Site Binder

Telkomsel Project

Site ID : SBY360
Site Name : WONOCOLOJEMURSARIMW
Region : East Java
Site Location : Jl. Raya Jemursari No 10
Kel.Tenggilis Mejoyo Kec.Tenggilis
Mejoyo, Surabaya 60292

BTS Type : NA
:
SOW 900
PO Number : PRESALES

TELKOMSEL :

HUAWEI:
1. BOQ, ENGPAR DAN DN
Detail SOW : New Filter L900

Site ID : SBY360
Site Name : WONOCOLOJEMURSARIMW
BTS Type : NA
Band : L900

Capture Bill of Quantity (BoQ)


Delivery Note (DN)
Delivery Note (DN)
RNP Report / ENGPAR Capture
2. BTS VSWR Test
Site ID : SBY360
SITE CONFIG : DATE :
SITE NAME : WONOCOLOJEMURSARIMW
VSWR TEST
No RU Board RU Panel and Port VSWR Audit

RRU/ RFU – Port 0 0 PASS


1 RRU/ RFU 1
RRU/ RFU – Port 1 0 PASS

RRU/ RFU – Port 0 0 PASS


2 RRU/ RFU 2
RRU/ RFU – Port 1 0 PASS

RRU/ RFU – Port 0 120 PASS


3 RRU/ RFU 3
RRU/ RFU – Port 1 121 PASS

RRU/ RFU – Port 0 0 PASS


4 RRU/ RFU 4
RRU/ RFU – Port 1 0 PASS

RRU/ RFU – Port 0 0 PASS


5 RRU/ RFU 5
RRU/ RFU – Port 1 0 PASS

RRU/ RFU – Port 0 0 PASS


6 RRU/ RFU 6
RRU/ RFU – Port 1 0 PASS

Notes:
1. for the new site: VSWR < 1.3
2. for the swap site: only test and record the value of VSWR
3. the test result of VSWR need to be print out

3. BTS Commissioning Record


Site ID : SBY360
SITE CONFIG: DATE:
Site Name :WONOCOLOJEMURSARIMW
Cell parameter Plan Actual Remark
CI

Antenna direction
Sector1 0 0
(Azimuth)
Antenna Tilt (M+E)
0 0
(Degree)
CI

Antenna direction
Sector 2 0 0
(Azimuth)
Antenna Tilt (M+E)
0 0
(Degree)

CI

Antenna direction
Sector 3 0 0
(Azimuth)

Antenna Tilt (M+E)


0 0
(Degree)
4. Capture Integration Test
SBY360 / WONOCOLOJEMURSARIMW
L900

CAPTURE RRU/RFU TOPOLOGY

CAPTURE BBU DEVICE MAINTENANCE


CAPTURE LST ALARM

CAPTURE DSP VSWR


CAPTURE DSP LICENSE

CAPTURE DSP OMCH


CAPTURE DSP SCTPLINK

CAPTURE DSP CELL


CAPTURE LST CELL (Bandwidth)
CAPTURE DSP BRD

DSP BRDMRINFO - BBU


CAPTURE DSP BRDMRINFO - CE BOARD
CAPTURE DSP BRDMRINFO - WMPT/UMPT

CAPTURE DSP BRDMRINFO - RRU A


CAPTURE DSP BRDMRINFO - RRU B

CAPTURE DSP BRDMRINFO - RRU C


CAPTURE DSP UCELLCFG

CAPTURE LST ULOCELL


CAPTURE LST BOARD (EMUA)

CAPTURE LST BTS ENVA PORT


CAPTURE eNODEB Function

ADDITIONAL CAPTURE 1

ADDITIONAL CAPTURE 2
CAPTURE DSP RET

CAPTURE RET SUB UNIT


Test Call
SECTOR 1 SECTOR 2 SECTOR 3

Video Call
SECTOR 1 SECTOR 2 SECTOR 3
5. Installation Photo
Site ID : SBY360 / WONOCOLOJEMURSARIMW
Band : L900 900
Detail Sow : New Filter L900

SITE LOCATION

BTS CABINET PHOTO

Cabinet Open Cabinet Closed


BBU - Before BBU - After

EMUa C- Canal installation


DCDU power cable DCDU/BVDC

MCB input DCDU/BVDC Power Cable RRU


CPRI Labeling Spare Cable Optic

RRU/RFU Photo
BEFORE

Sect 1 Sect 2
Sect 3 Sect 4

BEFORE

Sect 5 Sect 6

RRU/RFU Photo
AFTER
Sect 1 Sect 2

RRU AFTER

Sect 3 Sect 4
Sect 5 Sect 6

Grounding Installation

at DCDU, BBU, EMUb Grounding Cabinet

Grounding Installation
Connect to Busbar (sect 1) Connect to Busbar (sect 2)

Connect to Busbar (sect 3)

Antenna Sector
Before
Sect 1 Sect 2

Sect 3

Antenna Installation - After


Sector 1 Sector 2
Sect 3

Antenna Installation - After


Sector 4 Sector 5
Sect 6

Azimuth
Sector 1 Sector 2
Sect 3

Azimuth
Sector 4 Sector 5
Sect 6

MECHANICAL TILTING
Sector 1 Sector 2
Sect 3

MECHANICAL TILTING
Sect 4 Sect 5
Sect 6

view of AISG/RET cable


Sector 1 Sector 2
Sect 3

view of AISG/RET cable


Sector 4 Sector 5
Sect 6

Antenna Type
Sector 1 Sector 2
Sect 3

Antenna Type
Sector 4 Sector 5
Sect 6

Photo GPS Installation


GPS install GND kit cable coax GPS

Arester GPS connect to UMPT Arester GPS in cabinet


View of Tower
6. Punchlist
Site ID : SBY360
Site Name : WONOCOLOJEMURSARIMW
Band : L900
Check result
Rectified By
No. Items Descriptions Remarks
HUAWEI TELKOMSEL

Note :

Please record the items and detail description if there is any items that can not be complete the test or