elements mounted on
the compressor,
Gearbox and Motor
2157596 shall be dual
elements (2 elements
in single housing)
with one wired and
other as spare.
The temperature
elements mounted on
the compressor,
Gearbox and Motor
2157597 shall be dual
elements (2 elements
in single housing)
with one wired and
other as spare.
The temperature
elements mounted on
the compressor,
Gearbox and Motor
2157598 shall be dual
elements (2 elements
in single housing)
with one wired and
other as spare.
The temperature
elements mounted on
the compressor,
Gearbox and Motor
2157599 shall be dual
elements (2 elements
in single housing)
with one wired and
other as spare.
The temperature
elements mounted on
the pump shall be
dual elements (2
2157600
elements in single
housing) with one
wired and other as
spare.
The temperature
elements mounted on
the pump shall be
dual elements (2
2157602
elements in single
housing) with one
wired and other as
spare.
The temperature
elements mounted on
the pump shall be
dual elements (2
2157604
elements in single
housing) with one
wired and other as
spare.
The temperature
elements mounted on
the pump shall be
dual elements (2
2157605
elements in single
housing) with one
wired and other as
spare.
The temperature
elements mounted on
the pump shall be
dual elements (2
2157606
elements in single
housing) with one
wired and other as
spare.
The temperature
elements mounted on
the pump shall be
dual elements (2
2157607
elements in single
housing) with one
wired and other as
spare.
Loading pump
selector switch
2158048
should be on R92
console
2158049 Typo error
Provide a little
summary on the
2158492
findings and if they
impact the scope!
Provide a little
summary on the
2158493
findings and if they
impact the scope!
Provide a little
summary on the
2158494
findings and if they
impact the scope!
Pending Contractor Implementation Markup Design Clarification Design Optimization
Constructability REP30002187 A
Constructability REP30002187 A
Constructability REP30002187 A
Agreed, a section will be added
Agreed, "contractor shall provide individual loop packages for each control loop with all the required documents to Saudi Aram
Noted, summary on the findings and impact to the scope will be added
Noted, summary on the findings and impact to the scope will be added
Noted, summary on the findings and impact to the scope will be added
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done