0.1 Scope : This document cover the welding process qualification as per AWS D1.2 and welding
requirements for project SAMI-CMI
❑ Alternative : 6061-T6/T651
➢ Group M23
Qualification of one material from one group shall qualify for all the material in that group .
e.g. if we qualify 6061 , we will be qualified to weld M23 group . 6
1- WPS Variable
selection
7
1.1 WPS Writing
2- Qualification “PQR”
8
1.2 Filler
Selection
1- WPS Variable selection
Filler to be used :
According to the choosing base material
❑ Alu 5083 => Filler 5183
❑ Alu 5086 => Filler 5356 or 5183 or
5556
❑ Alu 6061 => Filler 4043 or 5356 or
5183 or 5556 or 4047
9
1.3 Gas & Position
Selection
1- WPS Variable selection
Gas Selection :
For aluminium :
=> use Ar , He or Ar-He Gases
Welding Position :
Position to be qualified is 2G
11
2- Process
Qualification
“PQR”
12
2.1 Required
specimens PQR 2- Qualification “PQR”
For SAMI-CMI Project we have See Table 3.4 for the requirements for qualifying a WPS of a
only fillet welding , however by complete penetration (CJP) Groove weld
qualifying groove it will qualify
both groove and fillet
13
See Next page for test pieces
2.2 Tests
required for 2- Qualification “PQR”
PQR
Required
1. Prepare 2 plates (each 18 x 50”min” cm) , then create
chamfer 45 degree
2. groove weld
3. cut into 6 sections as shown in the figure :
2 tests face bend + 2 root bend + 2 reduced section tension
15
3- Welders
qualification
“WPQ”
16
3.1 Required
specimens WPQ 3- Weldres qualification “WPQ”
Other then PQR , other different tests & specimens must be conducted for
Welder qualification WPQ
Position to be qualified is 2G
17
3.2 Tests
required for 3- Weldres qualification “WPQ”
WPQ
Required
1. Prepare 2 plates (each 18 x 70 cm) , then create
chamfer 60 degree
2. Use backing and separate weld pieces by 10 mm ,
3. groove weld
4. finally cut as shown in figure 3.26 to obtain 2
specimens :
1 face bend + 1 root bend (can be replaced by Radio-grph)
19
4- Quality &
inspection
20
4.1 SAMI
requirements 4- Quality & inspection
NDT Requirements :
AWS D1.2 state that NDT can only apply if it is
demanded by customer documents , which in our
case is not required .
22
4.3 Workmanship
and weld quality 4- Quality & inspection
23
5- Conclusion
24
4- Conclusion
Conclusion :
❑ SAMI-CMI Requirement doesn’t required qualification ( PQR & WPQ ), only writing WPS is required .
We don’t need EQN .
❑ However I recommend to do the qualification to ensure the welding as per requirements , also to have qualified welders in
aluminum as per AWS D1.2 in case t is required in the future .
❑ The drawing call for 3 alternative material , for each there is different filler to be used , SCM shall choose the material to be
ordered and also see the availability of filler determined in page 9
• For base metal Alu 5083 => Filler 5183
• For base metal 5086 => Filler 5356 or 5183 or 5556
• For base metal 6061 => Filler 4043 or 5356 or 5183 or 5556 or 4047
=> ER 5183 is common
❑ In this document the all required data and variables are extracted to build our WPS , After Filler selection , Dear Anwar please extract
the recommended variables as per filler data sheet and consult TCR for the remaining variables .
❑ NDT is not required by customer drawing or D1.2 , However it is recommended for the first batches , we require Qc personel who is
qualified in visual inspection or we outsource it .