Professional Documents
Culture Documents
OF INDIA
: NATIONAL HIGHWAY AUTHORITY
x-MAcADAM
(As Pcr NlOIll'&l{'Iable J00-lJ) ,
Date of SamPling
Date of Testing
Sampled BY
Date of Testing
rpose to be use
of Container (Ws)
RESUTTS
E
o!
z
C
o
o
o
Moisture content %
.A
ATfiTMETINffi
4 LANING OF JIND-GOIIANA (PKG:I ) SECTION FROM KM' 00'000
TO KM.40+601 (PRoJECT LENGTH KM.40.601) oF NH - 3s2A IN Fh#rr
STATE OF HARYANA UNDER BHARATMALA PARIYOJNA UNDER
NH (O)TO BE IMPLEMENTED ON HYBRID ANNUITY MODEL (HAM) UIUIL
wtt
I]
lndependent Engineer : CASTA ENGINEERS PRIVATE LTMITED IN J.V. WITH SOWII. LIMITED
Date of Sampling
Purpose to be Use
Renrarks :
oY-
97
lndependent Engineer : CASTA ENGINEERS PRIVATE tlM|TED lN J.V. WITH SOWIL LIMITED
SOUNDNESS OF CEMFNT
As Per IS:4031 (Part3)
Observation Table
Measured distance in between the
Weight of Water Before putting Soundness (B-A)
sl.. Weight of (W2;=Y1**x(0.78%) in Boiling After 3 hrs putting in terms of Le- Permissible limit
No. Cement (Wl) (gm) water in Boiling water (mm)
Chatelier's (mm)
(A) (mm) (B) (mm)
3
less than l0mm
Remarks :-
dL
A
nmrmilr5rffit 4 LANING OF JIND-GOHANA (PKG: I ) SECTION FROM
KM. 00.000 To KM.40+601 (PRoJECT LENGTH KM.40.601)
rf -@.
-s /ps
OF NH.352A IN STATE OF HARYANA UNDIIT
BHARATMALA PARIYOJNA UNDER NH (O)TO BE
IMPLEMENTED ON HYBRID ANNUITY MODEL (IIAM)
lndependent Engineer : CASTA ENGINEERS PRIVATE LIMITED IN J.V. WITH SOWIL LIMITED
Location Sampled By
st.
No.
Description tlnit Sample- I Sample-i2 Sam ple-3
Average
Remarks :-
lffi 4 LANING OF JIND-GOHANA (PKG: I ) SECTION FROM KM.
00.000 To KM.40+601 (pRoJEC'r'LENGTH KM.40.60t) Or-
NH - 3524 IN ST'ATE OF HARYANA UNDER BHARATMAT,A
PARIYOJNA ITNDER NH (O)TO BE IMpr_EMENTED ON
HYBRID ANNITTTY MODEL (HAM) hqm
Client : NATIONAL HIGHWAY AUTHORITY OF INDIA
lndependent Engineer : CASTA ENGINEERS PRIVATE LIMITED lN J.V. WITH SOWIL LIMITED
SL 'fest 'l-est
Description Unit I 2 Average
No.
Remarks:
RFI NO.
Date of Sampling
Source
Date of Testing
L.ocatiorr
Sampled By
Type of Material
Tested BvJ
S.
No Description
LJn ir T'est I Test ll Average
I Weight of Pycnometer
gm
4
lW.iUfrt
of Saturared Surface Dry Sample (C) | gm
5
lW.igl',t olOven Dry Sample (D) gm
I
l
Y-',, I
-\
Remarks :-
TEXTURE DEPTI{
(MORT&H 1'ABLE:600-5)
ITI NO.
Date of Testing
-ocation/Chainage 1-ested By
REQIgIPPP TEXTURE
NTJIlIBER OF VALUE AVERACE
t'tNlL OF "I'UST CHAINAGE
(3l0oo(D'z) VALUE SPECIFIED
MEASUREMENT
VALI., E
Iletween 24
l-lours and 7
days after the
constructiort o
thc slab. or
until the slab is
first used by
veh icles
llcnrarks :
lndependent Engineer : CASTA ENGINEERS PRIVATE LIMITED lN J.V. WITH SOWIL LIMITED
1
Location/Source Date of Testing
-)/
I'ype of Material Sarnpled by
lJ/ /
ry
Observation Table
st- 7
Description I 3
No.
./
I Weight of Materiaffn Saturated Surface Dry Condition Wl gm
"r/
Remarks:
o\r
4 LANING OF JIND.GOHANA (PKG: 1
) SECTION FROM KM. OO.OOO TO
KM.40+501 (PROJECT TENGTH KM.4O.5O1)
OF NI{ .352A IN STATE OF
HARYANA UNDER BHARATMALA PRIYOJNA
UNDER NH (O)TO BE
tMPTEMENTED ON HyBRtD ANNUtTy
MODEL (HAM)
RFI NO.
Date of Sampling
Source of Material
Date of 'testing
Sampling Location
Sampled By
Iype of Material
Tested By
Purpose to be Use
Weight of Sampte (gm)
IS Sieves
Weight of LummLllatlve
Retained Weight Roained Cummulative %o of
(rnrn) % of Passing
Specification Lirnit
(em) Weighr Retained
(gm) (lS:383 T'able - 10)
40
r00
20
9-s- t00
4.15
30-_s0
0.600
l0-i,s
0.r50
0-6
Remarks:- I
Date of Sampling
Date of Testing
of Material
Sand Content
Remarks :
CL
(}l-
4 LANING OF JIND-GOHANA (PKG: I ) SECTION FROM KM. 00.000 TO KIu.
\@&
40+601 (PROJECT LENGTTT KM.40.60r) OF NH - 3524 IN STATE OF a;\ /rrt\ fr* ,fl*
HARYANA UNDER BHARATMALA PARIYOJNA UNDER NH (O)TO BE
ilt, tU, tt ,
ndependent Engineer : CASTA ENGINEERS PRIVATE LIMITED IN J.V. WITH SOWIL LIMITED
'ha inage
Sampled By
,a) er Tcstcd By
Cumm. (lumm.7n
o/o Specilication Limit MOlll'&ll Table 4l)0-l
Sie r c size Weight Weight of
of \Veight
(nrm) Retained (gm) Retained l'assi ng
Retained
(gm)
Grading I Grading ll Grading lll Grading l\/ Grading V Grading \/l
75 100
100
) 80- I 00
t00 t00 100 80- I 00 t00
26.50 5 5-90 jr5-90
70- r 00 5 5-75 s0-80 75- r 00
9.50 35-65
50-80 35-65 5 5-75
1.7 5 25-5 5
40-65 I 0-t0 r 5-35 :15-50 l0-5 s
2.16 20-40
30-50 I 0-20 I 0-25
0.850
2-t0
0.425 r0- r5
l0- l5 0-5 0-8
4 I-ANING OFJIND-GOHANA
(PKG: 1 ) SECTION FROM KM' 00'000
TO
4EHMBffiL{ffiiT
oF NH - 3524 IN STATE
lt-"-
i".. -'3
KM..t0+601 (PnoJEC'l'iBNGTH KM' 40'601)
PARIYO'INA UNDER NH (O)TO
Li-"d "' "';lilt
OF HARYANA UNDER SHANATNIAI-A
rllrNrnn oN HYBRID ANNulrY MoDEL (HAM)
zumm
marks :-
HICHWA
- WD---
.{UTTIORITY OS /-
4 LANING OF JIND-GOHANA (PKGr 1 ) SECTION FROM KM. OO.0O0 ro KM. 40+601 (PROJECT
LENGTH KM.40,601)OF NH - 352A tN STATE OF HARYANA UNDER BHARATMALA PARIYOJNA
UNDER NH (O)TO BE IMPLEMENTED ON HYBRID ANNUITY MODEL (HAM)
lndependent Engineer : CASTA ENGINEERS PRIVATE LIMITED lN J.V. WITH SOWIL LIMITED
l,ocation Sampled By
Purpose to be use
Observation Table
r-rQUrD LIMIr PLASTIC LIMIT
Sl. No. Determination 4
I 2 3
I 2
I Penetration in mm
2 Container No.
PI=- o/
/t
-
;<
F.
zIT
F
z
o
o
UJ
d.
f
F
a
6
=
.E
PENETRATION (MM)
Remarks:
y
4 LANING OF JIND-GOHANA (PKG: 1 )SECTION FROM KM. 00.000 To KM.40+601 (PROJECT
LENGTH KM.40.601) OF NH - 352A lN STATE OF HARYANA UNDER BHARATMALA PARIYOJNA
UNDER NH (O}TO BE IMPLEMENTED ON HYBRID ANNUITY MODEL (HAM) hry
Client NATIONAT HIGHWAY AUTHORITY OF INDIA
lndependent Engineer CASTA ENGINEERS PRIVATE LIMITED IN J.V. WITH SOWIL LIMITED
atrnnnEnc rtu
(As per lS 2720, Part - 5)
{l:t No Date ol Sampling
l.ocation Sampled By
)urpose to be use
Observation Table
LlQl-rlD l,lMlT PLASTIC LIMIT
Sl. No. Determination
I 2 3 4
I 2
I No. of Blows
) Container No.
o/
LL= /o
s PL= tA
e
o
Pl= o
o
o
o
.9,
o
E
Size o1'Cube
-l'ested
]rade ofConcrete U)