a 5430.2 0.543 Mangroves
207a 10124.76 1.0125 Mangroves
124/A Pai 1124.92 0.1125 Mangroves

4 URAN CHIKHALI Water Irreguler 3937.23 0.3937 Mangroves


BHOM Body Shape
5 URAN BHOM 8 Irreguler 8309.35 0.8309 Mangroves
Shape
6 URAN CHIRNAR 200 Irreguler 20438 2.0438 Mangroves
199 Shape 10712 1.0712 Mangroves
185 544 0.0544 Mangroves
192 788 0.0788 Mangroves
176 2672 0.2672 Mangroves
Water Body 4099 0.4099 Mangroves

169 2332 0.2332 Mangroves


8 PANVEL DIGHATI 78 Irreguler 7367.63 0.7368 Reserve Forest
Shape
46 2703 0.2703 Mangroves
47 366 0.0366 Mangroves
37 A 4999 0.4999 Mangroves
Na (River) 5739 0.5739 Mangroves

9 PEN RAVE 44 Irreguler 541 0.0541 Mangroves


43 Shape 1307 0.1307 Mangroves
Na1 4484 0.4484 Mangroves
River 2238 0.2238 Mangroves
10 PEN MAJRE DADAR 223A/1A/1 Irreguler 9059.68 0.91 Mangroves
TO 5 Shape
11 PEN KOPAR NA Irreguler 2559 0.0251 Mangroves
River Shape 4869 0.4869 Mangroves
53 4814 0.4814 Mangroves
52 294 0.0294 Mangroves
49 86.47 0.0086 Mangroves
47 3044 0.3044 Mangroves
46 2974 0.2974 Mangroves
Nala 1243 0.1243 Mangroves
38 911 0.0911 Mangroves
15 PEN AMBIVLI 11 Irreguler 4830.39 0.48 Sec.4 (RF)
17 PEN SHITOLE 22 Shape 627 0.06 Sec.4 (RF)
Total 159988 16.00

v) Legal Status of Forest Mangroves Land


(vi) Density of Vegetation Area’s density is 0.01

(vii) Species-wise (scientific names) and No. of trees to be felled -


diameter class-wise enumeration of
trees (to be enclosed, in case of
irrigation / hydel projects enumeration
at FRI, FRI-2 meter & FRI-1 meter also to
be enclosed
(viii) Brief note on vulnerability / of the The land to be diverted is not vulnerable to
Forest area to erosion erosion
(ix) Approximate distance of proposed site Proposed site is following in the Village:
for diversion from boundary of forest Dighode Survey/Gut No.22, 21, 124c; Village:
Vindhane Survey/Gut No. Na (River), 173,
206a, 207a, 124/A Pai; Village: Chikhali Bhom
Survey/Gut No. Water Body ; Village: Bhom
Survey/Gut No. 8; Village: Chirnar Survey/Gut
No.200, 199, 185, 192, 176, Water Body, 169;
Taluka Uran; Village: Dighati Survey/Gut
No.78,46,47,37 A,Na (River); Taluka Panvel;
Village: Rave Survey/Gut No.44,43,Na1,River;
Village: Majre Dadar Survey/Gut
No.223a/1a/1 To 5; Village: Kopar Survey/Gut
No.Na,River,53,52, 49,47, 46,Nala, 38; Village:
Ambivli Survey/Gut No. 11; Village: Shitole
Survey/Gut No. 22 ; Taluka Pen; Dist Raigad.
(x) Whether forms part of national Park, No
wildlife Sanctuary biosphere reserve,
tiger reserve, tiger reserve, elephant,
corridor etc (If so the details of the area
and comments of the Chief Wildlife
Warden to be annexed)

(xi) Whether any rare / endangered / No rare / endangered / unique species of flora
unique species of flora and fauna & fauna found in the area.
founding the area of so details thereof
(xii) Whether any protected archaeological / There is no protected archaeological /
heritage site / defiance establishment heritage site/ defense establishment or any
or any other important monument is other important monument is located in the
located in the area If so, the details area, which is to be diverted.
thereof with NOC from competent
authority, if required
8. Whether the requirement of forest land Yes, required land is unavoidable and barest
as proposed by the user agency in col2 minimum.
of Part-I is unavoidable and basic
minimum for the project If no,
recommended area item-wise with
details of alternatives examined
9. Whether any work in violation of Act has No
been carried out (Yes/No) If Yes, details
of the same including period of work
done, action taken on carrying officials
Whether work in violation is still in
progress
10. Details of compensatory afforestation A compensatory afforestation scheme is
scheme: enclosed on Page No.

(i) Details of non forest area / Not applicable.


degraded forest area identified for
compensatory afforestation, its distance
from adjoining forest, number of
patches, size of each patch
(ii) Map Showing non-forest/ Not applicable.
degraded forest area identified for
compensatory afforestation and
adjoining forest boundaries
(iii) Detailed compensatory Scheme attached on Page No
afforestation scheme including species
to be planned, implementing agency
Tune schedule, cost structure etc

(iv) Total Financial outlay for As detailed on Page No


compensatory afforestation scheme
(v) Certificates from competent Not applicable.
authority regarding suitability of area
identified for compensatory
afforestation and from management of
point of view (To be signed by the
concerned Deputy Conservator of
Forest)
11. Site inspection report of the DCF (to be Attached on Page No
enclosed) especially high ting facts asked
in col 7 (xi,xii) 8 & 9 above
12. Division / District Profile District – Raigad
Division – Alibag Forest Division
i) Geographical area of the district Raigad Dist – 7152 Sq. KM.

ii) Forest area of the district Raigad Dist – 1169.1647 Sq. KM

iii) Total forest area devoted since 1980 No. 74 cases – Area diverted 920. Ha.
with number of cases
iv) Total Compensatory afforestation
stipulated in the district division since
1980 on-
a) forest land including penal 2005.826Ha, On forest land.
Compensatory afforestation
b) Non Forest Land 367.464 Ha. On non-forest land
v) Progress of Compensatory 2373.290 Ha.
afforestation as on-
(a) Forest Land
(b) Non- Forest Land 2005.826Ha, on forest land.
367.464 Ha. On non-forest land
2373.290 Ha.
13 Specific recommendations of the deputy The project under reference undertaken by
conservator of forest for acceptance or Government of Maharashtra (MMRDA) is
otherwise of the proposal with reasons part of public infrastructure facility and
essential for convenient, fast & safe travel.
Hence, the proposal is being recommended.
Date: - / /2019
Place:- Alibag.

(Maneesh Kumar)
Deputy Conservator of Forests,
Alibag Forest Division,
Raigad.
PART – III
(To be filled up by the concerned Chief Conservator of Forests)
1 Whether site, where the
forestland involved is located has
been inspected by concerned
Chief Conservator of Forests (Yes
/ No) If yes, the date of inspection
and observations made in form of
inspection note to be enclosed.

2 Whether the Chief Conservator of


Forests agree with the
information given in Part-II and
the recommendations of
the Deputy Conservator of
Forests.
3 Specific recommendations of the
concerned Chief Conservator of
Forests for acceptance or
otherwise of the proposal with
detailed reasons.

Chief Conservator of Forests,


Thane
PART-IV

(To be filled up by the Nodal Officer or Principal Chief Conservator of Forests or


Head of the Forest Department)

1 Detailed opinion and specific recommendations of the State Forest Department


for acceptance or otherwise of the proposal with detailed reasons.
PART – V

(To be filled in by the Secretary in charge of the Forest Department or any


other authorized officer of the State Government not below the rank of
Under Secretary)

1 Recommendations of the State Government


AREA STATEMENT
Item-wise Breakup of the Land
ALIBAG FOREST DIVISION
(Under Forest Conservation Act, 1980)
Abstract of Item-wise Breakup of the Land
Required Area Statement of Mangroves and Non-Forest Land
Forest Land Required Required Non-Forest Land
Sr. Legal Status Total Area
No Taluka Name of Village Length Area in of required Area in (7+12) in
S./Gut S./Gut Length
. & forest land SQ.M.
No. SQ.M. HA. No. & Width SQ.M. HA.
Width
1 2 3 4 5 6 7 8 9 10 11 12 13
1 URAN DIGHODE 22 Irregule 2313 0.2313 Mangroves 22 Irreguler 10031.26 1.00 1.23
21 r Shape 5309 0.5309 Mangroves 21 Shape 2093.58 0.21 0.74
124c 2293 0.2293 Mangroves - - 0.00 0.23
- - 0 - 117 9860.56 0.99 0.99
2 URAN VINDHANE Na (River) Irregule 9794.99 0.9795 Mangroves Na Irreguler 13754.88 1.38 2.35
r Shape (River) Shape
- - - - 206C 13545.7 1.35 1.35
- - - - 206B 11608.19 1.16 1.16
173 4710.15 0.471 Mangroves - - - 0.47
206a 5430.2 0.543 Mangroves 206A 1598.1 0.16 0.70
207a 10124.7 1.0125 Mangroves - - - 1.01
6
- - - - 181 67 0.01 0.01
- - - - 183 9121.06 0.91 0.91
124/A Pai 1124.92 0.1125 Mangroves 124/A 423 0.04 0.15
Pai
- - - - 207B 1829 0.18 0.18
- - - - 184 1578.4 0.16 0.16
- - - - - 31 247 0.02 0.02
- - - - - 33 3566.13 0.36 0.36
- - - - - RAILWAY 680.41 0.07 0.07
- - - - - 32 11.26 0.00 0.00
- - - - - 34 11959.56 1.20 1.20
- - - - - 35 4625.78 0.46 0.46
- - - - - 236 7517.05 0.75 0.75
- - - - - 250 8209.75 0.82 0.82
- - - - - 238 11528.19 1.15 1.15
- - - - - 237 350.65 0.04 0.04
- - - - - 239 7548.81 0.75 0.75
3 URAN HARISHCHANDR - - - - - 16 Irreguler 14224 1.42 1.42
A PIMPLE Shape
- - - - - 29 14562.88 1.46 1.46
- - - - - 28 5489.69 0.55 0.55
- - - - - 30 2693.97 0.27 0.27
- - - - - 26 13582.21 1.36 1.36
- - - - - 25 9365.27 0.94 0.94
- - - - - 31 123 0.01 0.01
32 7414.4 0.74 0.74
- - - - - 45 4990.91 0.50 0.50
- - - - - 44 2361.08 0.24 0.24
- - - - - 41 722.51 0.07 0.07
51 1478 0.15 0.15
- - - - - ROAD 5341.1 0.53 0.53
- - - - - 33 15258.12 1.53 1.53
- - - - - 34 8158.21 0.82 0.82
4 URAN CHIKHALI BHOM - - - - - 8 Irreguler 14494.53 1.45 1.45
- - - - - 9 Shape 73.52 0.01 0.01
- - - - - 11 17963.41 1.80 1.80
- - - - - 12 3241.63 0.32 0.32
- - - - - 13 1913.81 0.19 0.19
- - - - - 14 10359.22 1.04 1.04
- - - - - 15 5719.97 0.57 0.57
Water Irregule 3937.23 0.3937 Mangroves - - - 0.39
Body r Shape
- - - - - 2 7182.65 0.72 0.72
- - - - - 1 15755.79 1.58 1.58
WATER 4538.88 0.45 0.45
- - - - -
B.
5 URAN BHOM - - - - - 21 Irreguler 279.05 0.03 0.03
8 Irregule 8309.35 0.8309 Mangroves Shape - - 0.83
r Shape
WATER 3058.88 0.31 0.31
- - - - -
B.
6 URAN CHIRNAR Irregule WATER Irreguler 6104.69 0.61 0.61
- - - -
r Shape B. Shape
200 20438 2.0438 Mangroves - - - 2.04
199 10712 1.0712 Mangroves - - - 1.07
- - - - 195 8895.84 0.89 0.89
- - - - 196 8712.63 0.87 0.87
- - - - 193 2481.7 0.25 0.25
- - - - 190 3830.01 0.38 0.38
- - - - 191 11413 1.14 1.14
- - - - 186 9714.07 0.97 0.97
185 544 0.0544 Mangroves 185 7568 0.76 0.76
192 788 0.0788 Mangroves 192 63 0.01 0.01
176 2672 0.2672 Mangroves - - - 0.27
Water 4099 0.4099 Mangroves - - - 0.41
Body
169 2332 0.2332 Mangroves - - - 0.23
- - - - - 168 8273.12 0.83 0.83
- - - - - 170 3004.79 0.30 0.30
- - - - - 167 7531.97 0.75 0.75
- - - - - 165 10854.32 1.09 1.09
- - - - - 164 18117.03 1.81 1.81
- - - - - 158 1004.2 0.10 0.10
- - - - - 157 17742.31 1.77 1.77
7 URAN KALAMBSURE - - - - - 51 Irreguler 2145.21 0.21 0.21
- - - - - 56 Shape 15011.74 1.50 1.50
- - - - - 52 261.97 0.03 0.03
- - - - - 55 3107.43 0.31 0.31
- - - - - 54 11057.84 1.11 1.11
- - - - - 53 4328.56 0.43 0.43
- - - - - 66 4519.75 0.45 0.45
- - - - - 47 10944.05 1.09 1.09
- - - - - 152 1178.44 0.12 0.12
- - - - - 73 33151.09 3.32 3.32
- - - - - 72 880.62 0.09 0.09
- - - - - 74 38643.55 3.86 3.86
- - - - - 103 287.07 0.03 0.03
- - - - - 99 11862.93 1.19 1.19
- - - - - 95 9505.56 0.95 0.95
- - - - - 94 11134.73 1.11 1.11
- - - - - 83 22471.44 2.25 2.25
- - - - - 93 17163.38 1.72 1.72
- - - - - 84 2015.57 0.20 0.20
- - - - - 92 840.08 0.08 0.08
- - - - - 90 6716.25 0.67 0.67
- - - - - 91 42593.44 4.26 4.26
8 PANVEL DIGHATI 78 Irregule 7367.63 0.7368 Reserve - Irreguler - - 0.74
r Shape Forest Shape
- - - - - 69 1339.96 0.13 0.13
- - - - - 70 63309.1 6.33 6.33
- - - - - 68 5557.46 0.56 0.56
- - - - - NA 15059.7 1.51 1.51
- - - - - 65 517.73 0.05 0.05
- - - - - 66 876.89 0.09 0.09
- - - - - 61 3487.04 0.35 0.35
- - - - - 60 4401.89 0.44 0.44
- - - - - 59 6937.87 0.69 0.69
- - - - - 58 8912.8 0.89 0.89
- - - - - 52 7146.29 0.71 0.71
- - - - - 51 14338.16 1.43 1.43
- - - - - 43 3611.04 0.36 0.36
- - - - - 44 13057.95 1.31 1.31
- - - - - 45 9864.42 0.99 0.99
46 2703 0.2703 Mangroves 46 8163 0.82 0.82
47 366 0.0366 Mangroves 47 3873 0.39 0.39
37 A 4999 0.4999 Mangroves - - - 0.50
Na (River) 5739 0.5739 Mangroves - - - 0.57

9 PEN RAVE - - - - - 223B Irreguler 2368.14 0.24 0.24


- - - - - 174 Shape 19707.78 1.97 1.97
- - - - - 173 12563.47 1.26 1.26
- - - - - 175 458.02 0.05 0.05
- - - - - 178 243.18 0.02 0.02
- - - - - 179 10240.33 1.02 1.02
- - - - - 180 5795.07 0.58 0.58
- - - - - 181 11629.48 1.16 1.16
- - - - - 182 14564.48 1.46 1.46
- - - - - 183 4075.71 0.41 0.41
- - - - - 186 2452.2 0.25 0.25
- - - - - 185 9848.33 0.98 0.98
- - - - - 187 3604.71 0.36 0.36
- - - - - 191 4663.37 0.47 0.47
- - - - - 190 3460.56 0.35 0.35
- - - - - River 1189 0.12 0.12
- - - - - 141 13269.73 1.33 1.33
- - - - - 142 17453.9 1.75 1.75
- - - - - 143 1651.18 0.17 0.17
- - - - - 212 12743.6 1.27 1.27
- - - - - 144 12030.8 1.20 1.20
- - - - - 148 1463.32 0.15 0.15
- - - - - 147 9139.84 0.91 0.91
- - - - - 146 10560.71 1.06 1.06
- - - - - 122 14151.25 1.42 1.42
- - - - - 121 15805.82 1.58 1.58
- - - - - 213 1116.49 0.11 0.11
- - - - - 120 10057.65 1.01 1.01
- - - - - 40/A/1 11624.54 1.16 1.16
- - - - - 45 1289.27 0.13 0.13
44 Irregule 541 0.0541 Mangroves 44 3129 0.31 0.31
43 r Shape 1307 0.1307 Mangroves 43 2759 0.28 0.28
Na1 4484 0.4484 Mangroves Na1 1236 0.12 0.12
- - - - - 42 2608.14 0.26 0.26
- - - - - NA 551.56 0.06 0.06
River 2238 0.2238 Mangroves - - - 0.22
10 PEN MAJRE DADAR 223A/1A/ Irregule 9059.68 0.91 Mangroves - - - 0.91
1 TO 5 r Shape
11 PEN KOPAR NA Irregule 2559 0.0251 Mangroves NA Irreguler 258.53 0.03 0.05
River r Shape 4869 0.4869 Mangroves NA1 Shape 4888.1 0.49 0.98
53 4814 0.4814 Mangroves 53 7901.06 0.79 1.27
52 294 0.0294 Mangroves - - - 0.03
- - - - 51 2887.56 0.29 0.30
- - - - 59 2755.57 0.28 0.30
49 86.47 0.0086 Mangroves 49 13242.05 1.32 1.63
47 3044 0.3044 Mangroves 47 2186 0.2186 0.523
46 2974 0.2974 Mangroves 46 3678 0.37 0.67
Nala 1243 0.1243 Mangroves Nala 1012 0.10 0.23
38 911 0.0911 Mangroves 38 1830 0.18 0.27
- - - - - 45 4445.21 0.44 0.44
- - - - - NA2 1885.48 0.19 0.19
- - - - - NA3 94.61 0.01 0.01
- - - - - 44 1860.24 0.19 0.19
- - - - - 39 498.25 0.05 0.05
- - - - - 40 5212.73 0.52 0.52
- - - - - 41 14037.68 1.40 1.40
- - - - - 42 2525.87 0.25 0.25
- - - - - 10 16317.46 1.63 1.63
- - - - - 90 85.61 0.01 0.01
- - - - - Nala 581.1 0.06 0.06
- - - - - 12 167.19 0.02 0.02
- - - - - 11 6475.36 0.65 0.65
- - - - - 7 27396.49 2.74 2.74
- - - - - Road 6746.26 0.67 0.67
- - - - - NA 1986 0.20 0.20
- - - - - 5 31541.19 3.15 3.15
- - - - - 80 Irreguler 791.38 0.08 0.08
- - - - - 81 Shape 3443.86 0.34 0.34
- - - - - 82 12989.15 1.30 1.30
12 PEN KASBE - - - - - 77 Irreguler 9539.71 0.95 0.95
HAMRAPUR - - - - - 78 Shape 45449.67 4.54 4.54
- - - - - 115 8608.55 0.86 0.86
- - - - - 116 2271.68 0.23 0.23
- - - - - Road 5526 0.55 0.55
13 PEN GOVIRLE - - - - - 7 Irreguler 13333.93 1.33 1.33
- - - - - 6 Shape 15770.04 1.58 1.58
- - - - - 5 2264.89 0.23 0.23
- - - - - 4 905.08 0.09 0.09
- - - - - 3 225.43 0.02 0.02
- - - - - 2 14898.58 1.49 1.49
14 PEN JITE - - - - - 71 Irreguler 3757.72 0.38 0.38
- - - - - 72 Shape 3880.29 0.39 0.39
- - - - - 73 3382.1 0.34 0.34
- - - - - 69 2548.69 0.25 0.25
- - - - - 68 1738.77 0.17 0.17
- - - - - NA 8017.58 0.80 0.80
- - - - - 74 775.77 0.08 0.08
15 PEN AMBIVLI - - - - - 60 Irreguler 260.4 0.03 0.03
- - - - - 59 Shape 3274.96 0.33 0.33
- - - - - NA 4117.39 0.41 0.41
- - - - - NA1 1948.26 0.19 0.19
- - - - - 62 665.41 0.07 0.07
- - - - - 61 417.26 0.04 0.04
- - - - - 58 290.32 0.03 0.03
- - - - - NA2 1966.98 0.20 0.20
- - - - - 55 843.14 0.08 0.08
- - - - - 54 993.24 0.10 0.10
- - - - - 53 542.15 0.05 0.05
- - - - - 18 1150.19 0.12 0.12
- - - - - 41 394.45 0.04 0.04
- - - - - 44 70.12 0.01 0.01
- - - - - 45 1679.71 0.17 0.17
- - - - - 46 46.32 0.00 0.00
- - - - - 47 2893.25 0.29 0.29
- - - - - 50 112.56 0.01 0.01
- - - - - 49 1270.71 0.13 0.13
- - - - - 80 674.02 0.07 0.07
- - - - - 37 553.28 0.06 0.06
- - - - - 82 2193.61 0.22 0.22
- - - - - 68 15.64 0.00 0.00
- - - - - 71 1795.74 0.18 0.18
- - - - - 72 871.22 0.09 0.09
- - - - - 73 3097.82 0.31 0.31
- - - - - 86 1666.21 0.17 0.17
- - - - - 87 3209.75 0.32 0.32
- - - - - 88 1516.08 0.15 0.15
- - - - - 89 3106.27 0.31 0.31
- - - - - 85 3465.48 0.35 0.35
- - - - - 77 1821.88 0.18 0.18
- - - - - 79/2 6641.88 0.66 0.66
- - - - - 79/3 5395.08 0.54 0.54
- - - - - 90 6082.51 0.61 0.61
- - - - - 91 3566.99 0.36 0.36
- - - - - 83 9770.04 0.98 0.98
- - - - - 94 158.37 0.02 0.02
- - - - - 96 724.72 0.07 0.07
- - - - - 34 10175.87 1.02 1.02
- - - - - 35A 6417.06 0.64 0.64
- - - - - 35B 3475.15 0.35 0.35
- - - - - NA3 344.02 0.03 0.03
- - - - - 100 827.34 0.08 0.08
- - - - - 22 21909.65 2.19 2.19
- - - - - 127 14.73 0.00 0.00
- - - - - 20 648.99 0.06 0.06
- - - - - 23 3553.64 0.36 0.36
- - - - - 24 3658.15 0.37 0.37
- - - - - 14 63660.42 6.37 6.37
11 - 4830.39 0.48 Sec.4 (RF) - - - 0.48
16 PEN BALAVLI - - - - - NA Irreguler 20160.22 2.02 2.02
- - - - - 105 Shape 1052.96 0.11 0.11
- - - - - Tata Line 1234.44 0.12 0.12
- - - - - 106 1012.17 0.10 0.10
- - - - - 82B 264.21 0.03 0.03
- - - - - 43 196.67 0.02 0.02
- - - - - 44 1627.71 0.16 0.16
- - - - - 42 1344.95 0.13 0.13
- - - - - 41 169.4 0.02 0.02
- - - - - 39 2998.83 0.30 0.30
- - - - - 36 110.67 0.01 0.01
- - - - - 37 945.89 0.09 0.09
- - - - - 38 132.36 0.01 0.01
- - - - - 21 2555.81 0.26 0.26
- - - - - 22 355.3 0.04 0.04
- - - - - 17 152.65 0.02 0.02
- - - - - 13 2751.82 0.28 0.28
- - - - - 14 1002.67 0.10 0.10
- - - - - 1 2415.9 0.24 0.24
- - - - - 2 1136.9 0.11 0.11
- - - - - 98 1543.47 0.15 0.15
- - - - - 96 333.13 0.03 0.03
95 322.44 0.03 0.03
- - - - -
NA2 426.09 0.04 0.04
- - - - -
102 252.16 0.03 0.03
- - - - -
NA3 694.53 0.07 0.07
- - - - -

- - - - - 8 852.96 0.09 0.09

7 2583.52 0.26 0.26


- - - - -

- - - - - 6 10078.68 1.01 1.01

- - - - - 5 1059.3 0.11 0.11

4 6953.57 0.70 0.70


- - - - -
3 202.2 0.02 0.02
- - - - -

- - - - - 82D 67.25 0.01 0.01

- - - - - 97 1710.59 0.17 0.17


17 PEN SHITOLE - - - - - 1 Irreguler 36903.9 3.69 3.69
Shape
- - - - - 18 14083 1.41 1.41
- - - - - 5 12634.91 1.26 1.26

- - - - - 20 5948.27 0.59 0.59

- - - - - Nala 4224.03 0.42 0.42

- - - - - LAKE 2368 0.24 0.24

22 627 0.06 Sec.4 (RF) - - - 0.06

- - - - - 6 10155.54 1.02 1.02


- - - - - 5 5357.74 0.54 0.54
Total 159988 16.00 1794133 179.41 195.41
Date: / /2019
Place: Bandra.
PROJECT NOTE
By the Project Authority

Name of the Project: Proposed Multi-modal Corridor Phase I: Section II


from Chirner (JNPT) To Balavali (NH17) for Length 18.00 km.

1.0 GENERAL
1.1 With the growth of urban centre and the economic activities around the focal
points, the demand for inter-urban transportation has been increasing steadily
in India. To cope with this ever increasing demand and to decongest the
internal roads Mumbai Metropolitan Region Development Authority (MMRDA)
has undertaken development of Multi Modal Corridor 4 Lane Divided
Carriageway comprising High Capacity BRTS Lanes, Heavy & Light Traffic Lanes
and Metro Rail at Centre along with Service Road and Utility Corridor Laning
on either sides for safe, economic and fast travel.

1.2 Considering the ever increasing traffic demand on major link roads This link is
beneficial for exchange of traffic from one highway to another highway by
diverting major heavy traffic from North India out of Main Thane and Navi
Mumbai to JNPT.
As it acts as North-South Corridor from Virar to Alibag in Maharashtra, easily
connecting Major JNPT Port, Nava Sheva Port, Pune and Goa and thereby
South Mumbai via MTHL. It also help in connecting states Karnataka, Kerla,
Tamilnadu in South and Gujrat, Rajsthan etc. through interconnecting National
Highway such as NH8, NH4, NH4B, NH17, Mumbai Pune Expressway and
Proposed Mumbai Vadodara Expressway.
2.0 DESIGN STANDARDS

2.1 The following standards for some major design elements of the proposed
road, generally conforming to the internationally accepted standards for
highway on similar terrain and traffic conditions were recommended by
Consultants and were accepted by the Mumbai Metropolitan Region
Development Authority.

2.2. Roads
Proposed Multi-modal Corridor Phase I: Section II from Chirner (JNPT) To
Balavali (NH17) for Length 18.00 km. are provided in Table 2.1
Table 2.1 Improvement Proposals

Sr. No. Design Elements Proposed Features


1 Design speed 100-120 Km/h

2 Right of way (m) As per ROW – 99.00 mtr.

3 Carriageway width 4 x 3.75

4 Paved Shoulder (m) 3.0m

5 Earthen Shoulder (m) -

6 Edge Strip (m) 0.75 m.

7 Median (m) 26.50m.

8 Lane width 3.75 m.

9 Longitudinal Gradient (%) 1:33 min.


Ruling 1 : 30
Absolute 1 : 20
Minimum 1 : 12
Cambers
10 Û Flexible Pavement 2.5%
Û Rigid Pavement 2.0%
11 Length of Service roads -

12 Bus Bays 8 Nos.


B. Bridge and Culverts

The numbers of Bridges/Flyovers/CD structures proposed for the project is


presented in the table -2.2

Table 2.2 Proposed Bridges, Flyovers & CD structures

Sr. No. Structures Nos.


1 No. of Major bridges 5Nos.
2 No. of Minor bridges 03Nos.
3 Flyover/ROB 07Nos.
4 Vehicular underpass 02 Nos.
5 Pedestrian underpass Nil
6 Cattle/underpass Nil
7 Tunnels 760 mtr. 7 Nos.
8 Foot Over Bridges Nil
9 Box Culverts 07 Nos.
(Widening/rehabilitation)

Road Alignment
The Proposed road under consideration starts at Ch: 80+000 Km on Chirle near
JNPT and ends at NH17 – Panvel Goa National Highway at Balavali Ch: 98+00Km
measuring of 18.00 Km in Raigad District in Maharashtra State.

2.3 Proposed ROW


In general, Right of way (ROW) of 99.00mtr is required for the 19.75 m wide Main
Carriageways; 7.50 m Wide Service Road, 6.5m Wide Utility Corridor and 2.50 m
Strom Water Drain Cum Tree Belt on both sides and metro 26.50 m wide Metro
Rail Corridor at Centre.
2.4 Lane Configuration

Based on the traffic survey, analysis and forest the 4 lane configuration is sufficient
to cater to the traffic up to year 2040.
2.6 Financial Details

 The capital cost of the project 2150 Crores


 Construction period 36 Months

Date: / /2019
Place: Bandra.
NecessaryCertificates
As per the guideline issued by the Chief Conservator of
Forests: Nodal Officer,:MS,:Nagpur's fetter
: No Desk; 17/: NC/CRJ/571, dated 2nd July, 2005
Required Certificates for the proposal, as per the guideline issued by
the Chief Conservator of Forests & Nodal Officer, MS, Nagpur's letter
No Desk- 17/NC/RS/571, dated 2nd July, 2005
Certificate No. 3
Documents verification certificate- By the Deputy Conservator of Forest,
Alibag Forest Division, Alibag

Certified that all the documents enclosed here with the proposal have been
scrutinized as per the revised check list and found to be correct.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 4
Certificate of Dy. Conservator of Forest for absences of alternative about the Project
and minimum demand of forest area.

Certify that no suitable alternative non-forest land is available other than forest
use purpose i.e. for Proposed Multi-modal Corridor Phase I: Section II from Chirner
(JNPT) To Balavali (NH17) for Length 18.00km. Project for Village: Dighode Survey/Gut
No.22, 21, 124c; Village: Vindhane Survey/Gut No. Na (River), 173, 206a, 207a, 124/A
Pai; Village: Chikhali Bhom Survey/Gut No. Water Body ; Village: Bhom Survey/Gut No.
8; Village: Chirnar Survey/Gut No.200, 199, 185, 192, 176, Water Body, 169; Taluka
Uran; Village: Dighati Survey/Gut No.78,46,47,37 A,Na (River); Taluka Panvel; Village:
Rave Survey/Gut No.44,43,Na1,River; Village: Majre Dadar Survey/Gut No.223a/1a/1
To 5; Village: Kopar Survey/Gut No.Na,River,53,52, 49,47, 46,Nala, 38; Village: Ambivli
Survey/Gut No. 11; Village: Shitole Survey/Gut No. 22 ; Taluka Pen; Dist Raigad
demand for the forest land is a minimum.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No.5
Certificate by the Deputy Conservator of Forests that no violation done of the FCA-
1980 and their guideline.

It is state that the proposed work is not started yet it will be started
only after the Government of India gives permission However, no violation is
done of the Forest (Conservation) Act, 1980or its guidelines.
It is also state that, the Project Authority, is aware of the fact that,
such Forest Lands have come under purview of the provisions of the Forest
(Conservation) Act.1980, making it incumbent on the State Government under
the provisions of the said Act Hence; this proposal is being submitted for
necessary clearance.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No.6
Suitability Certificate of forest that forest and Non-forest land is suitable for
raising tree species by the Deputy Conservator of Forests, Alibag Forest
Division, Alibag
Not applicable

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 7
Certificate of identified Forest and Acquired Forest for compensatory
afforestation area the Deputy Conservator of Forests,
Alibag Forest Division, Alibag·
Proposed forest land is 16.00 ha

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 8
Certificate of Identified forest and acquired forest for Non Forest area under
the Project by Deputy Conservator of Forests, Alibag Forest Division, Alibag
This is certify that, following non forest covered under the project is not
under the provision of Maharashtra Private forest (Acquisition) Act, 1975 by virtue of
application of section 35 of Indian Forest Act, 1972 & is not recognized as deemed
reserve forest as well as not include in the area identified as “Forest” as per the
dictionary meaning of forest as intimated to the expert committee under interim
judgment of Hon’ble Supreme Court dated 12/1/1996.
SR. NAME OF
TALUKA LIST OF GUT NO.
NO. VILLAGE
01 DIGHODE URAN 22, 21, 117

02 VINDHANE NA (River), 206C, 206B, 206A, 181, 183, 124/A Pai, 207B, 184,
URAN
31, 33, RAILWAY, 32, 34, 35, 236, 250, 238, 237, 239
03 HARISHCHANDRA URAN
16, 29, 28, 30, 26, 25, 31, 32, 45, 44, 41, 51, ROAD, 33, 34
PIMPLE
04 CHIKHALI BHOM URAN
8, 9, 11, 12, 13, 14, 15, 2, 1, WATER B

05 BHOM URAN 21, WATER B

06 CHIRNAR URAN WATER, 195, 196, 193, 190, 191, 186, 185, 192, 168, 170, 167, 165,
164, 158, 157
07 KALAMBSURE URAN 51, 56, 52, 55, 54, 53, 66, 47, 152, 73, 72, 74, 103, 99, 95, 94, 83, 93,
84, 92, 90, 91
08 DIGHATI PANVEL 69, 70, 68, NA, 65, 66, 61, 60, 59, 58, 52, 51, 43, 44, 45, 46, 47

09 RAVE PEN 223B, 174, 173, 175, 178, 179, 180, 181, 182, 183, 186, 185, 187,
191, 190, River, 141, 142, 143, 212, 144, 148, 147, 146, 122, 121,
213, 120, 40/A/1, 45, 44, 43, Na1, 42, NA
10 MAJRE DADAR PEN -

11 KOPAR PEN NA, NA1, 53, 51, 59, 49, 47, 46, Nala, 38, 45, NA2, NA3, 44, 39, 40,
41, 42, 10, 90, Nala, 12, 11, 7, Road, NA, 5, 80, 81, 82
12 KASBE PEN 77, 78, 115, 116, ROAD
HAMRAPUR
13 GOVIRLE PEN 7, 6, 5, 4, 3, 2
14 JITE PEN 71, 72, 73 ,69, 68, NA, 74

15 AMBIVLI PEN 60, 59, NA, NA1, 62, 61, 58, NA2, 55, 54,53, 18, 41, 44, 45, 46, 47,
50, 49, 80, 37, 82, 68, 71, 72, 73, 86, 87, 88, 89, 85, 77, 79/2, 79/3,
90, 91, 83, 94, 96, 34, 35A, 35B, NA3, 100, 22, 127, 20, 23, 24, 14
16 BALAVLI PEN NA, 105, Tata Line, 106, 82B, 43, 44, 42, 41, 39, 36, 37, 38, 21, 22,
17, 13, 14, 1, 2, 98, 96, 95, NA2, 102, NA3, 8, 7, 6, 5, 4, 3, 82D, 97
17 SHITOLE PEN 1, 18, 5, 20, NALA, LAKE, 6, 5

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No.9
Certificate by the Deputy Conservator of Forests the proposed project likely to affect
any monument site of cultural, Historical, Religious, Archaeological or recreational
importance.
This is to certify that, proposed work purpose i.e. for Proposed Multi-modal
Corridor Phase I: Section II from Chirner (JNPT) To Balavali (NH17) for Length 18.00km.
for Village: Dighode Survey/Gut No.22, 21, 124c; Village: Vindhane Survey/Gut No. Na
(River), 173, 206a, 207a, 124/A Pai; Village: Chikhali Bhom Survey/Gut No. Water Body
; Village: Bhom Survey/Gut No. 8; Village: Chirnar Survey/Gut No.200, 199, 185, 192,
176, Water Body, 169; Taluka Uran; Village: Dighati Survey/Gut No.78,46,47,37 A,Na
(River); Taluka Panvel; Village: Rave Survey/Gut No.44,43,Na1,River; Village: Majre
Dadar Survey/Gut No.223a/1a/1 To 5; Village: Kopar Survey/Gut No.Na,River,53,52,
49,47, 46,Nala, 38; Village: Ambivli Survey/Gut No. 11; Village: Shitole Survey/Gut No.
22 ; Taluka Pen; Dist Raigad is not likely to affect any monument site of cultural,
historical, religious, archaeological or recreational importance.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 10
Wildlife certificate-Deputy Conservator of Forests, Alibag Forest Division, Alibag
Certificate
This is to certify that, proposed work purpose i.e. for Proposed Multi-modal
Corridor Phase I: Section II from Chirner (JNPT) To Balavali (NH17) for Length 18.00km.
For Village: Dighode Survey/Gut No.22, 21, 124c; Village: Vindhane Survey/Gut No. Na
(River), 173, 206a, 207a, 124/A Pai; Village: Chikhali Bhom Survey/Gut No. Water Body
; Village: Bhom Survey/Gut No. 8; Village: Chirnar Survey/Gut No.200, 199, 185, 192,
176, Water Body, 169; Taluka Uran; Village: Dighati Survey/Gut No.78,46,47,37 A,Na
(River); Taluka Panvel; Village: Rave Survey/Gut No.44,43,Na1,River; Village: Majre
Dadar Survey/Gut No.223a/1a/1 To 5; Village: Kopar Survey/Gut No.Na,River,53,52,
49,47, 46,Nala, 38; Village: Ambivli Survey/Gut No. 11; Village: Shitole Survey/Gut No.
22 ; Taluka Pen; Dist Raigad is not included in the area of any National Park Wild Life
Sanctuary or Nature Reserve.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 11
Net Present Value-Conservator of Forests, Alibag Forest Division, Alibag
Certificate

Certify that 16.00 ha of forest land to be used in this purpose i.e. for Proposed
Multi-modal Corridor Phase I: Section II from Chirner (JNPT) To Balavali (NH17) for
Length 18.00km. Project in Village: Dighode Survey/Gut No.22, 21, 124c; Village:
Vindhane Survey/Gut No. Na (River), 173, 206a, 207a, 124/A Pai; Village: Chikhali
Bhom Survey/Gut No. Water Body ; Village: Bhom Survey/Gut No. 8; Village: Chirnar
Survey/Gut No.200, 199, 185, 192, 176, Water Body, 169; Taluka Uran; Village: Dighati
Survey/Gut No.78,46,47,37 A,Na (River); Taluka Panvel; Village: Rave Survey/Gut
No.44,43,Na1,River; Village: Majre Dadar Survey/Gut No.223a/1a/1 To 5; Village:
Kopar Survey/Gut No.Na,River,53,52, 49,47, 46,Nala, 38; Village: Ambivli Survey/Gut
No. 11; Village: Shitole Survey/Gut No. 22 ; Taluka Pen; Dist Raigad.
The density is 0.01, Eco class-III, category–open forest and value is Rs. 6,26,000/
ha.
The amount of Net Present Value of 16.00 ha. Forest land is Rs. 1,00,16,000/-
(Rs. One Crore, Sixteen Thousand only) is exactly as per the rates and calculation
provided in the Govt. Resolution No. FLD-1002/CR/199/F-10 dated 19/12/2003 of
Govt. of Maharashtra.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 12
No cutting and felling of trees certificate of Deputy
Conservator of Forests, Alibag Forest Division, Alibag

This is to certify that, there are total no. of mangroves trees are proposed
to be cut in the forest land of village Dighode( Nos.), Village Vindhane( Nos.),
Chikhali Bhom( Nos.), Village Bhom( Nos.), Village Chirnar( Nos.), Tal. Uran;
Village Dighati( Nos.), Tal. Panvel; Village Rave ( Nos.), Village Majre Dadar(
Nos.), Village Kopar ( Nos.), Village Ambivli( Nos.), Village Shitole( Nos.), Tal.
Pen; After receiving due permission from the Central government.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 13
Certificate about distance of Project from Protected area by Deputy Conservator of
Forest, Alibag forest division, Alibag.
This is to certify that, “Karnala Bird Sanctuary” is at a distance of 4.800 km from
nearest forest area, which is proposed for diversion. Details are shown in the map at
page no

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 14
Certificate of Dy. Conservator of Forests - Regarding alternative examined for liner
project

Certify that no suitable alternative non-forest land is available other than


forest use purpose i.e. for Proposed Multi-modal Corridor Phase I: Section II from
Chirner (JNPT) To Balavali (NH17) for Length 18.00km. Project for Village: Dighode
Survey/Gut No.22, 21, 124c; Village: Vindhane Survey/Gut No. Na (River), 173, 206a,
207a, 124/A Pai; Village: Chikhali Bhom Survey/Gut No. Water Body ; Village: Bhom
Survey/Gut No. 8; Village: Chirnar Survey/Gut No.200, 199, 185, 192, 176, Water
Body, 169; Taluka Uran; Village: Dighati Survey/Gut No.78,46,47,37 A,Na (River);
Taluka Panvel; Village: Rave Survey/Gut No.44,43,Na1,River; Village: Majre Dadar
Survey/Gut No.223a/1a/1 To 5; Village: Kopar Survey/Gut No.Na,River,53,52, 49,47,
46,Nala, 38; Village: Ambivli Survey/Gut No. 11; Village: Shitole Survey/Gut No. 22 ;
Taluka Pen; Dist Raigad.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 15
Certificate by the Deputy Conservator of Forest Whether required Annexure and
the particulars to the proposal furnished in English?
Required all annexure and particulars pertaining to the project are furnished
in English.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 16
Certificate of Zudpi Jungle compensatory afforestation Land-Deputy
Conservator of Forests, Alibag

Not applicable

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Site Inspection
Report
Certificate No. 17
Site Inspection Report from Deputy Conservator of Forests

Sr.
Items Observation and remarks
No.
1. Name of the Project and location : Proposed Multi-modal Corridor Phase I: Section
II from Chirner (JNPT) To Balavali (NH17) for
(Range, Round, Beat) Length 18.00km.

Location i)Division : Alibag Forest Division.


ii) Range :
iii) Round :
iv) S. No. : As per area statement
2. Name of the User Agency : Mumbai Metropolitan Region Development
Authority, Mumbai.

3. Date of Site Inspection : / /2019

4. Extent (ha) and legal status of forest land 16.00 Ha.


:
proposed for diversion.

5. a) Details of forest land proposed for : Detailed area statement attached on


diversion and activity-wise break-up of forest Page No.
land.

b) Density of the forest. : The density is below 0.01

6. Whether the requirement of forest land as : Yes


proposed by the user agency in col.2 of part-I
is unavoidable and barest minimum for the
project. If no, recommended area item-wise
with details of alternative examined.

7. Whether the proposal involves any : No


construction of building (including
residential) or not? If yes, details thereof.

8. a. Whether forest area proposed for : No


diversion is important from wildlife point of
view or not.

b. Details of any rare or endangered or : Not seen.


unique species of florae and fauna found in
proposed forest land. If so, the details
thereof.

c. Aerial distance from the nearest boundary : Approximate aerial distance of proposed area is
of any Protected Area(km) 4.800 km from Karnala Bird Sanctuary.
d. Remarks about sensitivity of the forest :
area likely to be affected due to project.

e. Whether wildlife mitigation plan is : No


required? If, yes, reason therefore.

9. Details of vegetation :

a. Total number of trees to be felled: :

b. Number of trees to be felled of girth below


:
60 cm:

c. Number of trees to be felled of girth above :


60 cm:

d. Effect of removal of trees on the general : N. A.


eco system in the area

10. Background note on the proposal (short : Project summary is attached at page no……
summary)

11. Whether the proposal involves any violation : No


of Forest (Conservation) Act. 1980? If yes, a
detailed report on violation including action
taken against the concerned officials to be
attached.

12. Whether the proposal involves rehabilitation : No


of displaced person. If yes, whether
rehabilitation plan has been approved by the
State Government?

13. Details on catchment and cultivable : Nil


command area under the project (if
applicable)

Status of catchment area treatment palm to


prevent siltation of reservoir (if applicable)

14. Utility of the Project : Proposed Multi-modal Corridor Phase I: Section


II from Chirner (JNPT) To Balavali (NH17) for
Length 18.00km to enable convenient& safe
travel for all Passengers.

15. Whether land being diverted has any socio- : No


cultural / religious values? Whether any

sacred groves or very old growth


trees/forests exist in the areas proposed for
diversion

16. Any other important information related to : No


the project (Separate note may be attached,
if required)

17. Details of document and photographs :


Page no -
enclosed:

18. Recommendations of the Inspecting Officer : The project under reference is part of public
(CCF/CF/DCF) infrastructure facility and essential for
convenient& safe travel. Hence, the proposal is
being recommended.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 18
Certificate of the proposal of the Eco-Tourism scrutinized wide GOM
order no. WLP-1002/C.R.53/F-1/dt.20/02/2008 by Deputy Conservator of
Forests, Alibag Forest Division, Alibag.

Not applicable.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No.19
Compensatory afforestation Scheme by the Deputy Conservator of Forests,
Alibag Forest Division, Alibag

Compensatory Afforestation scheme is attached on page no.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 20
Certificate of Medicinal Plantation/road side /canal side plantation, wind power /
transmission line or other linear proposal scheme by Deputy Conservator of
Forest, Alibag.
Not Applicable.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 21
Cost Benefit Analysis
Cost benefit analysis is not applicable to the proposal involving forest land up
to 20ha in plains and up to 5 ha in hills. The present Proposed Multi-modal Corridor
Phase I: Section II from Chirner (JNPT) To Balavali (NH17) for Length 18.00km in the
State of Maharashtra, Involve on area of 16.00 ha. This land is plain forest land.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 22
Certificate of Item wise breakup of forest and non-forest area required category
wise (dam site, submergence, quarry, road, colony, canal etc. area statement by
Deputy Conservator of Forest, Alibag.
Complete list of forest and non-forest area of project is attached with the
Section other documents. Page no.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 23
Complete list of Identified Forest of the District Raigad.

Complete list of Identified Forest of Raigad District is attached with the other
documents on page no.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 24
Certificate of trees, species wise, girth wise, with local and scientific name to be
given. If feeling of trees essential? The estimate of tree felling to be enclosed. As
per GOI letter no. 7-1/89/(for) part-VIII/2012-BHO/848, dt.18.05.2012 by Deputy
Conservator of Forest, Alibag.
Detailed report of Nos. of mangroves / trees to be felling – Species wise,
girth wise along with its valuation report is attached at page no.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 25
Net present value certificate must be counter signed by Chief Conservator of Forest
with eco-class/category to be shown in the certificate of Forest as per the GOI letter
F.No.5-3/2007/FC, Dt 05/02/2009 to be enclosed.
This is to Certify that 16.00 ha of forest land to be used in this purpose i.e. for
Proposed Multi-modal Corridor Phase I: Section II from Chirner (JNPT) To Balavali
(NH17) for Length 18.00km Project in Village Dighode Survey/Gut No. 21, 22, NA,
124C; Village Vindhe Survey/Gut No. 173, 206A, 207A, 124/A, NA (RIVER), Village
Bhom Survey/Gut No. 8, Village Chirner Survey/Gut No. 200, 199, 185, 192, 176,
WATER BODY, 169, Village- Chikhali Bhom, Survey/Gut No. Water Body; Taluka Uran;
Village- Dighati Survey/Gut No. 78, 37A, 46, 47, NA (RIVER), Taluka Panvel; Village-
Kopar Survey/Gut No. NA, RIVER, 53, 49, 52, 47, 46, 38, Nala, Village- Rave Survey/Gut
No.43, 44, NA1, RIVER, Village- Shitole Survey/Gut No. 22, Village Majre Dadar
Survey/Gut No. 223A/1A/1TO5, Taluka Pen, District Raigad.
The density is 0.01, Eco class-III, category–open forest and value is Rs. 6, 26,000/-
ha.
The amount of Net Present Value of 16.00 ha. Forest land is Rs. 1,00,16,000/-(Rs.
One Crore, Sixteen Thousand only) is exactly as per the rates and calculation provided
in the Govt. Resolution No. FLD-1002/CR/199/F-10 dated 19/12/2003 of Govt. of
Maharashtra.
Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.

Chief Conservator of Forest (T)


Thane.
Certificate No. 27
Minimum Demand of Forest Area Certificate of Project Authority

This is to certify that no suitable alternative Non-Forest Land is available for the
purpose of for use of Forest Land to non-forest purpose i.e. to use Proposed Multi-
modal Corridor Phase I: Section II from Chirner (JNPT) To Balavali (NH17) for Length
18.00km alignment without avoiding the forest area Village: Dighode Survey/Gut
No.22, 21, 124c; Village: Vindhane Survey/Gut No. Na (River), 173, 206a, 207a, 124/A
Pai; Village: Chikhali Bhom Survey/Gut No. Water Body ; Village: Bhom Survey/Gut No.
8; Village: Chirnar Survey/Gut No.200, 199, 185, 192, 176, Water Body, 169; Taluka
Uran; Village: Dighati Survey/Gut No.78,46,47,37 A,Na (River); Taluka Panvel; Village:
Rave Survey/Gut No.44,43,Na1,River; Village: Majre Dadar Survey/Gut No.223a/1a/1
To 5; Village: Kopar Survey/Gut No.Na,River,53,52, 49,47, 46,Nala, 38; Village: Ambivli
Survey/Gut No. 11; Village: Shitole Survey/Gut No. 22; Taluka Pen; Dist Raigad
demand for the required forest land is lowest & minimum land demanded by the
Project Authority.
Date: - / /2019

Place: - Bandra.
Certificate No. 28
Cost of felling of tree certificate-Project Authority

This is to certify that Project Authority fully agree to bear the cost of
exploitation of felling of trees and their allied works in forest land Village: Dighode
Survey/Gut No.22, 21, 124c; Village: Vindhane Survey/Gut No. Na (River), 173, 206a,
207a, 124/A Pai; Village: Chikhali Bhom Survey/Gut No. Water Body ; Village: Bhom
Survey/Gut No. 8; Village: Chirnar Survey/Gut No.200, 199, 185, 192, 176, Water
Body, 169; Taluka Uran; Village: Dighati Survey/Gut No.78,46,47,37 A,Na (River);
Taluka Panvel; Village: Rave Survey/Gut No.44,43,Na1,River; Village: Majre Dadar
Survey/Gut No.223a/1a/1 To 5; Village: Kopar Survey/Gut No.Na,River,53,52, 49,47,
46,Nala, 38; Village: Ambivli Survey/Gut No. 11; Village: Shitole Survey/Gut No. 22;
Taluka Pen; Dist Raigad. Forest land at above locations is proposed to be diverted for
non-forest proposed purpose for Proposed Multi-modal Corridor Phase I: Section II
from Chirner (JNPT) To Balavali (NH17) for Length 18.00km in the State of
Maharashtra.
Date: - / /2019
Place: - Bandra.
Certificate No. 29
Compensatory Afforestation Cost- Certificate of Project Authority

Certified that the Project Authority is agree to defray the cost of


Compensatory afforestation as determined by the Forest Department.

Date: - / /2019
Place: - Bandra.
Certificate No. 30
No violation of forest (Conservation) Act. 1980 Guide lines under it- Certificate of
Project Authority
It is state that the proposed work is not yet started it will be started only
after the Government of India gives permission However, no violation of the
Forest (Conservation) Act, 1980 or its guidelines.
Date: - / /2019
Place: - Bandra.
Certificate No. 31
Net Present Value - Project Authority Undertaking

Project Authority here by gives an undertaking that, we agree to defray the


Net Present Value of Village: Dighode Survey/Gut No.22, 21, 124c; Village: Vindhane
Survey/Gut No. Na (River), 173, 206a, 207a, 124/A Pai; Village: Chikhali Bhom
Survey/Gut No. Water Body ; Village: Bhom Survey/Gut No. 8; Village: Chirnar
Survey/Gut No.200, 199, 185, 192, 176, Water Body, 169; Taluka Uran; Village: Dighati
Survey/Gut No.78,46,47,37 A,Na (River); Taluka Panvel; Village: Rave Survey/Gut
No.44,43,Na1,River; Village: Majre Dadar Survey/Gut No.223a/1a/1 To 5; Village:
Kopar Survey/Gut No.Na,River,53,52, 49,47, 46,Nala, 38; Village: Ambivli Survey/Gut
No. 11; Village: Shitole Survey/Gut No. 22; Taluka Pen; Dist Raigad as fixed by the
Forest Department for the area 16.00 ha. Proposed acquisition for the project for
Proposed Multi-modal Corridor Phase I: Section II from Chirner (JNPT) To Balavali
(NH17) for Length 18.00km in the State of Maharashtra.
Date: - / /2019
Place: - Bandra.
Certificate No. 32
Certificate of project authority-providing i.e. water supply facilities to

Not applicable

Date: - / /2019
Place: - Bandra.
Certificate No. 33
Certificate of the Project Authority to get the
Environment clearance-Whenever necessary

Applied for Environment clearance.

Date: - / /2019
Place: - Bandra.
Certificate No. 34
Certificate of Non Indemnity to Forest Department-By Project Authority

Not applicable

Date: - / /2019
Place: - Bandra.
Certificate No. 35
Certificate for area under enquiry under Private Forest (Acquisition)
Act.1975- By Villagers

Not applicable

Date: - / /2019
Place: - Bandra.
Certificate No. 36
Certificate of the project authority to take up catchment area treatment
plan as per the guidelines of Government of India

Not applicable

Date: - / /2019
Place: - Bandra.
Certificate No. 37
Certificate of the Catchment area treatment plan

Not applicable

Date: - / /2019
Place: - Bandra.
Certificate No. 38
Certificate by project authority of Command area development plan.

Not applicable

Date: - / /2019
Place: - Bandra.
Certificate No. 39
Certificate by project authority whether stipulation is made that 5% of
area under command of the project is made available to the Forest
Department for planting trees and other vegetation for which necessary
irrigation should be provided free of cost by the project authority/user
agency. If the forest area involved is less than 2.00 ha. And there is no
felling to tree growth; it is to be dealt with as per simplified procedure.

Not applicable.

Date: - / /2019
Place: - Bandra.
Certificate No. 40
Certificate of project note by the project authority, with salient
features.
Not applicable.

Date: - / /2019
Place: - Bandra.
Certificate No. 41
Certificate by project authority of calculated 2.00 mtr. of sub mergence
given for forest area.
Not applicable.

Date: - / /2019
Place: - Bandra.
Certificate No. 42
Certificate by project authority of list of trees 2.00 mtr, 4.00 mtr. Below
F.R.L. in sub mergence area species wise.
Not applicable.

Date: - / /2019
Place: - Bandra.
Certificate No. 43
Certificate by project authority of Administrative/Technical approval
from the competent authority to be enclosed.
It is certify that, the project alignment has been approved vide letter
No. MMRDA/Meeting/130 Date 07.05.2012.

Date: - / /2019
Place: - Bandra.
Certificate No. 44
Certificate by project authority of Certificate / undertaking by the project
authority regarding the wind power project as per the GOI letter dated
14.05.2004 to be enclosed.
Not Applicable.

Date: - / /2019
Place: - Bandra.
Certificate No. 45
Certificate by project authority of in case of proposal related to stone
quarries, the recommendation of the director, Geological.

Not applicable

Date: - / /2019
Place: - Bandra.
Certificate No. 46
If any protected archaeological/heritage site and other important monument
is located in t h e area Certificate by Archaeological Department

This is to certify that Proposed Multi-modal Corridor Phase I: Section II from


Chirner (JNPT) To Balavali (NH17) for Length 18.00km project of Village: Dighode
Survey/Gut No.22, 21, 124c; Village: Vindhane Survey/Gut No. Na (River), 173,
206a, 207a, 124/A Pai; Village: Chikhali Bhom Survey/Gut No. Water Body ;
Village: Bhom Survey/Gut No. 8; Village: Chirnar Survey/Gut No.200, 199, 185,
192, 176, Water Body, 169; Taluka Uran; Village: Dighati Survey/Gut
No.78,46,47,37 A,Na (River); Taluka Panvel; Village: Rave Survey/Gut
No.44,43,Na1,River; Village: Majre Dadar Survey/Gut No.223a/1a/1 To 5; Village:
Kopar Survey/Gut No.Na,River,53,52, 49,47, 46,Nala, 38; Village: Ambivli
Survey/Gut No. 11; Village: Shitole Survey/Gut No. 22; Taluka Pen; Dist Raigad is
not likely to affect any monument site of cultural, historical, religious,
archaeological or recreational importance.
Date: - / /2019
Place: - Bandra.
Certificate No. 47
Wildlife Certificate if proposed area is within 10 km from National
Park/Sanctuary - By the Deputy Conservator of Forests Wildlife
This is to certify that, “Karnala Bird Sanctuary” is at a distance of 4.800 km from
nearest forest area, which is proposed for diversion. Details are shown in the map at
page no.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 48
No objection certificate of M.D., F.D.C.M. involvement of their area.
Not applicabal.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
Certificate No. 49
Relevant notification/7-12 extract/restoration order/rights of record etc of the
proposed forest land to be enclosed.
The 7-12 extract of each forest Gut no. is enclosed with this FDP.
On Page No.

Date: - / /2019
Place: - Bandra.
Certificate No. 50
Certificate from the Collector that no alternative suitable non forest land is
available for the project (in A Form itself)

Not Applicable

Date: - / /2019
Place: - Bandra.
Certificate No. 51
Certificate of collector under the FRA -2006 with resolution of Gram sabha /
Gram Pachayat as per GOI letter dated 03.08.2009 to be enclosed.

Submitted by letter no.

Date: - / /2019
Place: - Bandra.
Certificate No. 52
Certificate of Compensatory afforestation land made available by Collector.
Not applicable.

Certificate No. 53
Certificate of non-availability of non-forest area of compensatory afforestation
by the Collector/Commissioner.
Not applicable.

Date: - / /2019
Place: - Bandra.
Certificate No. 54
The agency has not given alternative land to the forest department. If non forest
land for C.A. Scheme is not available in the entire state the certificate from the
chief secretary of the State to be enclosed vide letter GOI letter date 13.02.2012.
Not applicable.

Certificate No. 55
As the project, area is within the 10 km form boundary of PA area therefore, the
information regarding 16 points check list provided by Principal Chief
Conservator of Forest (W.L.) Nagpur which is enclosed herewith to be furnished.
Not applicable.

Date: - / /2019
Place: - Bandra.
Certificate - 56
All the certificate and documents must have name of the signatory,
designation, station, & date under the signature as per the GOM letter vide,
dtd. 01 December 2010.

This is to certify that all the certificate and documents must have name of
the signatory, designation, station, & date under the signature as per the GOM
letter vide, dtd. 01 December 2010.

Date: - / /2019
Place: - Bandra.
Certificate - 57
Resolution of the Gram Sabha may not be required in cases of projects
like transmission line, roads, canals, laying of pipeline/optical fibers where
Linear diversion of forest land in several villages are involved, unless
recognized rights of PTG/PAC are being affected as per Government of India
F.No.11-9/98-FC(pt) dated 05/02/2013

As per above GOI Order Resolution of the Gram Sabha are not
required for this project.

Date: - / /2019
Place: - Alibag.

(Maneesh Kumar)
Deputy Conservator of Forest,
Alibag Forest Division,
Alibag.
7/12 Extract