Professional Documents
Culture Documents
100
803
8755
703
F15045 PLT12*98 S275 2 181 0.083 3.3
100 603 100 7952
0
F15046 FLT12*200 S275 2 187 0.168 7.1
747
8755
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
803
8755
703
7730
8755
Loaded by: Date:
4280
4500
7660
8555
4280 220 3160 70 825 200 Checked by: Date:
0
8755
140
280
1480
2680
3880
5080
6280
7480
8680
140 140 1200 1200 1200 1200 1200 1200 1200 75
0
A F15046 BS H H G G H H H
F15057 BS 8 8 15001
8 B 8 D
50
45
45
40
35
298
35
298
40
45
45
50
178
8 120
178
8
8 8
H H H
H
60
8 8 8 8 60
120
A
60
0
60
60 F15059 BS
60
0
F15059 BS F15059 BS F15059 BS
B D G G F15012 H
F15012 F15012
60
F15012
60 60
D-D
60
891
2391
3891
5391
8755
50 50
7764
7704
8755
7704 60 991
0
F15141
128 135
45
298
45
178
120
60 60 60 60
60
60
60
0
G-G
50 50
F15141 BS
113
22
8
35
8
150 128
8
35
8
F15161
8
150 150
A-A
1 No. COLUMN REQUIRED AS DRAWN MARKED 15001 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15001]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
100
803
8755
15002 UC203*203*46 S355-JR 1 8755 10.574 397.5
703
100 603 100 7952
0
F15012 UB178*102*19 S355-JR 3 298 0.688 16.7
747
8755
F15161 FLT20*400 S275 1 400 0.352 25.1
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
8775 (UC203*203*46 x 8755) All Welds to be 6 FW. UNO
803
903
PHASE 1 QTY 1
8755
703
FABRICATION STATUS
8755
140
280
1480
2680
3880
5080
6280
7480
8680
Fabricated by: Date:
140 140 1200 1200 1200 1200 1200 1200 1200 75
0
7530
7660
7730
8755
4280
4500
7460
8555
Checked by: Date:
4280 220 2960 70 130 70 825 200
0
A C C E E C C C
8 50 50
F15057 BS 8 F15046 15002
8
8 B D
50
45
45
40
35
F15141
128 135
35
298
40
45
45
50
178
8
F15043 8
8
C C
8 B 8
120
8 8 C
A 298
60
60
60
0 F15059 BS
178
F15059 BS F15059 BS
D C E E F15012 C 120
60
F15012 F15012 60
60 60 60
60
0
2391
3891
5391
8755
E-E
7384
7473
7562
7651
7740
811
7295
8755
721
45
45
45
45
60 60 60
FITTING DETAIL
FITTING DETAIL
FITTING DETAIL 400
187 FITTING DETAIL
187
FITTING DETAIL 178 50 300 50
FITTING DETAIL 44 100 44
298 44 100 44
26 135 17
181 FITTING DETAIL
50
FITTING DETAIL
F15012
50 100 100 50
4 * Ø14 F15059
F15045 F15161 F15057
50 100 50
25
30 60
45
200
300
150
100
300
400
150
98
90
60
45
15
15
25
F15141
F15046 15 15 61 70 61
50
112 54
F15043
191
166
F15045
8
8
8 8
50
8 8
8
8
8 298
50
8
8 REV By Date By Date
178
60 13 CANYON ROAD
60
D-D
GR CONTRACTS FAX. 01698 374 667
1 No. COLUMN REQUIRED AS DRAWN MARKED 15002 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15002]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
100
803
903
8755
15003 UC203*203*46 S355-JR 1 8755 10.574 397.5
703
100 603 100 100 7852
0
F15012 UB178*102*19 S355-JR 3 298 0.688 16.7
747
8755
F15161 FLT20*400 S275 1 400 0.352 25.1
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
8775 (UC203*203*46 x 8755) All Welds to be 6 FW. UNO
803
903
PHASE 1 QTY 1
8755
703
FABRICATION STATUS
8755
140
280
1480
2680
3880
5080
6280
7480
8680
Fabricated by: Date:
140 140 1200 1200 1200 1200 1200 1200 1200 75
0
7530
7660
7730
8755
4280
4500
7460
8555
Checked by: Date:
4280 220 2960 70 130 70 825 200
0
A F15043 C C E E C C C
50 50
F15057 BS 8 8 15003
8 B 8 D
50
45
45
40
35
F15141
128 135
35
298
40
45
45
50
178
8
F15046 8
8
C C
8 B 8
120
8 8 C
A 298
60
60
60
0 F15059 BS
178
F15059 BS F15059 BS
D C E E F15012 C 120
60
F15012 F15012 60
60 60 60
60
0
2391
3891
5391
8755
E-E
7384
7473
7562
7651
7740
811
7295
8755
721
45
45
45
45
60 60 60
FITTING DETAIL
FITTING DETAIL
FITTING DETAIL 400
187 FITTING DETAIL
187
FITTING DETAIL 178 50 300 50
44 100 44 FITTING DETAIL
298 44 100 44
26 135 17
181 FITTING DETAIL
50
FITTING DETAIL
F15012
50 100 100 50
4 * Ø14 F15059
F15045 F15161 F15057
50 100 50
25
30 60
45
300
200
150
100
300
400
150
98
90
60
45
15
15
25
F15141
15 15 F15046 61 70 61
50
112 54
F15043
191
166
F15045
8
8
8 8
50
8 8
8
8
8 298
50
8
8 REV By Date By Date
178
60 13 CANYON ROAD
60
D-D
GR CONTRACTS FAX. 01698 374 667
1 No. COLUMN REQUIRED AS DRAWN MARKED 15003 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15003]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15004 UC203*203*46 S355-JR 1 8755 10.574 397.5
100
728
828
8755
0
F15046 FLT12*200 S275 2 187 0.168 7.1
100 628 100 7927
F15057 FLT10*90 S275 2 191 0.080 2.7
45
45
F15161 FLT20*400 S275 1 400 0.352 25.1
45
45
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
744 80 6880 60 991 All Welds to be 6 FW. UNO
0
744
824
7704
8755
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
7764
FINISH A
772 7983 LOT 15 QTY 1
PHASE 1 QTY 1
0
772
8755
FABRICATION STATUS
728
828
8755
0
4195
4395
4125
4325
4525
4595
7660
7730
8755
8555
F15045
4125 70 70 70 3065 70 825 200
0
50
F15046 BS 8
8
8
F15057 BS A C C 8
50
B 15004
8 8
C C C C C 8
8 8 8 8
50
45
45
45
8 8
35
B-B
35
45
45
45
50
8
8
B
8
A 8 C C C C C C C
128
145 135 1200 1200 1200 1200 1200 1200 1200 75
0
145
280
1480
2680
3880
5080
6280
7480
8680
8755
F15141
135
50 50
C-C
FITTING DETAIL
187
50 300 50
FITTING DETAIL 150 150
44 100 44
181 FITTING DETAIL
50
25
150
35
8
45
200
150
100
300
400
2 * Ø14
98
90
45
128
8
15
15
35
25
22
F15046 15 15 61 70 61 REV By Date By Date
50
26 135 17 8
113
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
191 F15141 BS 13 CANYON ROAD
178
50 50 NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
A-A TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. COLUMN REQUIRED AS DRAWN MARKED 15004 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15004]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15005 UC203*203*46 S355-JR 1 8755 10.574 397.5
100
728
828
128
8755
0
F15045 PLT12*98 S275 2 181 0.083 3.3
100 628 100 7927
F15141 F15046 FLT12*200 S275 1 187 0.084 3.5
135
50 50
45
45
45
F15141 FLT10*150 S275 9 178 0.540 18.9
45
45
45
Total 11.837 456.3
GENERAL NOTES
738 70 3443 82 2880 89 89 89 1015
All Holes to be 22 Dia UNO Slot hole length is to outside
0
738
808
4251
4333
7295
7384
7562
7740
8755
82 89 89
All Welds to be 6 FW. UNO
4415
7473
7651
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
772 7983 FINISH A
0
772
8755
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
728
828
8755
0
928
7530
4325
4395
7460
7660
7730
8755
8555
4325 70 3065 70 70 825 200
0
150 150
130 FITTING DETAIL
15005 F15161
F15057
A C C C C
45
F15057 BS 8
90
150
8
35
8 B F15046 C
45
8
8 8 C C
50
45
45
45
128
8
35
35
8
22
61 70 61
35
45
45
45
50
113
8 8 191
8
B 8
F15141 BS
A F15043 C C C C C C C 50 50
145 135 1200 1200 1200 1200 1200 1200 1200 75 A-A
8
0
145
280
1480
2680
3880
5080
6280
7480
8680
8755
F15045 8
8
50
8
8
8 8
50
8
8
8 8
8
FITTING DETAIL F15045
FITTING DETAIL
FITTING DETAIL 400 B-B
187
187
50 300 50
FITTING DETAIL 44 100 44
44 100 44
181 FITTING DETAIL
50
50 100 100 50
F15141 4 * Ø14
F15045 F15161
50 100 50
25
200
300
150
100
300
400
98
15
15
25
50
26 135 17
F15043 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
178 13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. COLUMN REQUIRED AS DRAWN MARKED 15005 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15005]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15006 UC203*203*46 S355-JR 1 8755 10.574 397.5
100
728
828
128
8755
0
928
F15045 PLT12*98 S275 2 181 0.083 3.3
100 628 100 7827
F15141 F15046 FLT12*200 S275 1 187 0.084 3.5
100
F15057 FLT10*90 S275 2 191 0.080 2.7
135
50 50
45
45
45
F15141 FLT10*150 S275 9 178 0.540 18.9
45
45
45
Total 11.837 456.3
GENERAL NOTES
738 70 3443 82 2880 89 89 89 1015
All Holes to be 22 Dia UNO Slot hole length is to outside
0
738
808
4251
4333
7295
7384
7562
7740
8755
82 89 89
All Welds to be 6 FW. UNO
4415
7473
7651
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
772 7983 FINISH A
0
772
8755
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
728
828
8755
0
928
7530
4325
4395
7460
7660
7730
8755
8555
4325 70 3065 70 70 825 200
0
150 150
130 FITTING DETAIL
F15043 F15161
15006 F15057
A D D D D
45
F15057 BS 8
90
150
8
35
B 8 D
45
8
8 8 D D
50
45
45
45
128
8
35
35
8
22
61 70 61
35
45
45
45
50
113
8 8 191
8
B 8
F15141 BS
A F15046
D D D D D D D 50 50
145 135 1200 1200 1200 1200 1200 1200 1200 75 A-A
8
0
145
280
1480
2680
3880
5080
6280
7480
8680
8755
F15045 8
8
50
8
8
8 8
50
8
8
8 8
8
FITTING DETAIL F15045
FITTING DETAIL
FITTING DETAIL 400 B-B
187
187
50 300 50
44 100 44 FITTING DETAIL
44 100 44
181 FITTING DETAIL
50
50 100 100 50
F15141 4 * Ø14
F15045 F15161
50 100 50
25
300
200
150
100
300
400
98
15
15
25
50
26 135 17
F15043 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
178 13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. COLUMN REQUIRED AS DRAWN MARKED 15006 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15006]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15007 UC203*203*46 S355-JR 1 3826 4.628 173.7
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
207
All Welds to be 6 FW. UNO
75
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
114 67 3646
Sawn by: Date:
0
114
180
3826
Fabricated by: Date:
50 50 100
15007
A B
F15047
8
8
100
100
8
8
8 8
8 8 8
8
8
F15044 8 A B 100
A-A B-B
2188
2098
3826
2098 90 1638
0
F15092
58
32
134
200
300
104
13 CANYON ROAD
10
1 No. BEAM REQUIRED AS DRAWN MARKED 15007 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15007]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15008 UC203*203*46 S355-JR 1 4401 5.321 199.8
203
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
79
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
FINISH A
LOT 15 QTY 1
4187 62 152 PHASE 1 QTY 1
0
4187
4249
4401
FABRICATION STATUS
8 8
100
100
8 8
8
8 8 8
8 8
8
A-A A B 8
100 50 50
B-B
1658
1568
4401
1568 90 2743
0
F15091
58
32
334
50 100 50
135
300
200
125
108
159 85
10
1 No. BEAM REQUIRED AS DRAWN MARKED 15008 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15008]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15009 UC203*203*46 S355-JR 1 3826 4.628 173.7
32
F15047 FLT12*200 S275 1 203 0.091 3.8
58
Total 4.995 188.5
206
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
75
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
FINISH A
F15099 LOT 15 QTY 1
2353 90 1383 PHASE 1 QTY 1
2353
2443
3826
FABRICATION STATUS
119
185
3826
Welded by: Date:
12 3826 12
50 50 100
15009
A B
F15047
8
8
100
100
8
8
5
8 8
8 8 8
8
8
F15044 8 A B 100
A-A B-B
FITTING DETAIL
FITTING DETAIL
203 FITTING DETAIL
203
241
52 100 52
52 100 52
F15099
50 100 100 50
199
203
50 100 50
300
200
334
56 75
135
107
F15047
10
F15044 70
0
119 122
56 66 119
1 No. BEAM REQUIRED AS DRAWN MARKED 15009 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15009]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15010 UC203*203*46 S355-JR 1 4401 5.321 199.8
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
32
58
202
79
F15100
1033 90 3278
0
1033
1123
4401
4183 61 158
0
4183
4244
4401
4425 (UC203*203*46 x 4401)
12 4401 12
100
15010
A B F15044
F15047
107
8 8
100
100
8 8
8
8 8 8
8 8
8
A-A A B 8
100 50 50
B-B
199
207
278
50 100 100 50
334
50 100 50
143
135
200
300
127
56
F15100
0
10
1 No. BEAM REQUIRED AS DRAWN MARKED 15010 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15010]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
11772
12977
14897
Mark Size Grade No. (mm) (m)2 (kg)
2322
3124
3372
6172
8972
2322 802 248 2800 2800 2800 1205 1919
0
15011 UB305*165*40 S355-JR 1 14897 18.703 592.2
13903
14648
1993
2132
2534
F15016 SHS140*140*5.0 S355-J2H 1 276 0.144 5.4
11582
11814
12787
13019
13813
14558
14897
1903
2364
3182
3414
5982
6214
8782
9014
1903 90 139 232 170 648 232 2568 232 2568 232 2568 232 973 232 794 90 655 90 248 F15021 SHS140*140*5.0 S355-J2H 1 270 0.143 5.3
0
F15023 SHS140*140*5.0 S355-J2H 1 367 0.171 6.3
F15162 136 136 136 136 136 136 F15024 SHS140*140*5.0 S355-J2H 3 330 0.476 17.6
90
90
F15026 SHS140*140*5.0 S355-J2H 1 420 0.198 7.3
70
F15027 SHS140*140*5.0 S355-J2H 1 384 0.175 6.5
8 F15162 8 F15162 8 F15031 UC152*152*23 S355-JR 3 212 0.591 14.4
1943 221 402 648 211 20 2569 2722 20 2742 58 239 966 1034 745 298 F15056 FLT10*80 S275 26 291 1.405 47.6
0
1943
2164
2566
3214
3425
6014
8737
11557
11614
11853
12819
13853
14598
14897
58 F15075 FLT10*150 S275 2 291 0.192 6.9
8814
F15076 FLT10*150 S275 2 291 0.192 6.9
3445
8757
5962 136 136 1273 7389
F15077 FLT10*150 S275 1 291 0.096 3.4
0
5962
6098
6234
7508
14897
F15085 FLT10*150 S275 1 417 0.136 4.9
GENERAL NOTES
11698
11860
3298
3433
8898
All Holes to be 22 Dia UNO Slot hole length is to outside
11564
14897
3132
8764
All Welds to be 6 FW. UNO
3132 167 134 5331 134 2666 134 162 3036
0
F15031 FINISH A
O
F15031 LOT 15 QTY 1
K K
F15024 PHASE 1 QTY 1
F15031
8 G H 8 L 8 N FABRICATION STATUS
F15024 F15056 BS F15023
F15077 F15025 F15024
F 8 Sawn by: Date:
5x F15056 BS
90 F15056 BS 8 F15076 BS F15075 BS Fabricated by: Date:
218
218
218
208
206
P F15056 BS F15040
A 8 8 T
109
55
55
55
55
55
55
55
72
46
70
8 8
K
Loaded by: Date:
90
90
90
90
90
90
90
82
82
70
60
K K 8 Checked by: Date:
60
8 8
8
90 70
8 8
499
532
15011
543
543
82
82
8 8 8
A 8 BE 8
8 8 8 P F15056 BS L 8 P R S T 90
F15040
4x F15056 BS 8 8
C D 8 F15021 Q O
A-A F15085 T-T
8 F15016
F15027 8 F15026
G 8 H N 8 8
B Q F15164
F 8
1903 90 139 232 170 648 232 2568 232 2568 232 2568 232 973 232 794 90 655 90 248
0
1903
1993
2132
2364
2534
3182
3414
5982
6214
8782
9014
11582
11814
12787
13019
13813
13903
14558
14648
14897
2322 802 248 2800 2800 2800 1205 1919
0
2322
3124
3372
6172
8972
11772
12977
14897
3102 153 8494 141 3007
0
3102
3255
11749
11890
14897
12 14897 12
80
F15004
F15051 F15051 F15051 F15164
55
55
55
55
55
72
46
F15051
130 130
35
90
90
90
90
15 55
60
60
F15051 F15051 F15051 F15051 8 F15051 F15051
8
F15051 F15051 F15004 F15051 F15051 F15051
8
130 130
F15051 80
F15051 E-E F15051 R-R S-S
F15164 P-P Q-Q
8
C-C D-D L-L
B-B
130 130
F15164
8
130 130
80
130 130
8
8 F15004
8 F15004
F15164 REV By Date By Date
55
90
80
WISHAW. ML2 0EG
K-K O-O TEL. 01698 374 666
F15004 F15004 GR CONTRACTS FAX. 01698 374 667
F15004 F15004
F15004
CLIENT: DATE CREATED:
130 130
19.08.2021
F15164
8
PROJECT: DRAWN BY:
Tekla Structures
H-H N-N
1 No. BEAM REQUIRED AS DRAWN MARKED 15011 CITIZENS THEATRE ESD LTD
80
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15011]
G-G
80
F-F
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
12977
14897
2322
3124
6172
8972
15012 UB305*165*40 S355-JR 1 14897 18.703 592.2
2322 802 3048 2800 4005 1919
0
F15004 PLT15*79.5 S355 10 283 0.552 26.2
55
13903
14648
2534
11582
11814
12787
13019
13813
14558
14897
F15024 SHS140*140*5.0 S355-J2H 3 330 0.476 17.6
2132
2364
3182
3414
5982
6214
8782
9014
90
2132 232 170 648 232 2568 232 2568 232 2568 232 973 232 794 90 655 90 248 F15025 SHS140*140*5.0 S355-J2H 1 374 0.173 6.4
0
F15004
F15027 SHS140*140*5.0 S355-J2H 1 384 0.175 6.5
136 136 136 136 136 136 8
F15028 SHS140*140*5.0 S355-J2H 1 595 0.270 10.0
F15004 8
F15029 SHS140*140*5.0 S355-J2H 1 370 0.170 6.3
90
90
F15030 SHS140*140*5.0 S355-J2H 1 699 0.312 11.6
70
F15032 UC152*152*23 S355-JR 2 187 0.349 8.4
1943 221 402 879 2569 2722 20 2722 20 296 966 1034 745 298 F15033 UC152*152*23 S355-JR 1 237 0.220 5.3
1943
2164
2566
3445
6014
8737
11537
11853
12819
13853
14598
14897
58
F15034 UC152*152*23 S355-JR 1 368 0.338 8.3
8814
O-O
8757
F15035 UC152*152*23 S355-JR 1 438 0.401 9.9
11557
F15040 FLT12*180 S355 2 343 0.272 11.6
5962 136 136 1249 7414
F15051 PLT10*79 S275 22 283 1.129 38.2
0
5962
6098
6234
7483
14897
F15056 FLT10*80 S275 26 291 1.405 47.6
14648
14558
14897
F15085 FLT10*150 S275 1 417 0.136 4.9
14558 90 248
0
11698
11860
3298
3433
8898
11564
14897
F15164 FLT20*180 S355 9 340 1.289 86.5
3132
8764
3132 167 134 5331 134 2666 134 162 3036 Total 27.658 948.4
0
J GENERAL NOTES
F15024 All Holes to be 22 Dia UNO Slot hole length is to outside
Q
F15033 L F15032 L All Welds to be 6 FW. UNO
F I M F15032 O F15023
8 H 8 8 All Steelwork Manufactured to:
G F15024
BS EN 1090-2: Execution Class EXC2 U.N.O.
F15025 F15056 BS F15024 F15056 BS F15004 BS FINISH A
10
8
5x F15056 BS LOT 15 QTY 1
8
15012 F15077 F15056 BS 8 P F15076 BS F15075 BS 8 PHASE 1 QTY 1
218
218
206
R F15056 BS
208
90 A C D E R S T U FABRICATION STATUS
55
55
55
55
55
55
55
72
46
8
J F15040
90
90
90
90
90
90
90
90
70
60
L L Fabricated by: Date:
60
70
82
499
501
82
8 8 Welded by: Date:
8 8
8
8 8
8 Loaded by: Date:
82
A E 8
8 R 8 8 M 4x F15056 BS 8 R S 8 T 8 U
82
8
F15085 8 Checked by: Date:
C D 8 8 Q
F15040 8
8 8 8 90
A-A 8 8
375
F F15027
8 U-U
485
8 F15029
80 F15034
B O
130 130
F15035
F15030
F15028 F15164
P 8
G
H I
130 130
F15164 B
8 1903 90 139 232 170 648 232 2568 232 2568 232 2568 232 973 232 794 90 993
0
1903
1993
2132
2364
2534
3182
3414
5982
6214
8782
9014
11582
11814
12787
13019
13813
13903
14897
80
B-B
130 130
J-J
2322 802 3048 2800 4005 1919
55
8
0
2322
3124
6172
8972
12977
14897
34 54
70 36
3102
3222
11775
11890
14897
90
80
C-C 3058 241 8400 240 2958
L-L
0
3058
3298
11698
11939
14897
F15051 BS
55
12 14897 12
130 130
90
8
F15051 BS
136 136
46
F15162 F15164
F15162 F15163
136
F15164
D-D
60
90 F15051
F15051 80
55
8
F15163 F15162 8 8 T-T P-P
8 8
90
130 130
F15051 F15051
55
90
E-E 8
55
55
F15004
55
F15164 F15051
8
REV By Date By Date
F15164
90
90
90
F15051 19.08.2021
F15051 PROJECT: DRAWN BY:
Tekla Structures
S-S 1 No. BEAM REQUIRED AS DRAWN MARKED 15012 CITIZENS THEATRE ESD LTD
Q-Q 80
80 CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
F-F G-G I-I 1 THIS IS IT'S OWN ASSEMBLY C427 [15012]
H-H
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15013 UB254*146*31 S355-JR 1 4046 4.358 124.4
1874
4046
F15064 FLT10*150 S275 1 235 0.078 2.8
1874 2171
0
F15070 FLT10*150 S275 1 150 0.051 1.8
70
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
2245
4046
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
4071 (UB254*146*31 x 4046)
Sawn by: Date:
2295
Loaded by: Date:
2205
4046
2205 90 1750 Checked by: Date:
0
56
90
90
8
60
8
70
70
8 8 8
367
8 8 8
130
F15070
70
8 8 8
8 8 8
B B-B
F15094
F15001
78
90
A
A-A
295 63 3688
0
295
357
4046
FITTING DETAIL
FITTING DETAIL FITTING DETAIL FITTING DETAIL
357 56
235 150 401
0
FITTING DETAIL
10
414
127 60 40 40 41 130 70 90 70
234
48 70 70
109
56 78 115
F15048 150
30 90 30
30 90 30
30 90 30
150
150
150
249
70
15
15
140
99
1 No. BEAM REQUIRED AS DRAWN MARKED 15013 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15013]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
2245
4046
15014 UB254*146*31 S355-JR 1 4046 4.358 124.4
2245 1800
0
F15001 FLT15*150 S275 1 401 0.137 7.1
2295
2205
4046
F15070 FLT10*150 S275 1 150 0.051 1.8
2205 90 1750
0
F15071 FLT10*150 S275 1 235 0.078 2.8
70
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
1875
4046
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
4071 (UB254*146*31 x 4046)
Sawn by: Date:
90
8
8
70
70
8 8 8
367
8 8 8
130
F15070
70
8 C-C
8
F15001
77
90 F15097
A B C
A-A
291 63 3691
0
291
354
4046
15
FITTING DETAIL
FITTING DETAIL FITTING DETAIL FITTING DETAIL
354 56
401 150 235
0
FITTING DETAIL 10 411
41 130 70 90 40 40 33 120 82 70
234
70 70
90
110
56 77 116
F15048
150
30 90 30
30 90 30
30 90 30
8
150
150
150
249
8
70
120
8
15
15
8 8
139
99
8
F15001 F15070 F15071 F15097
15 15 REV By Date By Date
1 No. BEAM REQUIRED AS DRAWN MARKED 15014 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15014]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15015 UB254*146*31 S355-JR 1 4621 4.976 142.1
2461
4621
F15064 FLT10*150 S275 1 235 0.078 2.8
2461 2160
0
F15070 FLT10*150 S275 1 150 0.051 1.8
70
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
1720
4621
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
4646 (UB254*146*31 x 4621)
Sawn by: Date:
1770
Loaded by: Date:
1680
4621
1680 90 2850 Checked by: Date:
0
90
8
60
8
70
70
8 8 8
363
8 8 8
130
F15070
90
70
8 8 8
8 8 8
A-A
F15001
82
B-B
F15093
A B
4220 58 343
0
4220
4278
4621
FITTING DETAIL
FITTING DETAIL FITTING DETAIL FITTING DETAIL
55 401
235 401 150
10
FITTING DETAIL 456
0
127 60 41 130 70 90 40 40
234 70
48 70 70 F15093
102
56 82 111
F15048
150
30 90 30
30 90 30
30 90 30
150
150
150
249
70
15
15
146
99
F15064 F15001 F15070
15 15
104
1 No. BEAM REQUIRED AS DRAWN MARKED 15015 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15015]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15016 UB254*146*31 S355-JR 1 4621 4.976 142.1
1720
4621
1720 2900 F15048 FLT10*70 S275 1 234 0.038 1.3
0
F15070 FLT10*150 S275 1 150 0.051 1.8
1770
F15071 FLT10*150 S275 1 235 0.078 2.8
1680
4621
F15098 PLT10*270 S275 1 453 0.188 6.9
1680 90 2850
0
Total 5.469 161.9
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
70
All Welds to be 6 FW. UNO
2461
4621
PHASE 1 QTY 1
FABRICATION STATUS
90
8
8
70
70
8 8 8
363
8 8 8
130
F15070
90
70
8 FITTING DETAIL
8
A-A 56 397
F15001
81
10
453
0
C-C
70
F15098
102
56 81 112
A B C
150
249
4224 58 339
147
0
4224
4282
4621
99
F15098
105
114 339
15
FITTING DETAIL FITTING DETAIL FITTING DETAIL
90
F15048
30 90 30
30 90 30
30 90 30
8
150
150
150
8
70
120
8
15
15
8 8
8 REV By Date By Date
F15070 F15001 F15071 MARK DESCRIPTION CREATED CHECKED
15 15 GR CONTRACTS LTD
13 CANYON ROAD
F15048
NETHERTON INDUSTRIAL ESTATE
B-B WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BEAM REQUIRED AS DRAWN MARKED 15016 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15016]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15017 UB254*146*31 S355-JR 1 4046 4.358 124.4
2505
4046
2505 1540 GENERAL NOTES
0
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
2555
2465
4046
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
2465 90 1490
0
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
70
Sawn by: Date:
15
Fabricated by: Date:
2288
4046
Loaded by: Date:
10 4046 15
3751
3688
4046
3688 63 294
0
A B C
F15094
90
F15002
193
116
15017 F15080
90 40 70
90
8
8
70
70
8 8 8
369
8 8 8
130
444
F15070
90
70
A-A
C-C
F15095
A B C
3715 66 265
0
3715
3781
4046
15
FITTING DETAIL FITTING DETAIL
FITTING DETAIL FITTING DETAIL FITTING DETAIL
56 330 358 56
551 150 239
10
54
70 40 70 70
110
114
56 77 116
56 75 118
F15048
150
150
30 90 30
30 90 30
30 90 30
70
150
150
249
249
150
70
15
15
139
135
99
99
15 15
70
118 114 B-B
1 No. BEAM REQUIRED AS DRAWN MARKED 15017 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15017]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15018 UB254*146*31 S355-JR 1 4621 4.976 142.1
1180
4621
1180 3440 GENERAL NOTES
0
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
1230
1140
4621
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
1140 90 3390
0
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
70
Sawn by: Date:
15
2012
4621
Loaded by: Date:
15 4621 10
401
4621
343
343 58 4220
0
A B C
F15093
F15002
193
90
8
8
70
70
8 8 8
365
8 8 8
130
444
F15070
70
C-C
90 F15096
A B C
A-A
309 61 4250
0
309
370
4621
15
FITTING DETAIL
10
426 457
40 40 41 130 70 130 70 70 121 70 48
234
54
70 70 40 F15093
102
106
56 81 112
56 79 114
F15048
150
150
30 90 30
30 90 30
30 90 30
70
150
150
249
249
150
70
15
15
146
143
99
99
10
15 15
70 B-B
110 105
1 No. BEAM REQUIRED AS DRAWN MARKED 15018 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15018]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15019 UB533*210*82 S355-JR 1 8404 15.758 681.5
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
2402
4302
6302
8302
8404
FINISH A
202
402
2202
4102
6102
8102
LOT 15 QTY 1
202 200 1800 200 1700 200 1800 200 1800 200 102
0
PHASE 1 QTY 1
FABRICATION STATUS
120
120
120
120
120
Sawn by: Date:
4302
6302
8302
8404
202
402
2202
4102
6102
8102
202 200 1800 200 1700 200 1800 200 1800 200 102
0
120
120
120
120
120
REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BEAM REQUIRED AS DRAWN MARKED 15019 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15019]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
1099
8693
15020 UB610*229*101 S355-JR 1 8693 18.234 870.3
1099 7594
0
F15041 FLT12*250 S355 2 643 0.685 30.3
1149
2294
4104
5844
1059
2204
4014
5754
8693
F15067 FLT10*150 S275 6 587 1.144 41.4
1059 90 1055 90 1720 90 1650 90 2849
0
F15068 FLT10*150 S275 1 587 0.191 6.9
GENERAL NOTES
70
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
2174
3984
5724
8693
FABRICATION STATUS
2244
4054
5794
8693
Welded by: Date:
4282
8693
8717 (UB610*229*101 x 8693)
68
2199 2204
2294 2299
4009 4014
4104 4109
5749 5754
5844 5849
F15127 7
8693
2199 5 90 5 1710 5 90 5 1640 5 90 5 2844 8
0
254
8
F15142 F15142
C D C A
60 56
F15142
8
8
8
105
105
105
F15067 BS 8
F15067 BS F15067
8 8
8 8
F15067 8 8 8 8
A 15020 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
8 B 8 8 8 8 8 8 8 8 8 8
56
56
90
F15049 F15049
60
60
80
8
8 8 8
120
8 8
89
89
°
.5
89
88
8
8
89
D-D
8
89
F15041
90
8 8 8 8 8 8 8 8 8 8 8 8 8 8
A-A 8 B 8 8 C 8 D 8 8 8
A 8
8
8 8 8 8 C 8 8 8 A
F15068 8
8
12 8693 12
68
F15127
254
FITTING DETAIL
FITTING DETAIL
FITTING DETAIL 643
587
60 56
60 56
FITTING DETAIL 587
98 89 89 89 89 89 100 FITTING DETAIL 8
8
479 60 573 385 120 82
FITTING DETAIL 2 15
48
F15142 2 * Ø14 F15049
80 90 80
25
30 90 30
30 90 30
15
8
150
108
150
250
150
100
2 * Ø14
60
8
15
15
25
F15127
F15049 F15068
F15067
254 F15049 F15049
15 15 F15041 132 105
17
8
254 8
°
.5
88
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
C-C WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BEAM REQUIRED AS DRAWN MARKED 15020 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15020]
147
14897
SHOP MATERIAL LIST FOR 1 ASSEMBLY
147 14750
0
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
14897
15021 UB610*229*101 S355-JR 1 14897 31.229 1491.4
147
14744
5824
6358
9158
F15003 PLT15*108.6 S355 10 573 1.437 72.8
147 5677 534 2800 5586 153
0
F15018 SHS140*140*5.0 S355-J2H 1 379 0.174 6.4
90
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
F15019 SHS140*140*5.0 S355-J2H 3 354 0.500 18.5
10
70
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
8
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 F15036 UC152*152*23 S355-JR 1 608 0.554 13.7
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
8 8
F15037 UC152*152*23 S355-JR 1 608 0.554 13.7
1243 13653
F15041 FLT12*250 S355 2 643 0.685 30.3
0
1243
14897
F15053 PLT10*108 S275 1 573 0.137 4.9
7390
14897
F15116 FLT10*60 S275 1 274 0.039 1.3
14921 (UB610*229*101 x 14897)
F15117 FLT10*60 S275 2 297 0.085 2.8
11768
12973
14673
14897
F15118 FLT10*60 S275 1 311 0.044 1.5
2318
3368
6168
8968
11628
12833
14533
2178
3228
6028
8828
F15119 FLT10*60 S275 2 327 0.093 3.1
2178 140 910 140 2660 140 2660 140 2660 140 1065 140 1560 140 223
0
14897
F15121 FLT10*60 S275 1 360 0.051 1.7
13977
14858
F15123 FLT10*60 S275 2 389 0.110 3.6
139
10076
10656
11257
11877
12477
13057
13657
14578
1340
1940
2520
3120
3740
4341
4921
5521
6141
6741
7257
7740
8256
8856
9476
519
139 380 820 600 580 600 620 600 580 600 620 600 515 484 515 600 620 600 580 600 620 600 580 600 320 600 280 39 F15124 FLT10*60 S275 1 405 0.057 1.9
0
450
F15125 8
437
437
8
421
421
405
405
389
389
F15134 FLT10*60 S275 1 313 0.045 1.5
374
374
358
358
100342
342
326
326
311
311
8
295
295
8
287
274
271
264
264
100
100
100
100
100
100
8 F15135 FLT10*60 S275 1 287 0.041 1.3
54
54
70 70 70
70 70 70
70 70 70
70 70 70
70 70 70
70 70 70
70
70
°
F15115
70 70
70 70
70 70
70 70
70 70
70 70
70 70
.5
F15145 FLT10*150 S275 2 311 0.205 7.3
°
°
88
.5
°
.5
.5
88
88
°
88
88
.5
88
88
.5
809
88
811
821
821
821
88
88
°
.5
.5
.5
88
.5
°
°
F15147 FLT10*150 S275 2 342 0.225 8.1
°
8
.5
F15081
°
70
70
70
70
70
70
70
F15148 FLT10*150 S275 2 374 0.245 8.8
88
8 8
°
.5
°
.5
8 8
.5
°
88
88
8
88
°
F15003 BS F15003 BS
.5
.5
8
88
88
°
°
8 8 F15150 FLT10*150 S275 2 405 0.265 9.5
.5
88
88
8 8 8
.5
88
H
.5
.5
°
°
8 F15019 8
.5
88
°
°
F15151 FLT10*150 S275 2 437 0.286 10.3
88
°
.5
A I
.5
°
.5
°
88
F15019 D
88
88
F15019 F15152 FLT10*150 S275 2 451 0.294 10.6
.5
°
F15018
.5
°
88
155 5677 534 2800 5586 145 F15155 FLT10*150 S275 2 295 0.195 7.0
0
155
5832
6365
9165
14752
14897
F15156 FLT10*150 S275 2 264 0.175 6.2
5824
6358
9158
14744
14897
F15164 FLT20*180 S355 5 340 0.716 48.0
1203
1293
14897
90 GENERAL NOTES
193
2248
12903
14897
BS EN 1090-2: Execution Class EXC2 U.N.O.
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
12 14897 12
FABRICATION STATUS
88
.5
Sawn by: Date:
°
11698
Fabricated by: Date:
3298
6098
8898
11562
11834
14897
3162
3434
5962
6234
8762
9034
Welded by: Date:
3162 136 2528 136 2528 136 2528 136 3062
0
90
90
90
Checked by: Date:
115
F15148
F15151
F15155 F15146
80
F15152 F15003
89
F15155
89
90 F15003
F15149
89
F15148
89
F15156 F15152 F15041
F15053 F15149
F15159
997
89
F15003 F15003
80
997
8 13 CANYON ROAD
89
70
8 90
130
130
8 8
70
GR CONTRACTS
18 52
130
8
90
130
F15041
130
130
130
Tekla Structures
F15164 1 No. BEAM REQUIRED AS DRAWN MARKED 15021 CITIZENS THEATRE ESD LTD
80 80
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
E-E F-F 1 THIS IS IT'S OWN ASSEMBLY C427 [15021]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size No. (mm) (m)2 (kg)
132
Grade
14897
15022 UB610*229*101 S355-JR 1 14897 31.229 1491.4
91
91 14765
0
F15003 PLT15*108.6 S355 10 573 1.437 72.8
41
F15009 UB610*229*101 S355-JR 2 1240 5.042 236.7
14897
F15010 UB610*229*101 S355-JR 1 1240 2.521 118.4
207
14744
5824
6358
9158
207 5617 534 2800 5586 153 F15018 SHS140*140*5.0 S355-J2H 1 379 0.174 6.4
0
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
F15037 UC152*152*23 S355-JR 1 608 0.554 13.7
45
1240
F15041 FLT12*250 S355 2 643 0.685 30.3
70
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
F15111 PLT10*201.4 S275 1 216 0.078 2.8
1115
7855 7042
F15115 FLT10*60 S275 2 266 0.076 2.5
0
7855
14897
F15116 FLT10*60 S275 1 274 0.039 1.3
125
100
F15117 FLT10*60 S275 2 297 0.085 2.8
0 25
25
F15118 FLT10*60 S275 1 311 0.044 1.5
14603
14897
F15121 FLT10*60 S275 1 360 0.051 1.7
11768
12973
14673
14897
F15124 FLT10*60 S275 1 405 0.057 1.9
2318
3368
6168
8968
11628
12833
14533
2178
3228
6028
8828
F15125 FLT10*60 S275 2 439 0.124 4.1
2178 140 910 140 2660 140 2660 140 2660 140 1065 140 1560 140 223
0
14897
F15126 F15131 F15129 FLT10*60 S275 2 272 0.078 2.5
F15153 F15125
13977
14858
F15150 F15131 FLT10*60 S275 1 451 0.064 2.1
139
10076
10656
11257
11877
12477
13057
13657
14578
1340
1940
2520
3120
3740
4341
4921
5521
6141
6741
7257
7740
8256
8856
9476
519
450
437
437
421
421
405
405
389
389
374
374
358
358
342
342
326
326
311
311
295
295
287
274
271
264
264
F15147 FLT10*150 S275 2 342 0.225 8.1
100
100
100
100
100
100
90
F15148 FLT10*150 S275 2 374 0.245 8.8
70 70 70
F15149 FLT10*150 S275 2 389 0.255 9.2
70 70 70
70 70 70
70 70 70
70 70 70
70 70 70
70 70 70
°
70 70
70 70
70 70
70 70
70 70
70 70
70 70
.5
88
°
D
.5
°
15022
88
88
°
.5
.5
88
88
809
811
88
821
821
821
88
.5
88
88
.5
°
.5
88
°
.5
°
.5
°
F15152 FLT10*150 S275 2 451 0.294 10.6
°
70
70
70
70
70
70
70
E F
88
88
F15153 FLT10*150 S275 2 421 0.275 9.9
88
.5
°
.5
8 8
.5
.5
°
°
°
8
°
F15003 BS 8
88
F15020 8 8
88
88
°
.5
F15122
°
.5
8 F15037 8 8 F15036
°
8
.5
88
88
.5
°
H F15155 FLT10*150 S275 2 295 0.195 7.0
88
88
.5
8 F15134
°
88
°
.5
.5
8
BA
.5
88
°
D 8 8
88
F15019
.5
F15019 F15157 FLT10*150 S275 2 272 0.180 6.4
°
°
.5
8 F G
88
88
F15164 FLT20*180 S355 5 340 0.716 48.0
.5
°
155 5677 534 2800 5586 145
Total 48.306 2221.4
0
155
5832
6365
9165
14752
14897
C GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
147 5677 534 2800 5586 153 All Welds to be 6 FW. UNO
0
147
5824
6358
9158
14744
14897
All Steelwork Manufactured to:
°
.5
I FINISH A
2248 10655 1994 LOT 15 QTY 1
PHASE 1 QTY 1
0
2248
12903
14897
FABRICATION STATUS
12863
12943
2208
2288
14897
2208 80 10575 80 1954 Loaded by: Date:
0
90
11698
3298
6098
8898
11562
11834
14897
3162
3434
5962
6234
8762
9034
1125
1125
3162 136 2528 136 2528 136 2528 136 3062
0
90
90
90
8
90 1125
F15111 90 1125
F15146 F15156
130
F15009 8 F15157
8 F15003
80
F15164 8 8
8
80
80
130
70
F15041
80
F15003 80 F15159
F15003 REV By Date By Date
70
89
D-D
89
70
89
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
997
8
120
8
89
89
8 8
8 8 13 CANYON ROAD
89
997
89
8 8 NETHERTON INDUSTRIAL ESTATE
89
8
8 8 WISHAW. ML2 0EG
89
8
130
130
130
GR CONTRACTS
130
8 8
F15003 F15010 8 FAX. 01698 374 667
F15041
70
70
8
70
18
8 8
CLIENT: DATE CREATED:
18 52
130
130
130
F15164 F15164 90 90
90 80 80
80
80 45 45 G-G I-I PROJECT: DRAWN BY:
Tekla Structures
E-E H-H
A-A
B-B C-C
F-F 1 No. BEAM REQUIRED AS DRAWN MARKED 15022 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15022]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15023 UB610*229*101 S355-JR 1 8693 18.234 870.3
2294
4104
5844
2204
4014
5754
8693
F15049 PLT10*108 S275 3 573 0.410 14.5
2204 90 1720 90 1650 90 2849
0
F15066 FLT10*150 S275 3 175 0.177 6.2
70
104
93
F15112 PLT10*156.9 S275 1 782 0.234 8.4
2244
4054
5794
8693
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
7969
8038
8693
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
4367 4327 FABRICATION STATUS
4367
8693
Sawn by: Date:
2244
4054
5794
8693
2244 1810 1740 2899
0
2294
4104
5844
2204
4014
5754
8693
F15084 F15067
2204 90 1720 90 1650 90 2849
0
8 8
8 F15066 8 F15066 F15066
8 8
A 15023 8 8 8 8 8 8 8 F15084 8 E
8 8 B 8 8 C 8 D 8
60 56 90
60 56
60 56
120
80
80
241
241
241
241
241
8
89 89 89 89 89
89 89 89 89 89
8
279
279
F15041
120
120
120
120
120
8
8
8
8
160
160
F15041
90 E-E
A-A 8 8 8 8 8 8 8 8 8 8 8
A 8 8 8 8 8 8 8 8 C 8 8 8 8 8 E
8 B 8 D
8
8
347 200 1800 200 1700 200 1800 200 1800 200 247
0
347
547
2347
2547
4247
4447
6247
6447
8247
8447
8693
2294
5844
2204
5754
8693
2204 90 3460 90 2849
0
F15112
8
70
70
FITTING DETAIL FITTING DETAIL FITTING DETAIL FITTING DETAIL FITTING DETAIL
56
40 160 279 60 573 479 60 67 60 162 98 89 89 89 89 89 100 17
8
48 48 48 8 8
8
8
60
F15082
30 90 30
30 90 30
30 90 30
8 8
80 90 80
37
88 58
8
150
108
150
150
108
58 99
12
157
8
250
15
15
15
70 F15049
D-D
F15082 F15082
56
56
60
13 CANYON ROAD
F15049 F15049 NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BEAM REQUIRED AS DRAWN MARKED 15023 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15023]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15024 UB610*229*101 S355-JR 1 8703 18.032 859.0
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
2299
4109
5849
2209
4019
5759
8703
LOT 15 QTY 1
2209 90 1720 90 1650 90 2854 PHASE 1 QTY 1
0
FABRICATION STATUS
70
Loaded by: Date:
4344 4358
0
4344
8703
8723 (UB610*229*101 x 8703)
2249
4059
5799
8703
2249 1810 1740 2904
0
2299
4109
5849
2209
4019
5759
8703
2209 90 1720 90 1650 90 2854
0
8703
108
8595
108 F15066 BS F15066 BS 108
0
8 8 8 8 8 8
8 15024 8 8 8 8 F15066 BS
A 8 8
8 B 8
8
8 B 8 C D 140
50
50
56
56
56
60
60
60
100
100
241
241
241
241
241
70 70 70 70 70 70
70 70 70 70 70 70
120
120
120
120
120
8
8
F15137 F15137
D-D
140
28
28
8 8 8 8 8 8 8 8 8 8
A-A A 8 8 B 8 8 8 8 B 8 8 8 C 8
D
108 108
0
108
8595
8703
351 200 1800 200 1700 200 1800 200 1800 200 251
0
351
551
2351
2551
4251
4451
6251
6451
8251
8451
8703
10 8703 10
60 56
8
FITTING DETAIL 8
8
50 70 70 70 70 70 70 50 8
162 67 60 8 8
8 8
48
8 8
F15082 8
30 140 30
F15082 8
30 90 30
200
108
150
15
F15066
F15137
15
B-B C-C
1 No. BEAM REQUIRED AS DRAWN MARKED 15024 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15024]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15025 CHS139.7*5.0 S355-J2H 1 4640 2.030 75.8
75
F15086 FLT10*180 S275 2 180 0.144 5.1
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
40
8
100
F15072
Checked by: Date:
40
8 F15086 8
8 F15072
70 60
FITTING DETAIL
180
FITTING DETAIL
180 40 40
100
40
180
160
50 70
1 No. BRACING REQUIRED AS DRAWN MARKED 15025 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15025]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15026 CHS139.7*5.0 S355-J2H 1 4329 1.894 70.7
GENERAL NOTES
75
8
Sawn by: Date:
FITTING DETAIL
180
40 40
FITTING DETAIL
100
F15086
40
180
160
50 70
1 No. BRACING REQUIRED AS DRAWN MARKED 15026 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15026]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15027 CHS139.7*5.0 S355-J2H 1 4725 2.067 77.2
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
8 F15086 8
8 F15072
70 60
FITTING DETAIL
180
40 40
FITTING DETAIL
100
F15086
40
180
160
50 70
1 No. BRACING REQUIRED AS DRAWN MARKED 15027 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15027]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15028 CHS139.7*5.0 S355-J2H 1 5030 2.201 82.2
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
75
All Welds to be 6 FW. UNO
40
8
Sawn by: Date:
100
F15072
Welded by: Date:
40
8 Checked by: Date:
8 F15072 60 70
FITTING DETAIL
180
FITTING DETAIL
180 40 40
100
40
180
160
50 70
F15086 F15072
REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BRACING REQUIRED AS DRAWN MARKED 15028 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15028]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15029 CHS139.7*5.0 S355-J2H 1 4515 1.976 73.8
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
F15086 All Welds to be 6 FW. UNO
40
8 8
Loaded by: Date:
100
F15072
40
8 8
8
70 60
FITTING DETAIL
180
FITTING DETAIL
180 40 40
100
160
50 70
GR CONTRACTS LTD
13 CANYON ROAD
F15072 NETHERTON INDUSTRIAL ESTATE
F15086
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BRACING REQUIRED AS DRAWN MARKED 15029 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15029]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15030 CHS139.7*5.0 S355-J2H 1 4263 1.865 69.6
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
8
Sawn by: Date:
FITTING DETAIL
180
40 40
FITTING DETAIL
100
F15086
40
180
160
50 70
1 No. BRACING REQUIRED AS DRAWN MARKED 15030 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15030]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15031 CHS139.7*5.0 S355-J2H 1 4649 2.034 76.0
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
F15086 All Welds to be 6 FW. UNO
8
Loaded by: Date:
8 8
8
70 60
FITTING DETAIL
180
40 40
FITTING DETAIL
100
F15086
REV By Date By Date
40
160
50 70
GR CONTRACTS LTD
13 CANYON ROAD
F15072 NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
180
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BRACING REQUIRED AS DRAWN MARKED 15031 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15031]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15032 CHS139.7*5.0 S355-J2H 1 4901 2.144 80.1
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
40
8
Sawn by: Date:
100
F15072
Welded by: Date:
40
8 8 Checked by: Date:
8 F15072 60 70
FITTING DETAIL
180
FITTING DETAIL
180 40 40
100
40
180
160
50 70
F15086 F15072
REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BRACING REQUIRED AS DRAWN MARKED 15032 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15032]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
1022
549
15033 UB178*102*19 S355-JR 1 1022 0.774 19.1
549 473
0
F15063 FLT10*140 S275 1 150 0.048 1.6
GENERAL NOTES
493
1022
FINISH A
LOT 15 QTY 2
PHASE 1 QTY 2
FABRICATION STATUS
1042 (UB178*102*19 x 1022)
Sawn by: Date:
50
Checked by: Date:
60 56
70
8
8
F15063 F15140
A B 90
A-A
B-B
140 178
40 40 58 70 50
60
REV By Date By Date
30 90 30
30 90 30
150
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
F15063 F15140 WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
2 No. BEAM REQUIRED AS DRAWN MARKED 15033 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15033]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
70 15034 UB178*102*19 S355-JR 1 884 0.670 16.5
470
884
470 414 Total 0.789 20.7
0
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
414
884
FABRICATION STATUS
15034
A A
70
F15079
A A 90
A-A
FITTING DETAIL
178
2 No. BEAM REQUIRED AS DRAWN MARKED 15034 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15034]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15035 UB178*102*19 S355-JR 1 846 0.641 15.8
344
846
344 502 FITTING DETAIL
0
F15069 FLT10*150 S275 1 248 0.082 2.9
248 F15104 PLT10*151.9 S275 1 242 0.068 2.4
68
89
846
38 120 90
68 21 757 F15113 FLT10*60 S275 1 254 0.036 1.2
0
F15142 FLT10*150 S275 1 254 0.084 3.0
30 90 30
F15104 Total 1.024 29.2
150
GENERAL NOTES
70
67
F15069 All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
115
8
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
FINISH A
88
FITTING DETAIL LOT 15 QTY 1
PHASE 1 QTY 1
8 63 180
64
FABRICATION STATUS
30
F15105 Sawn by: Date:
287 559
F15104
287
846
Fabricated by: Date:
68 63
70 28 748
57 95
152
Welded by: Date:
21
0
70
98
846
Loaded by: Date:
70 Checked by: Date:
73
866 (UB178*102*19 x 846)
130 113
10 846 10
242
161
846
161 685
0
A
FITTING DETAIL
50 50 F15113
150 66
105
8 40
8
F15142
15035
132
66
73 91
164
28
60 56
8
120
90
120
70
8
8
8 F15105
120
8
8 73 143
8
F15063
B 90
F15069 86 130 70
A B-B
90 216
A-A
140 254
FITTING DETAIL
40 40 132 105
15
60 17
4 * Ø14
25
F15113
30 90 30
15
150
100
60
1 No. BEAM REQUIRED AS DRAWN MARKED 15035 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15035]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15036 UB178*102*19 S355-JR 1 828 0.627 15.5
480
828
480 348 FITTING DETAIL
0
F15069 FLT10*150 S275 1 248 0.082 2.9
15 F15106 PLT10*161.8 S275 1 246 0.072 2.5
732
760
828
F15107 PLT10*165.3 S275 1 246 0.073 2.6
F15113
732 28 68 F15113 FLT10*60 S275 1 254 0.036 1.2
15
60
F15142 FLT10*150 S275 1 254 0.084 3.0
182
8 All Welds to be 6 FW. UNO
118
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
FINISH A
119
LOT 15 QTY 1
182
70 8
PHASE 1 QTY 1
FABRICATION STATUS
729
758
828
424 404 Loaded by: Date:
0
424
828
Checked by: Date:
10 828 10
142
828
142 685
0
180 66 66 180
A
5 45 5 40 42
F15142 F15113
45
105
66
66
74 91
70 91
8
162
165
29
28
8
68
70
15036
132
B F15107
F15106
87 159 162 84
60 56
8
120
90
120
8 8
8
70 70
8 116 130 130 116
120
8
8
8 246 246
F15063
A
F15069
A-A
B
90
B-B
30 90 30
13 CANYON ROAD
150
150
150
100
2 * Ø14
NETHERTON INDUSTRIAL ESTATE
25
1 No. BEAM REQUIRED AS DRAWN MARKED 15036 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15036]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15037 UB178*102*19 S355-JR 1 846 0.641 15.8
342
846
F15108 PLT10*181.1 S275 1 246 0.077 2.7
342 505 FITTING DETAIL
0
F15109 PLT10*136.5 S275 1 239 0.064 2.2
15
F15113 FLT10*60 S275 1 254 0.036 1.2
115
86
F15142 FLT10*150 S275 1 254 0.084 3.0
846
F15113
86 29 731
15
60
Total 1.033 29.5
GENERAL NOTES
F15108 254 All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
70
64
8 All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
119
FINISH A
FITTING DETAIL LOT 15 QTY 1
PHASE 1 QTY 1
248
113
FABRICATION STATUS
8 38 120 90 Sawn by: Date:
68
Fabricated by: Date:
30 90 30
F15109 Welded by: Date:
150
59 17 770 Loaded by: Date:
F15069
0
59
846
Checked by: Date:
76
285 561
0
285
846
FITTING DETAIL
246
10 846 10 42
FITTING DETAIL
161
846
F15108 179 61
161 685
0
66
91
181
29
24
90
86
A
70 F15109
50 50 F15113
59 61
73
137
17
39
105
8 130 116
8
F15142 80 159
15037
132
B
111 129
60 56
8
120
90
120
8 8
8 239
8
120
8
8 70
8
F15063
90 B 90
F15069
A-A A B-B
140 254
REV By Date By Date
150
100
1 No. BEAM REQUIRED AS DRAWN MARKED 15037 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15037]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15038 UB178*102*19 S355-JR 1 330 0.253 6.2
50 50
17 All Welds to be 6 FW. UNO
25
BS EN 1090-2: Execution Class EXC2 U.N.O.
150
100
2 * Ø14 FINISH A
LOT 3
25
15 QTY
F15158 PHASE 1 QTY 3
FABRICATION STATUS
330
134 197 2 15
0
15
B B
60
F15136
105
252
F15136
251
8
15038 8
FITTING DETAIL
60 56
162
8
8
8
8 62 60
40
8 F15065
B 8 B 90
30 90 30
150
B-B REV By Date By Date
10 330 10
MARK DESCRIPTION CREATED CHECKED
F15065 GR CONTRACTS LTD
13 CANYON ROAD
5° NETHERTON INDUSTRIAL ESTATE
91.
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
3 No. BEAM REQUIRED AS DRAWN MARKED 15038 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
3 THIS IS IT'S OWN ASSEMBLY C427 [15038]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15039 UB178*102*19 S355-JR 1 446 0.340 8.3
275
446
F15158 FLT10*150 S275 1 252 0.084 3.0
275 171 252
0
Total 0.563 16.0
25
F15158 45
150
100
All Steelwork Manufactured to:
8 BS EN 1090-2: Execution Class EXC2 U.N.O.
25
105
F15130 8 FINISH A
F15158
90 LOT 15 QTY 2
15039 PHASE 1 QTY 2
130
FABRICATION STATUS
60 56
60 56
Sawn by: Date:
8
8
8 8 Fabricated by: Date:
8 8
Welded by: Date:
F15065 F15063
A B Loaded by: Date:
A-A B-B
Checked by: Date:
10 446 10
140 162
FITTING DETAIL
40 40 62 60
15
60 40
F15130
30 90 30
30 90 30
15
150
150
60
F15063 F15065
252 REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
2 No. BEAM REQUIRED AS DRAWN MARKED 15039 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15039]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15040 UB178*102*19 S355-JR 1 428 0.326 8.0
275
428
F15158 FLT10*150 S275 1 252 0.084 3.0
275 152 15
0
Total 0.549 15.7
15
A B
60
All Holes to be 22 Dia UNO Slot hole length is to outside
5 45 5 All Welds to be 6 FW. UNO
F15158 45
252 All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
105
F15130 FINISH A
90 LOT 15 QTY 1
15040 PHASE 1 QTY 1
130
FABRICATION STATUS
FITTING DETAIL
60 56
60 56
140 Sawn by: Date:
8
8
8 8 Fabricated by: Date:
8 8 40 40
60 Welded by: Date:
F15065 F15063
A B Loaded by: Date:
30 90 30
A-A B-B
150
Checked by: Date:
10 428 10
F15063
162 252
62 60 130 105
40 17
2 * Ø14
25
30 90 30
150
150
100
2 * Ø14
25
F15065 F15158
REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BEAM REQUIRED AS DRAWN MARKED 15040 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15040]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15041 SHS140*140*5.0 S355-JR 1 4031 2.260 85.4
2240
4031
2240 1790 F15062 FLT10*50 S275 1 130 0.010 0.3
0
F15088 PLT10*270 S275 1 318 0.118 4.3
60
F15140 FLT10*150 S275-JR 1 178 0.060 2.1
10
Total 2.878 113.5
2185 1845
2185
4031
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
2245 1785 All Steelwork Manufactured to:
EXC2
0
2245
4031
BS EN 1090-2: Execution Class U.N.O.
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
4071 (SHS140*140*5.0 x 4031)
Sawn by: Date:
20 4031 20 Fabricated by: Date:
3810
3747
4031
Loaded by: Date:
3747 63 221
0
F15138
90
A
193
F15140 B
15041 50
115
F15160 8
8
70
8
220
220
8
8 FITTING DETAIL
258
8 8
8
333
178
B 8
F15160
8
80 58 70 50
A
A-A F15088 8
8 C-C
30 90 30
150
3769 67 195 C
0
3769
3836
4031
F15140
F15062
FITTING DETAIL FITTING DETAIL
FITTING DETAIL
56 262 284 56
300
50
FITTING DETAIL
FITTING DETAIL
318 340
40 220 40 75
50
10
F15013
70
0
FITTING DETAIL
B-B
80
80
109
115
56 78 115
56 75 118
F15138
40 80 40
F15062
160
249
249
120
50
F15013
140
134
F15089
0
70
123 195 221 119 REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BEAM REQUIRED AS DRAWN MARKED 15041 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15041]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15042 SHS140*140*5.0 S355-JR 1 4606 2.582 97.6
1710
4606
1710 2895 F15062 FLT10*50 S275 1 130 0.010 0.3
0
F15087 PLT10*270 S275 1 349 0.124 4.5
60
F15140 FLT10*150 S275-JR 1 178 0.060 2.1
10
Total 3.216 126.3
1655 2950
1655
4606
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
1715 2890 All Steelwork Manufactured to:
EXC2
0
1715
4606
BS EN 1090-2: Execution Class U.N.O.
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
4646 (SHS140*140*5.0 x 4606)
Sawn by: Date:
20 4606 20 Fabricated by: Date:
4606
Loaded by: Date:
259
259 58 4289
0
F15090 F15138
90 80
C
193
F15140 B
50
15042
111
8
8
FITTING DETAIL
70
8
220
220
8 178
8
254
8 8
8
333
58 70 50
8
F15160 B 8
8 F15160
8
C C-C
30 90 30
150
80 F15087
A-A F15140
A
231 62 4313
0
231
292
4606
F15062
50
FITTING DETAIL FITTING DETAIL
FITTING DETAIL F15013
292 56 56 317
300 B-B
FITTING DETAIL
FITTING DETAIL
349 373
40 220 40 75
50
0
70
10
102
80
107
56 82 111
56 79 114
F15138
40 80 40
F15062
160
249
249
120
50
F15013
147
142
F15087
10
1 No. BEAM REQUIRED AS DRAWN MARKED 15042 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15042]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15043 SHS140*140*5.0 S355-J2H 1 2944 1.651 62.4
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
15043
Sawn by: Date:
80 A A
A-A
20 2944 20
FITTING DETAIL
340
40 260 40
50 80 50
180
1 No. BRACING REQUIRED AS DRAWN MARKED 15043 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15043]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15044 SHS140*140*5.0 S355-J2H 1 1094 0.615 23.2
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
1134 (SHS140*140*5.0 x 1094)
All Welds to be 6 FW. UNO
260
8
Welded by: Date:
FITTING DETAIL
F15164
50 80 50
180
40 260 40
340
2 No. BRACING REQUIRED AS DRAWN MARKED 15044 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15044]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15045 SHS140*140*5.0 S355-J2H 1 3121 1.751 66.1
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
15045
Sawn by: Date:
80 A A
A-A
20 3121 20
FITTING DETAIL
340
40 260 40
50 80 50
180
1 No. BRACING REQUIRED AS DRAWN MARKED 15045 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15045]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15046 SHS140*140*5.0 S355-J2H 1 3270 1.834 69.3
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
A A
Sawn by: Date:
15046 Fabricated by: Date:
260
Loaded by: Date:
8
Checked by: Date:
A A 80
A-A
FITTING DETAIL
F15164
50 80 50
180
40 260 40
REV By Date By Date
340 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
2 No. BRACING REQUIRED AS DRAWN MARKED 15046 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15046]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15047 SHS140*140*5.0 S355-J2H 1 2952 1.656 62.6
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
A A
Sawn by: Date:
15047 Fabricated by: Date:
260
Loaded by: Date:
8
Checked by: Date:
A A 80
A-A
FITTING DETAIL
F15164
50 80 50
180
40 260 40
REV By Date By Date
340 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
6 No. BRACING REQUIRED AS DRAWN MARKED 15047 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
6 THIS IS IT'S OWN ASSEMBLY C427 [15047]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15048 SHS140*140*5.0 S355-J2H 1 3329 1.867 70.6
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
15048
Sawn by: Date:
80 A A
A-A
20 3329 20
FITTING DETAIL
340
40 260 40
50 80 50
180
2 No. BRACING REQUIRED AS DRAWN MARKED 15048 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15048]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15049 SHS140*140*5.0 S355-J2H 1 2907 1.631 61.6
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
A A
Sawn by: Date:
15049 Fabricated by: Date:
260
Loaded by: Date:
8
Checked by: Date:
A A 80
A-A
FITTING DETAIL
F15164
50 80 50
180
40 260 40
REV By Date By Date
340 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BRACING REQUIRED AS DRAWN MARKED 15049 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15049]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15050 SHS140*140*5.0 S355-J2H 1 3247 1.821 68.8
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
A A
Sawn by: Date:
15050 Fabricated by: Date:
260
Loaded by: Date:
8
Checked by: Date:
A A 80
A-A
FITTING DETAIL
F15164
50 80 50
180
40 260 40
REV By Date By Date
340 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
2 No. BRACING REQUIRED AS DRAWN MARKED 15050 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15050]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15051 SHS140*140*5.0 S355-J2H 1 1235 0.694 26.2
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
1275 (SHS140*140*5.0 x 1235)
All Welds to be 6 FW. UNO
FABRICATION STATUS
260
8
20 1235 20
FITTING DETAIL
340
40 260 40
50 80 50
180
F15164
2 No. BRACING REQUIRED AS DRAWN MARKED 15051 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15051]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15052 SHS140*140*5.0 S355-J2H 1 2594 1.455 55.0
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
15052
Sawn by: Date:
80 A A
A-A
20 2594 20
FITTING DETAIL
340
40 260 40
50 80 50
180
1 No. BRACING REQUIRED AS DRAWN MARKED 15052 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15052]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15053 SHS140*140*5.0 S355-J2H 1 3171 1.779 67.2
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
15053
Sawn by: Date:
80 A A
A-A
20 3171 20
FITTING DETAIL
340
40 260 40
50 80 50
180
1 No. BRACING REQUIRED AS DRAWN MARKED 15053 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15053]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15054 SHS140*140*5.0 S355-J2H 1 2449 1.374 51.9
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
A A
Sawn by: Date:
15054 Fabricated by: Date:
260
Loaded by: Date:
8
Checked by: Date:
A A 80
A-A
FITTING DETAIL
F15164
50 80 50
180
40 260 40
REV By Date By Date
340 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BRACING REQUIRED AS DRAWN MARKED 15054 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15054]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15055 UC152*152*23 S355-JR 1 2457 2.222 55.5
GENERAL NOTES
1988
FITTING DETAIL
1918
2457
All Holes to be 22 Dia UNO Slot hole length is to outside
1918 70 469 All Welds to be 6 FW. UNO
0
352
45
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
40 136 136 40
FINISH A
45
LOT 15 QTY 1
PHASE 1 QTY 1
45 90 45
FABRICATION STATUS
180
2481 (UC152*152*23 x 2457) Sawn by: Date:
F15038
Fabricated by: Date:
12 2457 12
Welded by: Date:
45 45 Loaded by: Date:
F15162 A B
15055 FITTING DETAIL Checked by: Date:
136
136
F15162
8
45 90 45
8 8
8
136
136
180
8
8
8
A B F15038
45 45
B-B 40 136 136 40
A-A
352
2006
1936
2076
2457
1936 70 381
0
70
45
45
1 No. COLUMN REQUIRED AS DRAWN MARKED 15055 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15055]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15056 UC152*152*23 S355-JR 1 2457 2.222 55.5
GENERAL NOTES
2006
FITTING DETAIL
1936
2076
2457
All Holes to be 22 Dia UNO Slot hole length is to outside
1936 70 381 All Welds to be 6 FW. UNO
0
F15162
70
45
45 90 45
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
180
FINISH A
45
LOT 15 QTY 1
PHASE 1 QTY 1
40 136 136 40 FABRICATION STATUS
136
8
8 8 30 136 136 30
8
136
136
8
8
8
45 90 45
45 45 A B F15039
180
A-A B-B
F15039
1988
1918
2457
1918 70 469
0
45
45
1 No. COLUMN REQUIRED AS DRAWN MARKED 15056 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15056]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15057 UC152*152*23 S355-JR 1 2482 2.245 56.0
GENERAL NOTES
2031
FITTING DETAIL
1961
2101
2482
All Holes to be 22 Dia UNO Slot hole length is to outside
1961 70 381 All Welds to be 6 FW. UNO
0
352
70
45
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
40 136 136 40
FINISH A
45
LOT 15 QTY 1
PHASE 1 QTY 1
45 90 45
FABRICATION STATUS
180
2506 (UC152*152*23 x 2482) Sawn by: Date:
F15038
Fabricated by: Date:
12 2482 12
Welded by: Date:
45 45 Loaded by: Date:
F15162 A B
15057 FITTING DETAIL Checked by: Date:
136
136
F15162
8
45 90 45
8 8
8
136
136
180
8
8
8
A B F15038
45 45
B-B 40 136 136 40
A-A
352
2013
1943
2482
1943 70 469
0
45
45
1 No. COLUMN REQUIRED AS DRAWN MARKED 15057 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15057]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15058 UC152*152*23 S355-JR 1 2432 2.200 54.9
GENERAL NOTES
1963
FITTING DETAIL
1893
2432
All Holes to be 22 Dia UNO Slot hole length is to outside
1893 70 469 All Welds to be 6 FW. UNO
0
332
45
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
30 136 136 30
FINISH A
45
LOT 15 QTY 1
PHASE 1 QTY 1
45 90 45
FABRICATION STATUS
180
2456 (UC152*152*23 x 2432) Sawn by: Date:
F15039
Fabricated by: Date:
12 2432 12
Welded by: Date:
45 45 Loaded by: Date:
F15162 A B
15058 FITTING DETAIL Checked by: Date:
136
136
F15162
8
45 90 45
8 8
8
136
136
180
8
8
8
45 45 A B F15039
40 136 136 40
A-A B-B
352
1981
1911
2051
2432
1911 70 381
0
70
45
45
1 No. COLUMN REQUIRED AS DRAWN MARKED 15058 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15058]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15059 UC152*152*23 S355-JR 1 2946 2.663 66.5
8 FABRICATION STATUS
8
8
8 8 Sawn by: Date:
136
136
8 8
Fabricated by: Date:
352 F15163
45 90 45
180
40 136 136 40
45 90 45
96 136 40
180
272
F15038
1 No. COLUMN REQUIRED AS DRAWN MARKED 15059 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15059]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15060 UC152*152*23 S355-JR 1 2876 2.599 64.9
136
Sawn by: Date:
8
8
8 Fabricated by: Date:
8 8
136
352 F15163
45 90 45
180
40 136 136 40
45 90 45
40 136 96
180
272
F15038 REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. COLUMN REQUIRED AS DRAWN MARKED 15060 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15060]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15061 UC152*152*23 S355-JR 1 2237 2.014 50.2
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
1080
2237
BS EN 1090-2: Execution Class EXC2 U.N.O.
1080 1157
0
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
60
70
Sawn by: Date:
60
Fabricated by: Date:
1264
2237
Loaded by: Date:
2237
2163
74 60
15061 F15050
A B
8
8
100
100
8
8 8
60
60
8 8 8
8 8 8
8
F15073
B F15074
90 F15055 F15055 74
A B-B
2163
2237
A-A
221
311
1221
1311
2237
10 2237 10
FITTING DETAIL
FITTING DETAIL FITTING DETAIL
194
152 152
FITTING DETAIL
100 94
46 46 46 46
139
60 60
F15050
35 90 35
30 90 30
30 30
160
120
150
73
60
15
15
F15074 F15073
F15055
15 15
1 No. BEAM REQUIRED AS DRAWN MARKED 15061 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15061]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15062 UC152*152*23 S355-JR 1 2882 2.596 64.8
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
1555
2882
BS EN 1090-2: Execution Class EXC2 U.N.O.
1555 1327
0
FINISH A
LOT 15 QTY 1
60 60
PHASE 1 QTY 1
70
FABRICATION STATUS
249
1449
2733
2882
Welded by: Date:
74
0
60
100
100
100
8 8 8
8 8 8
8 8 8
8 8 8
F15050
F15074
A-A 74 A 3x F15055 NS B F15050
0
74
B-B
206 90 1110 90 1125 90 171
0
206
296
1406
1496
2621
2711
2882
10 2882 10
FITTING DETAIL
FITTING DETAIL FITTING DETAIL
194
152 152
FITTING DETAIL
100 94
46 46 46 46
139
60 60
F15050
35 90 35
30 90 30
30 30
160
150
120
73
60
15
15
F15073 F15074
F15055
15 15
1 No. BEAM REQUIRED AS DRAWN MARKED 15062 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15062]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15063 UC152*152*23 S355-JR 1 3522 3.164 79.0
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
1723
3522
1723 1799 FITTING DETAIL
0
194
60 60
60 60
70
100 94
35 90 35
199 1200 1200 923
160
0
199
1399
2599
3522
F15055
3522
FITTING DETAIL
74
3448
74 8 74 60 152
0
60
100
100
100
F15050
8
30 30
8
8
120
60
8
F15074
B F15074 F15074
8
60 74 A 8
74 B-B
0
74
3448
3522
A-A
3x F15055 NS
156
246
1356
1446
2556
2646
3522
10 3522 10
15
15
1 No. BEAM REQUIRED AS DRAWN MARKED 15063 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15063]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
144
84
2894
Length Area Weight
84 60 2750 Mark Size Grade No. (mm) (m)2 (kg)
0
15064 UC152*152*23 S355-JR 1 2894 2.616 65.3
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
154
94
2894
15064
Sawn by: Date:
94 60 2741 45 45
0
35
30
35
8 8
A F15042
60
F15061
A-A
75 2819
0
75
2894
FITTING DETAIL FITTING DETAIL
192 100
61 70 61 50
REV By Date By Date
50
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
45 90 45
50
160
60
1 No. COLUMN REQUIRED AS DRAWN MARKED 15064 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15064]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15065 UC152*152*23 S355-JR 1 2872 2.596 64.8
122
62
2872
62 60 2750 Total 2.675 68.1
0
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
45 45
FABRICATION STATUS
2884 (UC152*152*23 x 2872)
Sawn by: Date:
2872
15065
72 60 2741 45 45
0
35
30
8
8
8 8
30
35
8 8
A F15042
A-A
FITTING DETAIL
192
61 70 61
REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
45 90 45
13 CANYON ROAD
180
1 No. COLUMN REQUIRED AS DRAWN MARKED 15065 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15065]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15066 UC152*152*23 S355-JR 1 2457 2.222 55.5
GENERAL NOTES
1988
FITTING DETAIL
1918
2457
All Holes to be 22 Dia UNO Slot hole length is to outside
1918 70 469 All Welds to be 6 FW. UNO
0
332
45
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
30 136 136 30
FINISH A
45
LOT 15 QTY 1
PHASE 1 QTY 1
45 90 45
FABRICATION STATUS
180
2481 (UC152*152*23 x 2457) Sawn by: Date:
F15039
Fabricated by: Date:
12 2457 12
Welded by: Date:
45 45 Loaded by: Date:
F15162 A B
15066 FITTING DETAIL Checked by: Date:
136
136
F15162
8
45 90 45
8 8
8
136
136
180
8
8
8
45 45 A B F15039
40 136 136 40
A-A B-B
352
1988
1918
2457
1918 70 469
0
45
45
1 No. COLUMN REQUIRED AS DRAWN MARKED 15066 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15066]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15067 UC152*152*23 S355-JR 1 2681 2.424 60.5
GENERAL NOTES
2212
FITTING DETAIL
2142
2681
All Holes to be 22 Dia UNO Slot hole length is to outside
2142 70 469 All Welds to be 6 FW. UNO
0
332
45
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
30 136 136 30
FINISH A
45
LOT 15 QTY 1
PHASE 1 QTY 1
45 90 45
FABRICATION STATUS
180
2705 (UC152*152*23 x 2681) Sawn by: Date:
F15039
Fabricated by: Date:
12 2681 12
Welded by: Date:
45 45 Loaded by: Date:
F15038 A B
15067 FITTING DETAIL Checked by: Date:
136
136
352
8 8
8 8 8 8
136
136
8 8 40 136 136 40
8 8
8 8
45 45 A B
45 90 45
F15039
180
A-A B-B
F15038
2212
2142
2681
2142 70 469
0
45
45
1 No. COLUMN REQUIRED AS DRAWN MARKED 15067 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15067]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
2212
15068 UC152*152*23 S355-JR 1 2681 2.424 60.5
2142
2681
2142 70 469 F15039 FLT12*180 S355 2 332 0.264 11.3
45
Total 2.688 71.8
GENERAL NOTES
45
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
8
8
8 8 8 Checked by: Date:
8 8
45 45 A A
A-A
2212
2142
2681
2142 70 469
0
45
45
FITTING DETAIL
332
1 No. COLUMN REQUIRED AS DRAWN MARKED 15068 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15068]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15069 UC152*152*23 S355-JR 1 2482 2.245 56.0
GENERAL NOTES
2013
FITTING DETAIL
1943
2482
All Holes to be 22 Dia UNO Slot hole length is to outside
1943 70 469 All Welds to be 6 FW. UNO
0
332
45
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
30 136 136 30
FINISH A
45
LOT 15 QTY 1
PHASE 1 QTY 1
45 90 45
FABRICATION STATUS
180
2506 (UC152*152*23 x 2482) Sawn by: Date:
F15039
Fabricated by: Date:
12 2482 12
Welded by: Date:
45 45 Loaded by: Date:
F15162 A B
15069 FITTING DETAIL Checked by: Date:
136
136
F15162
8
45 90 45
8 8
8
136
136
180
8
8
8
45 45 A B F15039
40 136 136 40
A-A B-B
352
2013
1943
2482
1943 70 469
0
45
45
1 No. COLUMN REQUIRED AS DRAWN MARKED 15069 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15069]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
4334
8697
15070 UB457*152*52 S355-JR 1 8697 13.009 449.0
4334 4363
0
F15052 PLT10*72 S275 2 428 0.142 4.8
70
Total 13.731 474.7
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
2501 2760 3436 All Welds to be 6 FW. UNO
2501
5261
8697
All Steelwork Manufactured to:
BS EN 1090-2: Execution Class EXC2 U.N.O.
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
8717 (UB457*152*52 x 8697) FABRICATION STATUS
2296
6096
Welded by: Date:
2206
6006
8697
2206 90 3710 90 2601
0
2551
5311
2461
5221
8697
15070 F15052 F15052
2461 90 2670 90 3386
0
8
A 8 A
54
54
90
90
80
70
70
8
8
70
70
70 70 70 70
70
70
8
8
70
70
8
8
F15083
90
8 8
A-A F15078 F15078 8 8
A A
2551
5311
2461
5221
8697
2461 90 2670 90 3386
0
70
70
FITTING DETAIL FITTING DETAIL
438 450
FITTING DETAIL
320 70 48 90 70 70 70 70 80
428
30 90 30
150
72
15
15
13 CANYON ROAD
F15052 NETHERTON INDUSTRIAL ESTATE
F15078 F15083
15 15 WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
1 No. BEAM REQUIRED AS DRAWN MARKED 15070 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15070]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
6194
6074
6435
15071 UC305*305*158 S355-JR 1 6435 12.057 1007.2
6074 120 241
0
F15008 UB610*229*101 S355-JR 1 997 2.114 99.8
6355
6435
6285
F15015 SHS140*140*5.0 S355-J2H 1 341 0.163 6.0
6285 70 80
0
F15017 SHS140*140*5.0 S355-J2H 1 291 0.149 5.5
90 90
F15158 FLT10*150 S275 2 252 0.167 5.9
200
F15165 FLT30*350 S355 1 367 0.300 30.3
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
419
All Welds to be 6 FW. UNO
200
LOT 15 QTY 1
PHASE 1 QTY 1
FABRICATION STATUS
216
50
45
Sawn by: Date:
45
50
8
8
Welded by: Date:
45 6435 252
5985
6125
6265
6435
5915
6055
6195
6335
5915 70 70 70 100
0
70 70 70
3079
5999
6088
6177
6266
6355
6435
3019
5910
3019 60 2831 89 89 89 89 89 80
0
D
C 50 50
997
140
8
8 856
F15130
752
140
F15136 88
.5
°
105 40 40
7
F15008
530
B 15071
105
0
45
45
45
45
130
387
402
8 8
8 D
130
F15165
A 8
251 D-D
90
12 F15164
4
F15017 F15015
B AC
93
223
425
6435
C-C
60 60
B-B
2973
3055
5999
6088
6177
6266
6355
6435
F15041
2891
5910
2891 82 82 2855 89 89 89 89 89 80
0
F15158
8 8
8 8 F15158
45
45
45
45
8
8
8
8
F15011
GR CONTRACTS FAX. 01698 374 667
1 No. COLUMN REQUIRED AS DRAWN MARKED 15071 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15071]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15072 UC305*305*158 S355-JR 1 6435 12.057 1007.2
50
45
F15158 FLT10*150 S275 2 252 0.167 5.9
45
50
F15165 FLT30*350 S355 1 367 0.300 30.3
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
6732 (UC305*305*158 x 6435) All Welds to be 6 FW. UNO
5985
6125
6265
6435
PHASE 1 QTY 1
5915
6055
6195
6335
5915 70 70 70 100
0
FABRICATION STATUS
70 70 70
Sawn by: Date:
140
8
856
F15008
F15130
752
140
F15136
88
.5
°
105
530
B 15072
105
F15165 0
45
45
90
12
4
45
45
93
387
C
402
A
8 D D-D
8
251
8
F15015
60 60
B F15017 3019 60 2831 89 89 89 89 89 80
B-B
0
3019
5910
3079
5999
6088
6177
6266
6355
6435
A
C
223 202 6010
0
223
425
6435
2973
3055
5999
6088
6177
6266
6355
6435
2891
5910
2891 82 82 2855 89 89 89 89 89 80
0
F15041 8
8
F15158
45
45
45
45
8
F15158
8
8
8
40 40
130 130
F15164
40 40 1 No. COLUMN REQUIRED AS DRAWN MARKED 15072 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
A-A ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15072]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
6355
40 40
15073 UC305*305*158 S355-JR 1 6465 12.113 1011.9
6285
6285 70 F15005 UB305*165*40 S355-JR 1 797 1.010 31.7
0
F15006 UB610*229*101 S355-JR 1 1237 2.617 123.9
2973
3055
5999
6088
6177
6266
6355
F15007 UB610*229*101 S355-JR 1 797 1.695 79.8
2891
5910
F15164
F15014 SHS140*140*5.0 S355-J2H 1 337 0.162 6.0
2891 82 82 2855 89 89 89 89 89
0
F15022 SHS140*140*5.0 S355-J2H 1 284 0.147 5.4
130 130
1237
1212
25
F15040 FLT12*180 S355 1 343 0.136 5.8
100
8
90
1112
F15041 FLT12*250 S355 1 643 0.343 15.1
1112
1125
C-C F15114 FLT10*60 S275 1 214 0.031 1.0
45
45
0 F15142 FLT10*150 S275 2 254 0.169 6.0
45
45
F15143 FLT10*150 S275 1 214 0.072 2.5
421
6475
231
FABRICATION STATUS
0 231 190 6054
Sawn by: Date:
6465 6475
Fabricated by: Date:
B
F15022
F15014
130
8 D E F15127 68 116 124
15073
A
403
388
F15165 C
F15114
45
45
90
8
12 8
8 F15139
4
7
45
45
68
93
797
8 ° 8 797 797
.5
88
113
90
60 60 B 8 F15110 707
690 684
17
647
37
B-B 8 F15054 8
254
646
690
F15113
647
150
F15005 8
150
8
0
0 0
F15007 1087 150
1087
1237
D E 100 100
184
E-E
2740 70 70 2890 89 89 89 89 89 120 D-D
0
2740
2810
2950
5910
5999
6088
6177
6266
6355
70 70 6475
2880
3020
3100 3335 40
0
3100
6435
6475
89 89 89 89 89 80 132 105
8
8
82 82 70 8
F15041 8
8 8 F15143
8 8
50
45
45
50
8
8 8 F15142
F15040 8
8
8
REV By Date By Date
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
F15164 NETHERTON INDUSTRIAL ESTATE
F15006
WISHAW. ML2 0EG
130 130
40 40 1 No. COLUMN REQUIRED AS DRAWN MARKED 15073 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
A-A ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15073]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15074 UC305*305*158 S355-JR 1 6465 12.113 1011.9
2973
3055
5999
6177
6355
2891
5910
6088
6266
F15007 UB610*229*101 S355-JR 1 797 1.695 79.8
2891 82 2855 89 89 89
0
F15014 SHS140*140*5.0 S355-J2H 1 337 0.162 6.0
82 89 89
F15022 SHS140*140*5.0 S355-J2H 1 284 0.147 5.4
130
F15040 FLT12*180 S355 1 343 0.136 5.8
45
45
F15102 PLT10*190.6 S275 1 217 0.074 2.6
45
45
F15113 FLT10*60 S275 1 254 0.036 1.2
GENERAL NOTES
231
421
6475
All Holes to be 22 Dia UNO Slot hole length is to outside
231 190 6054
0
All Welds to be 6 FW. UNO
6465 6475
FINISH A
LOT 15 QTY 1
PHASE 1 QTY 1
6465 10
0
FABRICATION STATUS
F15165 15074
F15022 D E
A
403
388
C 327
90
45
45
233
4
12 94
6
F15139
45
45
94
797 0 8
93
°
8 .5 F15102
B F15114 88 F15103
60 60 8
8 8
646
B-B
F15113
150
150
8 0
8
F15005 F15007
D E 100 100
E-E
2740 70 70 2890 89 89 89
0
2740
5910
5999
6177
6355
70 70 89 89 120
2950
6088
6266
6475
2810
3020
2880
3100 3335 40
0
3100
6435
6475
82 82 70 89 89 89 80 105
89 89 132
8 8 F15143
8 8
50
45
45
50
8 8 8
F15040 8 8 F15041 8 F15142
8
8
40 40 93 88
F15164
130
8 797 797
88
90
708 707
674 686
34
21
130
686
C-C
MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
0 0 NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
F15164 TEL. 01698 374 666
130
19.08.2021
PROJECT: DRAWN BY:
Tekla Structures
40 40 1 No. COLUMN REQUIRED AS DRAWN MARKED 15074 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
A-A ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15074]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15075 SHS150*150*5.0 S355-JR 1 4051 2.433 92.2
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
8
8 Checked by: Date:
8
8
90
F15101
A-A A A
FITTING DETAIL
250
50 200
30 90 30
150
2 No. BEAM REQUIRED AS DRAWN MARKED 15075 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15075]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15076 SHS150*150*5.0 S355-JR 1 4626 2.778 105.3
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
8
8 Checked by: Date:
8
8
90
F15101
A-A A A
FITTING DETAIL
250
50 200
30 90 30
150
2 No. BEAM REQUIRED AS DRAWN MARKED 15076 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15076]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15077 PFC-230*90*32 S355-JR 1 3834 3.095 121.5
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
70
F15058
A-A
A A
FITTING DETAIL
F15058
45
90
45
80 70 80
230
2 No. BEAM REQUIRED AS DRAWN MARKED 15077 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15077]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15078 PFC-230*90*32 S355-JR 1 4409 3.558 139.7
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
70
F15058
A-A
A A
FITTING DETAIL
F15058
45
90
45
80 70 80
230
2 No. BEAM REQUIRED AS DRAWN MARKED 15078 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
2 THIS IS IT'S OWN ASSEMBLY C427 [15078]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15079 RSA100*100*8 S355-JR 1 2270 0.911 27.4
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
120
2150
2220
2270
Checked by: Date:
RSA100*100*8 x 2270
15079
1 No. BEAM REQUIRED AS DRAWN MARKED 15079 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15079]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15080 RSA100*100*8 S355-JR 1 1853 0.744 22.3
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
120
1733
1803
1853
Checked by: Date:
RSA100*100*8 x 1853
15080
1 No. BEAM REQUIRED AS DRAWN MARKED 15080 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15080]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15081 RSA100*100*8 S355-JR 1 1754 0.705 21.1
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
120
1634
1704
1754
Checked by: Date:
RSA100*100*8 x 1754
15081
1 No. BEAM REQUIRED AS DRAWN MARKED 15081 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15081]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15082 RSA100*100*8 S355-JR 1 2868 1.150 34.6
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
120
2748
2818
2868
Checked by: Date:
RSA100*100*8 x 2868
15082
1 No. BEAM REQUIRED AS DRAWN MARKED 15082 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
1 THIS IS IT'S OWN ASSEMBLY C427 [15082]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15083 RSA120*120*10 S355-JR 1 3936 1.894 71.1
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
60
F15060 F15060 Loaded by: Date:
A-A B-B
A B
10 3936 10
FITTING DETAIL
F15060
30 60
150
60
60 60
REV By Date By Date
120 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
3 No. ANGLE REQUIRED AS DRAWN MARKED 15083 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
3 THIS IS IT'S OWN ASSEMBLY C427 [15083]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15084 RSA120*120*10 S355-JR 1 4511 2.170 81.5
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
60
F15060 F15060 Loaded by: Date:
A-A B-B
A B
10 4511 10
FITTING DETAIL
F15060
30 60
150
60
60 60
REV By Date By Date
120 MARK DESCRIPTION CREATED CHECKED
GR CONTRACTS LTD
13 CANYON ROAD
NETHERTON INDUSTRIAL ESTATE
WISHAW. ML2 0EG
TEL. 01698 374 666
GR CONTRACTS FAX. 01698 374 667
3 No. ANGLE REQUIRED AS DRAWN MARKED 15084 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
3 THIS IS IT'S OWN ASSEMBLY C427 [15084]
SHOP MATERIAL LIST FOR 1 ASSEMBLY
Length Area Weight
Mark Size Grade No. (mm) (m)2 (kg)
15085 FLT30*300 S275-JR 1 300 0.216 21.2
GENERAL NOTES
All Holes to be 22 Dia UNO Slot hole length is to outside
All Welds to be 6 FW. UNO
FABRICATION STATUS
30
Sawn by: Date:
300
50
250
50 200 50
0
90
300
120
15085 ( 30*300 )
10 No. PLATE REQUIRED AS DRAWN MARKED 15085 CITIZENS THEATRE ESD LTD
CONTRACT NO: DRAWING NO: REV:
ASSEMBLY / SUB ASSEMBLY STATUS
10 THIS IS IT'S OWN ASSEMBLY C427 [15085]