You are on page 1of 3
Casta Engineers Pvt. Ltd. In Joint Venture with SOWiL Ltd. Ref. CASTA/GSHPL/Gohana-Sonipat/TL/2021/0237 Date: 18.02.2021 To, Authorized Signatory, M/S GobanaSonipat Highway Pvt. Ltd. 4% floor, Vikash Surya Shopping Mall, Plot No.-18, Manglam Palace, Sector-3, Rohini, Delhi-1 10085 Sub: 4-Laning of Gohana-Sonipat (Pkg-2) Section from km 40,601 to km 78.837 (Length = 38.236km) of NH-352A in the state of Haryana under BharatmalaPriyojna under NH (O) to be implemented on Hybrid Annuity Model (HAM), Reg. Undertaking for Casting of Deck Slab of LVUP @ 43+755. Your office letter no: GSHPL/2021/530, Dated: 12.02.2021. (Undertaking for Casting of Deck Slab of VUP @ 43+755.) 2. Our office letter no: CASTA/GSHPL/Gohana-Sonipat/TL/2021/0205, Dated: 25.01.2021 (Structure work without confirmation to specifications & Standards by Independent Engineer) 3. Your office letter no: GSHPL/2021/436, Dated: 21.12.2020. (Execution of VUP at Ch. 43+755 without confirmation to specifications & Standards by Independent Engineer.) 4, Our office letter no: CASTA/GSHPL/Gohana-Sonipat/TL/2020/0146, Dated: 19.12.2020. (Non-Confirming Report No: 03) 5. Our office letter no: CASTA/GSHPL/Gohana-Sonipat/TL/2020/0143, Dated: 17.12.2020. (Execution of VUP at Ch. 43+755 without confirmation to specifications & Standards by Independent Engineer.) Dear Sir, : With regards to the above subject matter, Concessionaire submitted its letter no: GSHPL/2021/530, Dated: 12.02.2021, received on Dated: 13.02.2021 at 05:35 PM via mail. In which undertaking was ascertain for casting of Deck Slab and assured that in case of structural failure, all the responsibility will be of Concessionaire's, Further, itis to bring in your kind notice that by various correspondences, it was intimated by IE not to carry out any work further without complying our observations and closure of non-confirming report no-03, But, in spite of following IE’s instructions, work was carried out further. And, due to covering of work without confirmation by Independent Engineer cube strength of Raft & Wall of LVUP at Ch; 43+755 (RHS) were found surprisingly low. Moreover, vide letter under ref no: 04 NCR was issued for carrying out structure work at Ch. 43+755 VUP without submitting Concrete Mix Design, SBC Test report and without rectifying VUP location as per site condition and submitted drawing, In which, Concrete Mix Design & SBC test report were submitted later but shifting of VUP was not taken into account. ‘Therefore, in view of the above we would like to suggest that Core cutting test shall be performed for this structure and those whose cubes have failed in Compressive Strength Test. (Results Enclosed) This is for your immediate consideration and necessary action please. ‘Thanking you and assuring best co-operation at all times. 50 Seka Sow aee® 3 LN ern Project Office: we incéis Pvt. Lid in JV with M/s SOWiL Lid, House No-4129, Ward No-31, Indian Colony, Sugar Mill aay Bridge, Sonepat, Haryana-131001, E-mail asia gohunasonspat@inallsom Casta Engineers Pvt. Ltd. In Joint Venture with SOWiL Ltd. With best regards For, CASTA EPL JV SOWIL LTD. Sek... mar DER (Team leader) an UROL LTD. sine ers x Y epat ene?) Coy 1. The Project Director, Project Implementation Unit, National Highway Authority of India A-3, Upper Ground Floor, Pushpanjali Enclave, Near Navjeevan Hospital, Pitampura, New Delhi- 110034. (For Information Please) 2. MIS Casta Engineers Pvt. Ltd. A-26 Ist Floor, B-I Extension, Mohan Co-Operative Industrial Estate, New Delhi-1 10044. (For Information Please) Project Office: M/s Casta Engineers Pvt Ltd in JV with M/s SOWL. Ltd. House No-#129, Ward No-31, Indian Colony, Sugar Mill, bypass, Near Railway Bridge, Sonepat, Haryana-131001, E-mail casta,gohanasonepav@amailcom ‘Cube Compressive Strength Test Results Afier 28 Days ige | Side | Structure | Part of Structure | Grade of Concrete | Strength | Average | Date of Casting Date of Testing 14.98 43+755 |RHS| VUP WALL M35 17.47 | 16.68 24-12-2020 21-01-2021 es | ae 17.6 | 31.33 | 27.64 | 26.27 30.58 29.2 28.09 43+755 | RHS | LVUP RAFT 30 31.64 | 29.09 | 17-12-2020 14-01-2021 29.29 27.07 28.27 29.02 30.62

You might also like