The temperature

elements mounted on
the compressor,
Gearbox and Motor
2157596 shall be dual
elements (2 elements
in single housing)
with one wired and
other as spare.

The temperature
elements mounted on
the compressor,
Gearbox and Motor
2157597 shall be dual
elements (2 elements
in single housing)
with one wired and
other as spare.

The temperature
elements mounted on
the compressor,
Gearbox and Motor
2157598 shall be dual
elements (2 elements
in single housing)
with one wired and
other as spare.

The temperature
elements mounted on
the compressor,
Gearbox and Motor
2157599 shall be dual
elements (2 elements
in single housing)
with one wired and
other as spare.
The temperature
elements mounted on
the pump shall be
dual elements (2
2157600
elements in single
housing) with one
wired and other as
spare.

The temperature
elements mounted on
the pump shall be
dual elements (2
2157602
elements in single
housing) with one
wired and other as
spare.

The temperature
elements mounted on
the pump shall be
dual elements (2
2157604
elements in single
housing) with one
wired and other as
spare.

The temperature
elements mounted on
the pump shall be
dual elements (2
2157605
elements in single
housing) with one
wired and other as
spare.

The temperature
elements mounted on
the pump shall be
dual elements (2
2157606
elements in single
housing) with one
wired and other as
spare.
The temperature
elements mounted on
the pump shall be
dual elements (2
2157607
elements in single
housing) with one
wired and other as
spare.

Full port valves if the


2158047 required CV is greater
than existing c

Loading pump
selector switch
2158048
should be on R92
console
2158049 Typo error

PIB building number


2158050
is in correct

The contractor shall


provide individual
loop packages for
each control loop
2158051
with all the required
documents to Saudi
Aramco for review
before testing

Provide a little
summary on the
2158492
findings and if they
impact the scope!

Provide a little
summary on the
2158493
findings and if they
impact the scope!

Provide a little
summary on the
2158494
findings and if they
impact the scope!
Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Optimization


Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Optimization


Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Preference

Pending Contractor Implementation Markup Design Clarification Design Error

Pending Contractor Implementation Markup Design Clarification Design Error

Pending Contractor Implementation Markup Design Clarification Design Error

Pending Contractor Implementation Markup Design Clarification Design Optimization

Pending Contractor Implementation Markup Design Clarification Design Preference

Pending Contractor Implementation Markup Design Clarification Design Preference

Pending Contractor Implementation Markup Design Clarification Design Preference


Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A


Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A


Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A

Life Safety or Asset Integrity REP30002187 A

Other (SARO Reviewer defined) REP30002187 A

Other (SARO Reviewer defined) REP30002187 A

Life Safety or Asset Integrity REP30002187 A

Constructability REP30002187 A

Constructability REP30002187 A

Constructability REP30002187 A
Agreed, a section will be added

Agreed, a section will be added

Agreed, a section will be added

Agreed, a section will be added


Agreed, a section will be added

Agreed, section will be added

Agreed, section will be added

Agreed, section will be added

Agreed, section will be added


Agreed, section will be added

Agree Full port valve shall be mentioned

Agreed, Loading pump selector will be considered on R92 console

Agreed, Typo will be corrected

Agreed, PIB building number will be corrected

Agreed, "contractor shall provide individual loop packages for each control loop with all the required documents to Saudi Aram

Noted, summary on the findings and  impact to the scope will be added

Noted, summary on the findings and  impact to the scope will be added

Noted, summary on the findings and  impact to the scope will be added
Done

Done

Done

Done
Done

Done

Done

Done

Done

Done

Not related to I&C

Not related to I&C

Not related to I&C