You are on page 1of 3

工具操作指导书 文档密级:

*Guide Name:【Windlass operating instructions】


【Construction personnel】
*Object: 【V1.2】
*Version:
*Prepared by:【】 *Owner by:【】

Tools function: Lifting wireless antenna, microwave antenna, pole and feeder.

1. Windlass description(SUNYES-150,Load 150 Kg, 220V AC,1KW)

Motor
Controller

Reel
Power cord

Fixed backplane

Fixed screw Side fence

Tower

Hoisting
person
Hoisting &Control
person

2012-05-16 华为机密,未经许可不得扩散 第 1 页,共 3 页


工具操作指导书 文档密级:

2. Windlass operating instructions


Selected hoist fixed position, angle iron, pole, ladder in the bottom of the tower body are
Recommend

Selection left or right position of Winch mounting direction base on tilt direction of hoisting rope ,
principles: principles:The motor on the same side as pulley mounted on

Right position, Left position,


Fixed windlass

1 2 旋紧 3 4
Screw must
expose the nut
in the motor side
Target

Fasten
Threading from the inside,then
Installing the hoisting rope wound on the reel 2-4 laps,
outlet from the bottom

5 6 7 8

Connect the power, taut hoisting rope at one end, so that the hoisting rope and reel snapping, by
press and release the button on controller do lifting operations
9 10 11 12

Press
on,
releas
taut Reverse e off

2012-05-16 华为机密,未经许可不得扩散 第 2 页,共 3 页


工具操作指导书 文档密级:

3. Windlass handling precautions


1. Cannot be used in the rain, pay attention to the process of using waterproof moisture
2. Installation and removal hoist process, pay attention to support windlass to prevent falling, Screw
must expose the nut in the motor side when installation
3、we need to lift load test to confirm lifting reliable, flexible brake before lifting operations, then load
job.
4、Do not continuous use, After running five minutes to pause five minutes, This will ensure the
safety and extend the life.

2012-05-16 华为机密,未经许可不得扩散 第 3 页,共 3 页

You might also like