You are on page 1of 4

ENDER JOSE GREGORIO BUSTILLOS

ID Number: V-11.770.197
Passport: 109681456
Venezuelan SAILOR’S LICENSE: PA-793-AMTT
SEAMAN’S BOOK PANAMA: P0396076
Home Addres: Ciudad Bicentenario, 9 street, #R
44.
Punto fijo – Falcon State, Venezuela
Email: enderbustillo75@hotmail.com
Birthdate: 05/21/1976
Phone: +584120777059

MAINTENANCE MECHANIC
9 years of experience in the construction, repair and maintenance of oil and
petrochemical plants, erector mechanic, maintainer and specialized technician in towers.

WELDER
14 years in SMAW-GTAW processes, basic knowledge in welding, fifter manufacturing,
welder on oil tankers.

SPECIALTIES: as an assembly mechanic and maintenance mechanic, assembly of lines


and structures, assembly of valves and equipment such as heat exchangers. fire and
cooler: assembly of tower internals. Work in teams basic knowledge in welding and
manufacturing, hydrostatic and pneumatic test development.

COURSES

Hydrogen sulfide exposure (H2S) (CIED PDVSA VENEZUELA)


Safety in confined spaces. ) (CIED PDVSA VENEZUELA)
Talk about safety, hygiene and environment applied to artisan trades (CIEDPDVSA
VENEZUELA)
SBC Security – Behavior-Based Security (CIED PDVSA VENEZUELA)
Industrial plant operator course in which I obtained the credentials in their specialty in
rotating equipment, heat variables, heat indicators.
INCE welding course: OAW- GTAW-SMAW welder
TECNIWESCA welding course: AWS QC-1 AWS CAW1 (SMAW-GTAW)
Welding on 4 ”and 6” diameter SHC 40 pipe for carbon steels in ling en 29.59.69

OMI COURSES

Tanker familiarization courses Certificate of competence Company awards


Costa Norte Construction: safe personnel during the general repair of the gas plant-Cardon
PDVSA refinery
Drilled piles: recognition of their outstanding performance in complying with SIMO-A standards
and procedures during the general repair of the storage tanks of the Cardon - C.R.P PDVSA
Refinery
Experience in super tanker and tanker oil tankers 3 years as a fifter/welder.
WORK EXPERIENCE

(02/24/2020 - 07/18/2020) company MANTENISHIP SPAIN, S.L - BUQUE TANQUE ARITA, me


I worked as a WELDER doing work such as repairs of fire pipes, metallic structures and support
in maneuvers both on deck and machines.

(11/27/2019 - 02/19/2020) company BLUE OCEANIC SERVICES, C.A., - ZEUS TANK SHIP
I worked as a WELDER doing jobs such as repairs to fire pipes, metal structures and support in
maneuvers both on deck and machines.

(11/18/2018 - 11/10/2019) company MARITIMA AVILA, SM. C.A., I worked as a WELDER doing
jobs such as repair of the winch base, repair of the chain stopper, manufacture of the crane
sleeper, machine manufacture of the fire system, repair of cargo tanks, structure in the
machine room and support in maintenance of the two departments.

(07/07/2017 - 09/07/2018) company MARITIMA AVILA, SM. C.A., I worked as a WELDER doing
work in the machinery department (repair and manufacture of 2 ”and 3” pipes, such as the
starboard and port machine, repair of the plumbing of the sanitary system and air conditioning
system) and in the department Deck (repair of port side structures, repair of bow wuinche
base).

(04/14/2016 - 10/14/2016) company COSTA-MARE I worked as a WELDER in repair in the


machinery department and deck department.

(11/07/15 - 16/01/2016) company ACUAMARE VENEZUELA: I worked as a WELDER in


hydraulic system repair.

(18/12-2014 - 30-01-2015) company Internal IDT of towers: major petrocedeño stop: I


worked as a WELDER, I carried out disassembly and assembly work of 36 ”stainless
steel lines from the towers of the towers to the pump rooms removal and internal
assembly of gaskets and plates Hydrostatic testing of lines associated with equipment
and repackaging of valves associated with sprint high pressure pump and bale plants.

(30-09-2014 - 30-10-2014) company TRANSNACIONAL NAVIERA TEAM 321, CA vessel


granalero el margarita: I worked as a WELDER in the SMAW processes executing
activities such as grinding and welding in 6 ”and 12” pipes in the hydraulic system of the
ship.

(22-05-2014 - 29-08-20149) company Z&P ZAMARELLA PAVAN CONSTRUCTION


,CA:CRP CARDON PDVSA POLID SUFAZ CONSTRUCTION TIGUADARE, I worked as a
WELDER at the t47 pumping station. I did metalworking work on the assembly of 24
”carbon steel line.
(27-11-2013 - 30-12-2013) company TANK SHIP LUISA CACERES ARISMENDI: I worked
as a WELDER making the replacements of several sections of pipe, traces of steam and
ship condensation.

20-10-2013 - 08-11-2013) company GYG SERVICIOS PETRÓLEROS CRP AMUAY : me


Work as a WELDER at the HYAY-3 plant, perform dismantling work on a 12 ”carbon steel
line, assembly of coils, assembly of valves associated with the plant.

(17-05-2013 - 14-09-2013) company TRANSNATIONAL NAVIERA ATLAS MARINES


chemical tanker pico el toro: I worked as a FIFTER WELDER doing work on the deck of
the ship such as replacement of the entire 6 ”line of the hydraulic system of the ship
mount support of said pipe.

(11-09-2000 - 17-11-2000) company HAFRAN: I worked as a WELDER, executing


general project work to increase oil production and major repairs of the plant in the
José de los tren A&B cryogenic complex.

(25-04-2012 - 16-06-2012) company MIST REFINERY CURACAO ISLAND: stoppage of


the catalytic alkylation plant: I worked as a WELDER, performed activities such as
disassembly and assembly of valves associated with the plant, there was removal and
cleaning of the internals of the towers and assemblies of the furnace tubes and
assemblies of the steam line and associated product with plants.

(07-11-2011 - 14-03-2013) company PILPERCA PILOTES PERFORADOS CRP CARDON:


I worked as a WELDER in the repair of tank A07, performed dismantling work on the roof,
rings and floor of said tank.

(23-03-2010 - 21-06-2010) company CONSORCIO TRANSMEICA: general repair of the


PSAY-PVAY-NFAY CRP AMUAY plant: I worked as a WELDER doing grinding activities,
recovery of flanges and machineries of 6 ”, 8”, 24 ”stainless steel lines assembly of
these lines prefabrication of chrome lines for the kiln.

(16-01-2006 - 24-03-2006) company CONSORCIO TRANSMEICA: repair of dock 2 of the


CRP CARDON: I worked as a WELDER in the activities on the 12 ”lines from the head of
the dock to the loading system. Disassemble and assemble the springs. Dismantle the
loading and unloading hoses.

(05-09-2009 - 25 -09 -2009) company QUINTOCA QAC CRP AMUAY planta 3: I


worked as a WELDER: performing removal and cleaning work on the internals of the
towers and repacking of valves associated with the plant

(27-10-2008 - 22-05-2009) company VAMENCA VC: metalworking works in PROYECTO


FCC CRP CARDON I worked as a WELDER: I carried out works of grinding and welding
mechanical work such as assembly and disassembly of steam lines and products
associated with the plant assembly of stainless steel tanks and carbon steel tanks
(13-09-1999 - 14-12-1999) company CONSORCIO HACOR maintenance in the CRP
cardón metalworking works I worked as a WELDER I carried out different activities in
different plants mount structures and valves in the various plants for removal and
cleaning of the internals of the towers repacking valves and changing chimney plates

(21-05-2007 - 30-08-2007) company VENEFCO: General REPAIR of dock 4 of CRP


AMUAY I worked as a WELDER, disassembling and assembling the 24 ”16” and 8 ”lines,
disassembling and assembling the loading and unloading arms, disassembling and
assembling the fenders and the entire mechanical structure of the pier

(05-09-2006 - 04 -10 -2006) company SETICA: repair of the lubricating plant


DESILACION CRP AMUAY WELDER charge: the worn parking lot was removed and a
new one was placed, plates were changed in the chimney and a tightness test was
applied to it later.

(23-05-2006 - 19-08-2006) company SOLFACA CRP CARDON: high vacuum tower 2 I


worked as a WELDER doing plate extraction and installation work.

(17-01-2005 - 21-02 -2005) company COSTA NORTE CONSTRUCCIONES CA:


major and routine maintenance of plants in the distillation and lubricants area CRP
amuay cargo SOLDADOR There was removal and cleaning of the internals of the towers
and repacking of valves associated with the plant, hydrostatic tests, repair and
replacement of valves, placement of blinds, had lines associated with the refiner
complex.

(09-04-2002 - 24-05-2002) company COSTA NORTE CONSTRUCCIONES: general


repair of the gas plant 1 CRP CARDON I worked as a WELDER, cleaning, extraction and
installation of plates.

(13-03-2003 - 27-07-2003) company SOLFACA: project expansion of the boarding


terminal TAEJ COMPLEJO ANZOATEGUI cargo SOLDADOR make assemblies of
equipment associated with the pump room as well as steam traces.

(02-08-2002 - 28-11-2002) company SOLFACA: project of the gas reduction line santa
rosa anaco Anzoátegui state SOLDADOR assembling 6 ”lines.

You might also like