You are on page 1of 66

Telecom Site Survey Report

Doc respons/Approved Checked Date Rev. File


Mohammed Alam

1 - INTRODUCTION :
PROJECT NAME : Next PROJECT 2023 CUSTOMER : MOBILY

PROJECT MANAGER : MOHAMMED NASSER COUNTRY : SAUDI ARABIA

SITE ID : 4258 DATE OF AUDIT : 8/31/2023

1.1 - SITE DETAILS


Site Picture

Site Pic 1 Site Pic 2(Door Label)

a) GENERAL
Site ID : 4258
Address & Nearest Village Name : AL LITH
GPS Coordinates (WGS84 decimal degrees) 20.151328 °N 40.273346 °E

b) TOWER
Site Type : Macro
Shelter Type: Normal
Civil Model: 12m RoofTop Tower
Pole/Tower Height : 12m
Building Height : 16m

c) Security
Security Guard at Site No

Special Permit Required For Access No

Access details in Day / Night time


Open
(if Yes, brief description)

Crane requirement ( if Yes, brief


No
description)
2 - ANTENNA SYSTEM DETAILS

2.1 - Existing 2G System


900Mhz 1800Mhz

Sec A Sec B Sec C Sec D Sec A Sec B Sec C Sec D

K80010291V K80010291V K80010291V


Antenna Type
02 02 02

No of
Antennas
1 1 1

Antenna
Azimuth
20 140 250

Antenna
Height
28m 28m 28m
Electrical Tilt /
Mechanical RET/0 RET/0 RET/0
Tilt

Indoor Jumper
Length & Type
3m&1/2'' 3m&1/2'' 3m&1/2''

Feeder Type /
Fiber
7/8'' 7/8'' 7/8''
Feeder
no's,Length or 2&25m 2&25m 2&25m
FO length

TMA (Yes/No) Yes Yes Yes

RET Cable
length
No No No

Diplexer/Triplex
er (Yes/No) with Yes (1) Yes (1) Yes (1)
Qty

ERS/RRUS
Type (if any)
1xRUS01 B8 1xRUS01 B8 1xRUS01 B8

Bracket Type
of ERS/RRUS
No No No
Power Source
of
RBS/ERS/RR
MDB
US
CB rating in
Amperes
63A
CB Type
(ABB, ABB
Emerson etc)

RBS Type &


Qty
6101 & 1
BB Type
(sharing if 1xDUG + Router 6471
any)

Site
Configuration

Ant. Sharing
900/1800/3G/LTE with U900/3G/FDD/L800
2.2 - Existing 3G System

2100Mhz U900

Sec A Sec B Sec C Sec D Sec A Sec B Sec C Sec D

K80010291V K80010291V K80010291V K80010291V K80010291V K80010291V


Antenna Type
02 02 02 02 02 02

# of Antennas 1 1 1 1 1 1

Antenna
Azimuth
20 140 250 20 140 250

Antenna
Height
28m 28m 28m 28m 28m 28m
Electrical Tilt /
Mechanical RET/0 RET/0 RET/0 RET/0 RET/0 RET/0
Tilt

Indoor Jumper
Length & Type
3m&1/2'' 3m&1/2'' 3m&1/2'' 3m&1/2'' 3m&1/2'' 3m&1/2''

Feeder Type /
Fiber
7/8'' 7/8'' 7/8'' 7/8'' 7/8'' 7/8''
Feeder
no's,Length or 2&25m 2&25m 2&25m 2&25m 2&25m 2&25m
FO length

TMA (Yes/No) Yes Yes Yes Yes Yes Yes

RET Cable
length
3m 3m 3m No No No

Diplexer/Triplex
er (Yes/No) with Yes (1) Yes (1) Yes (1) Yes (1) Yes (1) Yes (1)
Qty

ERS/RRUS
Type (if any)
1xRUS01 B1 1xRUS01 B1 1xRUS01 B1 1xRUS01 B8 1xRUS01 B8 1xRUS01 B8

Bracket Type
of ERS/RRUS
No No No No No No
Power Source
of
RBS/ERS/RR
MDB MDB
US
CB rating in
Amperes
63A 63A
CB Type
(ABB, ABB ABB
Emerson etc)

RBS Type &


Qty
6101 & 1 6101 & 1
BB Type
(sharing if 1xBB5212 with U900 1xBB5212 with 3G
any)

Site
Configuration

Ant. Sharing
900/1800/3G/LTE with 2G/U900/FDD/L800 with 2G/3G/FDD/L800
2.3 - Existing 4G System

LTE FDD LTE TDD

Sec A Sec B Sec C Sec D Sec A Sec B Sec C Sec D

K80010291V K80010291V K80010291V


Antenna Type K80010622 K80010622 K80010622
02 02 02

# of Antennas 1 1 1 1 1 1

Antenna
Azimuth
20 140 250 20 100 240

Antenna
Height
28m 28m 28m 28m 28m 28m
Electrical Tilt /
Mechanical RET/0 RET/0 RET/0 RET/0 RET/0 RET/0
Tilt

Indoor Jumper 3m&1/2'' 3m&1/2'' 3m&1/2'' 3m&1/2'' 3m&1/2'' 3m&1/2''


Length & Type OD OD OD OD OD OD
Feeder Type /
Fiber
Fiber Fiber Fiber Fiber Fiber Fiber
Feeder
no's,Length or 1&50m 1&50m 1&50m 1&50m 1&50m 1&50m
FO length

TMA (Yes/No) No No No No No No

RET Cable
length
3m 3m 3m 3m 3m 3m

Diplexer/Triplex
er (Yes/No) with Yes (1) Yes (1) Yes (1) No No No
Qty

ERS/RRUS 1x2219 B3 1x2219 B3 1x2219 B3


Type (if any)
1xRRUS72 1xRRUS72 1xRRUS72
1xA2 B3 1xA2 B3 1xA2 B3
Bracket Type Rail Rail Rail
of ERS/RRUS
Pole Pole Pole
Pole Pole Pole
Power Source
of
RBS/ERS/RR
MDB MDB
US
CB rating in
Amperes
63A 63A
CB Type
(ABB, ABB ABB
Emerson etc)

RBS Type &


Qty
6101 & 1 6101 & 1
BB Type
(sharing if 1xBB5216 + R503 with TDD/L800 1xBB5216 + R503 with FDD/L800
any)

Site
Configuration

Ant. Sharing
900/1800/3G/LTE with 2G/U900/3G/L800 SA
2.4 - Existing 5G / L800 System

5G L800

Sec A Sec B Sec C Sec D Sec A Sec B Sec C Sec D

K80010291V K80010291V K80010291V


Antenna Type
02 02 02

# of Antennas 1 1 1

Antenna
Azimuth
20 140 250

Antenna
Height
28m 28m 28m
Electrical Tilt /
Mechanical RET/0 RET/0 RET/0
Tilt

Indoor Jumper 15m&1/2'' 15m&1/2'' 15m&1/2''


Length & Type OD OD OD
Feeder Type /
Fiber
Fiber Fiber Fiber
Feeder
no's,Length or 1&50m 1&50m 1&50m
FO length

TMA (Yes/No) No No No

RET Cable
length
15m 15m 15m

Diplexer/Triplex
er (Yes/No) with Yes (1) Yes (1) Yes (1)
Qty

ERS/RRUS
Type (if any)
1x2217 B20 1x2217 B20 1x2217 B20

Bracket Type
of ERS/RRUS
Rail Rail Rail
Power Source
of
RBS/ERS/RR
MDB
US
CB rating in
Amperes
63A
CB Type
(ABB, ABB
Emerson etc)

RBS Type &


Qty
6101 & 1
BB Type
(sharing if 1xBB5216 + R503 with TDD/FDD
any)

Site
Configuration

Ant. Sharing
900/1800/3G/LTE with 2G/U900/3G/FDD
3 - EXISTING POWER SYSTEM
3.1 - DC POWER SYSTEM

DC Power (-48V)

Rectifier Available : Rectifier Operational :

Rectifier Type :

Total rectifier modules

Available, not in use

Available no of PDU's & PDU slot in 3G Cabinet

Current -48V DC Power Consumption :

Number of Free Rectifier's Position:

Fuse Holder/MCB Breaker Available :

CB Type / Fuse Type in the Holder

GENERATOR DUAL :

GENERATOR SINGLE :

No GENERATOR :

SCECO POWER :

DC Power - 48V -DETAILS

Ampere Type Total Qty Spare

Fuse holder/MCB Breaker:

Fuse holder/MCB Breaker:

Fuse holder/MCB Breaker:

Fuse holder/MCB Breaker:

Fuse holder/MCB Breaker:

Fuse holder/MCB Breaker:

Fuse holder/MCB Breaker:

Power Cable (BTS -48V) :

Portable Power Supply needed:

Note
3.2 - AC POWER SYSTEM

Others
AC Power (220V)
Specify

MDB Available : Yes MDB Operational : Yes

MDB Type : MDB Input Power (V) :

MDB Size Existing Load (Amp) :

Power Source/Size (Power


Cable type)

SCECO POWER : Yes

AC Power - MDB CIRCUIT BREAKER DETAILS

Technology Ampere Pole Type Type Spare

Fuse holder/Main Circuit


RBS6101 63 3 Pole ABB 0
Breaker:

Fuse holder/Circuit
FDD 63 3 Pole ABB 0
Breaker:

Fuse holder/Circuit
L800 20 2 Pole ABB 0
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Fuse holder/Circuit
Breaker:

Power Cable (BTS AC) :

Portable Power Supply needed:

Note
4 - RF ENVIRONMENT DETAILS

4.1 - Location and Panoramic Analysis


Panoramic Pictures - Sector A

Panoramic Pictures - Sector B


Panoramic Pictures - Sector C

Panoramic Pictures - Sector D


4.2 - Outdoor Installation Details

Sector 1-Antenna installation environment(Face to the tower or pole to take photo for the antenna
installation environment)Full Tower view

Sector 1-Antenna installation environment(Face to the tower or pole to take photo for the antenna
installation environment)Zoomed view
Sector 2-Antenna installation environment(Face to the tower or pole to take photo for the antenna
installation environment)Full Tower view

Sector 2-Antenna installation environment(Face to the tower or pole to take photo for the antenna
installation environment)Zoomed view
Sector 3-Antenna installation environment(Face to the tower or pole to take photo for the antenna
installation environment)Full Tower view

Sector 3-Antenna installation environment(Face to the tower or pole to take photo for the antenna
installation environment)Zoomed view
Sector 4-Antenna installation environment(Face to the tower or pole to take photo for the antenna
installation environment)Full Tower view

Sector 4-Antenna installation environment(Face to the tower or pole to take photo for the antenna
installation environment)Zoomed view
5 - INDOOR AND OUTDOOR PICTURES

Tower Feeder System /Tray/Ladder Pictures


Tower Feeder System /Tray/Ladder Pictures
Shelter inside view 1 ( from door )

Shelter inside view 2 ( from door )


Existing Equipments - 2G

Existing Equipments - 3G
Existing Equipments - 4G

Existing Equipments - 5G / L800


External Alarms Avaialbe Type & Comments:

Current Float in Rectifier NextComments


Existing Equipments - Circuit Breaker panel Existing Equipments - Battery String

Existing Equipments - MDB (Door open ) Existing Equipments - TRM Rack


Existing equipments - Indoor Cable Ladder Existing equipments -IndoorCable Ladder

Earthing Indoor Earthing Outdoor


Roxtec Entry Indoor
Roxtec Entry Outdoor
Roxtec Info Roxtec 1 Roxtec 2 Roxtec 3
No of feeders
Dimension
No of IF cables

CB 1 2 3
No of CB
Used CB
Free CB

6 - TRANSMISSION DETAILS

6.1 - Existing Links

No. Far End Ant. Diameter (m) Height (m.a.g.l) Azimuth to FE(deg)

1
2
3
4
5
6
7
8

Definition of Terms

ACDB AC Distribution Box


ASC Antenna System Controller
BATB Building Alarm Termination Box
BSC Base Station Controller
DC Direct Current
DCDP DC Distribution Point
GSM Global System for Mobile Telecommunication
IF Intermediate Frequency
RBS Radio Base Station
RDU Rapid Deployment Unit
RET Remote Electrical Tilt
RF Radio Frequency
RNC Radio Network Controller
SB Square Base
TMA Tower Mounted Amplifier
TRM Transmission Rack
WiMAX Worldwide Interoperability for Microwave Access
WM Wall Mount
Telecom Site Survey Report
Doc respons/Approved Checked Date Rev. File
Mohammed Alam

PROJECT NAME : Next PROJECT 2023 CUSTOMER : MOBILY

PROJECT MANAGER : MOHAMMED NASSER COUNTRY : SAUDI ARABIA

SITE ID : 4258 DATE OF AUDIT : 8/31/2023

PROJECT MODEL #

SCOPE OF WORK 3x2219 B1 + dismantle 3xRUS 01 B1 + 1xPSU 6302

Item Description Required (Yes/No ) Remarks

New RBS / Hybrid RBS No Existing RBS6101 to be used

Digital Unit / Baseband


No Existing BB to be used
(DU/BB )
New
Enclosure/New 19"
Rack/New Pole for Enclosure(if any) No
RBS6601/Main
Unit
19’’RACK / Router No

Circuit Breaker No

ERS & its Location Yes 3xRadio 2219 B1 + 1xPSU 6302 to be installed on body of tower in Vertical Position

Pole (1m / 1.5m for ERS) No

Bracket Type Yes Rail

ERS System

Circuit Breaker Yes Need new MDB . Need 1x20A CB ABB in new MDB with PSU 6302

Cable Tray 100/300mm (for ERS) No

Cable Tray 100/300mm (for FO &


No
Power cables)

2G 900 / W900 / L800 Antenna No Existing K80010291 Ant to be used with existing 3xDiplexer(B8/B20)

LTE 800 Antenna No Existing K80010291 Ant to be used with existing 3xDiplexer(B8/B20)

LTE FDD 2100 / 3G 2100 No Existing K80010291 Ant to be used with existing 3xDiplexer(B1/B3)

Antenna System

LTE FDD 1800 / 2G 1800 No Existing K80010291 Ant to be used with existing 3xDiplexer(B1/B3)

LTE TDD Antenna No Existing K80010622 Ant to be used

5G Antenna No

Mounts for Antenna / ERS ( If any ) No

Minor Civil Work Existing cable tray to be used (Need 8 long L Bracket) , And arrange old power Fiber routing to make space for
Cable Tray / Roxtec No
required new Fiber and DC

DCDP No Need new MDB . Need 1x20A CB ABB in new MDB with PSU 6302

Need new MDB . Need 1x20A CB ABB in new MDB with PSU 6302
NextInformation Existing cable tray to be used (Need 8 long L Bracket) , And arrange old power Fiber routing to make space for
new Fiber and DC

AAR : SAFE AS PROPOSED FOR THE INSTALLATION 3 # ERS


1.) REMOVE OFF AIR MW & RF & UNUSED FEEDERS FROM THE STRUCTURE IMMEDISTELY.
2.) Vendor to inspect the structure before making any expansion activity on the site, with respect to physical damage /
missing members / rusting / loose connection and bolts tightening / broken or missing counter weights for the CW
structure
MAIN UNIT : PROPOSAL

Proposed/Existing RBS Location Existing RBS6101 to be used

Proposed DU/BB/RBS6601 Location Existing BB to be used


Doc respons/Approved Checked Date Rev. File
Mohammed Alam

PROJECT NAME : BORDER CLEANUP 2021 CUSTOMER : MOBILY

PROJECT MANAGER : HASSAN EL BANNA COUNTRY : SAUDI ARABIA

SITE ID : 0 DATE OF AUDIT : 1/0/1900

PROJECT MODEL #

SCOPE OF WORK

Item Description Required (Yes/No ) Remarks

New RBS / Hybrid RBS

Digital Unit / Baseband


(DU/BB )
New
Enclosure/New 19"
Rack/New Pole for Enclosure(if any)
RBS6601/Main
Unit
19’’RACK / Router

Circuit Breaker

ERS & its Location

Pole (1m / 1.5m for ERS)

Bracket Type

ERS System

Circuit Breaker

Cable Tray 100/300mm (for ERS)

Cable Tray 100/300mm (for FO &


Power cables)

2G 900 / W900 / L800 Antenna

LTE 800 Antenna

LTE FDD 2100 / 3G 2100

Antenna System

LTE FDD 1800 / 2G 1800

LTE TDD Antenna

5G Antenna

Mounts for Antenna / ERS ( If any )

Minor Civil Work


Cable Tray / Roxtec
required

DCDP

NextInformation
MAIN UNIT : PROPOSAL

Proposed/Existing RBS Location

Proposed DU/BB/RBS6601 Location


SCOPE OF WORK

ANTENNA- RADIO : PROPOSALS - 1

PROPOSED TECHNOLOGY

Sector A : Antenna Type & Location Existing K80010291 Ant to be used with existing 1xDiplexer(B1/B3)

PROPOSED TECHNOLOGY
Req RET cable
Sector A : Proposed Radio Type and Location 1x2219 B20 for U21/L21 MM + PSU 6302 to be installed on the body of tower in Vertical Position
15m

2219 B1
2219 B1
2219 B1

PSU 6302
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector B : Antenna Type & Location Existing K80010291 Ant to be used with existing 1xDiplexer(B1/B3)

PROPOSED TECHNOLOGY
Req RET cable
Sector B : Proposed Radio Type and Location 1x2219 B20 for U21/L21 MM + PSU 6302 to be installed on the body of tower in Vertical Position
15m

2219 B1
2219 B1
2219 B1

PSU 6302
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector C : Antenna Type & Location Existing K80010291 Ant to be used with existing 1xDiplexer(B1/B3)

PROPOSED TECHNOLOGY
Req RET cable
Sector C : Proposed Radio Type and Location 1x2219 B20 for U21/L21 MM + PSU 6302 to be installed on the body of tower in Vertical Position
15m

2219 B1
2219 B1
2219 B1

PSU 6302
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector D : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector D : Proposed Radio Type and Location
SCOPE OF WORK

ANTENNA- RADIO : PROPOSALS - 2

PROPOSED TECHNOLOGY

Sector A : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector A : Proposed Radio Type and Location
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector B : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector B : Proposed Radio Type and Location
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector C : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector C : Proposed Radio Type and Location
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector D : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector D : Proposed Radio Type and Location
SCOPE OF WORK

ANTENNA- RADIO : PROPOSALS - 3

PROPOSED TECHNOLOGY

Sector A : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector A : Proposed Radio Type and Location
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector B : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector B : Proposed Radio Type and Location
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector C : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector C : Proposed Radio Type and Location
ANTENNA- RADIO : PROPOSALS

PROPOSED TECHNOLOGY

Sector D : Antenna Type & Location

PROPOSED TECHNOLOGY
Req RET cable
Sector D : Proposed Radio Type and Location
POWER : PROPOSAL

MDB Type & Location Existing MDB to be used

New MDB / Circuit Breaker Proposed Location Need new MDB . Need 1x20A CB ABB in new MDB with PSU 6302

New MDB
Battery : PROPOSAL

Existing Battery Location

Battery Proposed Location


Rectifier : PROPOSAL

Existing Rectifier

Rectifier Proposed Location


CABLE TRAY/ ROXTEC : PROPOSAL

Existing cable tray to be used (Need 8 long L Bracket) , And arrange old power Fiber routing
Cable Tray Location & Space Availability for Fiber and Power
to make space for new Fiber and DC
Clamps

Roxtec Location and Space availability Existing Roxtec to be used


CABLE TRAY/ ROXTEC : PROPOSAL

Indoor Routing of Fibers / Power

New Cable Tray Proposed Location


CABLE TRAY/ ROXTEC : PROPOSAL

New Cable Tray Proposed Location

Proposed Roxtec Location


ROXTEC / CABLE TRAY : PROPOSAL

Proposed Indoor Routing of Fiber / Power

Proposed Indoor Routing of Fiber / Power Fiber box inside cable tray
Doc respons/Approved Rev. File
Checked Date
Mohammed Alam

PROJECT NAME : NextL800 SCOPE CUSTOMER : MOBILY

PROJECT MANAGER : MOHAMMED NASSER COUNTRY : SAUDI ARABIA

SITE ID : 4258 DATE OF AUDIT : 8/31/2023

PROJECT MODEL #

SCOPE OF WORK 3x2219 B1 + dismantle 3xRUS 01 B1 + 1xPSU 6302

Site ID 4258 ANTENNA DIAGRAM - 1

ITEMS TO BE DISMANTLED

Item Description Type Qty Serial No Tag No Comments


1 RU RUS 01 B1 3
2
3
4
5
6
7
8
9
#
#
#
#
ITEMS TO BE DISMANTLED
ITEMS TO BE DISMANTLED
ITEMS TO BE DISMANTLED
Doc respons/Approved Rev. File
Checked Date
Mohammed Alam

PROJECT NAME : Next PROJECT CUSTOMER : MOBILY

PROJECT MANAGER : MOHAMMED NASSER COUNTRY : SAUDI ARABIA

SITE ID : 0 DATE OF AUDIT : 1/0/1900

Next MODEL & PHASE 0

SCOPE 0

Site ID 0 ANTENNA DIAGRAM - 2

ITEMS TO BE DISMANTLED

Item Description Type Qty Serial No Tag No Comments


1
2
3
4
5
6
7
8
9
#
#
#
#
ITEMS TO BE DISMANTLED
ITEMS TO BE DISMANTLED
ITEMS TO BE DISMANTLED
SITE ID : 4258

RF ENVIRONMENT DETAILS
Location and Panoramic Analysis
Panoramic Pictures - 0 Degree

Panoramic Pictures - 30 Degree


Panoramic Pictures - 60 Degree

Panoramic Pictures - 90 Degree


Panoramic Pictures - 120 Degree

Panoramic Pictures - 150 Degree


Panoramic Pictures - 180 Degree

Panoramic Pictures - 210 Degree


Panoramic Pictures - 240 Degree

Panoramic Pictures - 270 Degree


Panoramic Pictures - 300 Degree

Panoramic Pictures - 330 Degree


Site Access / Damages / Missing items / other issues at site pictures

Coordinates

Power connection for ODC to power both shelves inside ODC


SITE ACCESS
Site and Road Access Pictures
Site ID: 4258

City: AL LITH

Remarks: Adding L2100 Layer

Phase: NEXT Project

Technology Activity

2G (900Mhz) No Change

2G (1800Mhz) No

3G (U900) No Change

3G (U2100) Carrier Downgrade & Radio Swap

LTE-FDD (800Mhz) No Change

LTE-FDD (1800MHz) No Change

LTE-FDD (2100MHz) New

LTE-TDD (2600MHz) No Change

5G B41( 2600 MHz) No

Total Number of Technologies 7


SITE ACCEPTANCE/CHANGE FORM
General Site Information
Vendor ERICSSON Site ID 4258 CLLI LITAKHAG SAF Rev# 1 Region WR Area Type Town City AL LITH Governorate AL LITH Province MAKKAH AL MUKARRAMAH District AL LITH
Latitude 20.1513 Longitude 40.2731 FDD(800) TxRx Conf 2T2R 2G W4258-R2GN-ER-01-LTH Scope Stamp
Civil Type 12m Rooftop Tower Height 28m Antenna1 K80010291 V02 T2 3 5G TxRx Config - 3G W4258-R3GN-ER-01-LTH NEXT Project
FDD/
No of Sectors 3 Antenna2 K80010622 M3 3 TDD TxRx Config 4T4R/2T4R/2T2R W4258-R4GN-ER-01-LTH
TDD
Antenna3 - - FDD (1800/2100)TxRx Config 2T4R/2T2R 5G Adding L2100 Layer
Antenna4 - -
Antenna5 - -
Technology Exist G900 No G1800 Exist U900 SCF U2100 Exist FDD800 Exist FDD1800 SAF FDD2100 Exist TDD2600 No 5G
Sector A B C D A B C D A B C D A B C D A B C D A B C D A B C D A B C D A B C D
Type / Qty T2/Exi T2/Exi T2/Exi - - - - - T2/Exi T2/Exi T2/Exi - T2/Exi T2/Exi T2/Exi - T2/Exi T2/Exi T2/Exi - T2/Exi T2/Exi T2/Exi - T2/Exi T2/Exi T2/Exi - M3/Exi M3/Exi M3/Exi - - - - -
Orientation 20 140 250 - - - - - 20 140 250 - 20 140 250 - 20 140 250 - 20 140 250 - 20 140 250 - 20 100 240 - - - - -
Antenna Information

Height 28 28 28 - - - - - 28 28 28 - 28 28 28 - 28 28 28 - 28 28 28 - 28 28 28 - 28 28 28 - - - - -
M/E-Tilt 0/4 0/4 0/4 - - - - - 0/4 0/4 0/4 - 0/4 0/4 0/4 - 0/4 0/4 0/4 - 0/4 0/4 0/4 - 0/4 0/4 0/4 - 0/4 0/4 0/4 - - - - -
RET Yes Yes Yes - - - - - Yes Yes Yes - Yes Yes Yes - Yes Yes Yes - Yes Yes Yes - Yes Yes Yes - Yes Yes Yes - - - - -
TMA Yes Yes Yes - - - - - Yes Yes Yes - No No No - No No No - No No No - No No No - No No No - - - - -
Diplexer / Qty Exi/1 Exi/1 Exi/1 - - - - - Exi/1 Exi/1 Exi/1 - Exi/1 Exi/1 Exi/1 - Exi/1 Exi/1 Exi/1 - Exi/1 Exi/1 Exi/1 - Exi/1 Exi/1 Exi/1 - No No No - - - - -
Feeder Type 7/8" 7/8" 7/8" - - - - - 7/8" 7/8" 7/8" - 1/2" 1/2" 1/2" - 1/2" 1/2" 1/2" - 1/2" 1/2" 1/2" - 1/2" 1/2" 1/2" - 1/2" 1/2" 1/2" - - - - -
Feeder Length(m) 25 25 25 - - - - - 25 25 25 - 15 15 15 - 10 10 10 - 3 3 3 - 15 15 15 - 3 3 3 - - - - -
Feeder Loss 1.5 1.5 1.5 - - - - - 1.5 1.5 1.5 - 3 3 3 - 1.1 1.1 1.1 - 0.7 0.7 0.7 - 3 3 3 - 0.7 0.7 0.7 - - - - -
Dl/Ul Attenuation 15 15 15 - - - - - 15 15 15 - 30 30 30 - 11 11 11 - 7 7 7 - 30 30 30 - 7 7 7 - - - - -
Dl/Ul Feeder Delay 1110 1110 1110 - - - - - 1110 1110 1110 - 67.8 67.8 67.8 - 43.9 43.9 43.9 - 17.37 17.37 17.37 - 67.8 67.8 67.8 - 19 19 19 - - - - -
Technology G900 G1800 U900 U2100 FDD800 FDD1800 FDD2100 TDD2600 5G
Sector A B C D A B C D A B C D A B C D A B C D A B C D A B C D A B C D A B C D
Cabinet Type / Qty 1x 6101

RF Module Qty/ Typ 3x RUS01 [B8] [MM] - 3x RUS01[B8] [MM] 3x 2219 B1[MM] 3x 2217 [B20] 3x 2219 [B3] + 3x A2 [B3] 3x 2219 B1[MM] 3x RRUS72 [B41] -

Signature
4x20+ 4x20+ 4x20+
Power 40 40 30 - - - - - 40 40 40 - 40 40 40 - 2x40 2x40 2x40 - 2x80 2x80 2x80 - 2x40 2x40 2x40 - 2x20+ 2x20+ 2x20+ - - - - -
2x20 2x20 2x20

System Module Qty/Type 1x DUG + 1x R6471 1x 5212 1x 5216 + 1x R503 [LTE] -


BTS Information

08-Oct-23

08-Oct-23
CE (DL/UL) - 3 HUP 4 HUP [3 - Exi(150 Mbps) + 1 New- (150 Mbps)] -

BSS / EA 149

LAC / RAC or TAC - - - - -


Configuration 2 2 3 - - - - - 1 1 1 - 1 1 1 - 10MHz 20MHz 15MHz 60MHz -
IOT - - - - - - - - - - - - - - - - 1 1 1 - - - - - - - - - - - - - - - - -

Mohammed Abualqumboz

Salem AlMasri
4258-11C/12C/13C
4258-11A/12A/13A

4258-11B/12B/13B

Greshma
4258-03C

4258-01C

4258-02C
4258-03A

4258-03B

4258-01A

4258-01B

4258-02A

4258-02B
4258 C
4258 A

4258 B
42581

42582

42583

4258L
4258J

4258k

Cell ID
-

-
Scope 3x2219B1+dismantle 3xRUS 01 B1 + 1x PSU6302

Ericsson Approval

Mobily Approval
Ericsson Design
Comments

-Scope is L2100 Introduction under NEXT.


-L2100 will use the existing K80010291 V02 Antennas, new 2219 B1 radios & existing BB 5216+R503.
- Downgrade U2100 to 1 carrier.
- 3x RUS B1 will be dismantled.
SITE BILL OF MATERIALS
SITE ID 4258
MAIN PROJECT NEXT Project
SCOPE 3x2219B1+dismantle 3xRUS 01 B1 + 1x PSU6302
# BOQ ITEM Qty Type ITEM # Project Source
1 52xx/66xx/63xx HW Utilization Package (150 Mbps) 1 Hardware NK.RACN.BTSN.CHAS.00005.W.1 NEXT Project - LTE
2 Radio 2219 B1, (2100MHz), 10W+10W HWAC incl. 3 Hardware NK.RACN.BTSN.RRUY.00016 NEXT Project - LTE
3 Output Power HWAC 20W incr.steps (per RU) 15 Hardware NK.RACN.BTSN.RTUL.00093.W.6 NEXT Project - LTE
4 LTE-FDD Cell Carrier 5MHz B/W incr.step HWAC 9 Hardware NK.RACN.BTSN.RTUL.00095 NEXT Project - LTE
5 Apex LTE FDD SW 5MHz per-sector 9 Software NK.RACN.BSSC.AONS.00002.W.4 NEXT Project - LTE
6 Site Materials Bundle for 4G Macro Expansion 1 Hardware NK.RACN.BSSC.INML.00046 NEXT Project - LTE
7 Services - Replacemnet of existing (RRU/ERS) up to 16(RRU/ERS) in the site, including Jumpers replacement if needed 1 Service NK.SVCS.ACSV.ITCG.00050 NEXT Project - LTE
8 Services - LTE New Site Radio Network Design & Initial Tuning (LTE FDD), per Node 1 Service NK.SVCS.ACSV.EGAD.00046 NEXT Project - LTE
9 Services – 3G 4th Carrier Upgrade Radio network Design & Initial tuning, per node (Existing Cabinet) 1 Service NK.SVCS.ACSV.IIDP.00088 NEXT Project - LTE

You might also like