PERBELANJAAN BIL KILANG PERINCIAN SENARAI PROJEK (RM)
KSFB SEBERANG PERAK
KERJA-KERJA MEMBEKAL/PEMBAIKAN 2021 1 SAWIPAC DESTONER SYSTEM 90,000.00 3 NEW 3 STAGE HYDROCYCLONE 100,000.00 5 NEW 1 UNIT 80MT SEMI PITLESS WEIGHBRIDGE 200,000.00 7 NEW SWITCHBOARD FOR MCC-NUT PLANT 200,000.00 8 NEW 1 UNIT BUNCH CRUSHER PRESS 160,000.00 9 NEW 1 UNIT KERNEL SILO 100,000.00 10 NEW 1 UNIT NUT CRACKER 60,000.00 13 1sT & 2nd STAGE CRACKED MIXTURE SAWIPAC 200,000.00 14 1 UNIT EFB FIBRE RIBBON CONVEYOR 200,000.00 15 1 UNIT RETENTION POND C/W PUMP & ACCESSORIES 200,000.00 16 1 UNIT WATER SOFTENER 100,000.00 JUMLAH 1,610,000.00
KERJA-KERJA SAMBUNGAN 2020
1 1 UNIT FRUIT CONVEYOR 300,000.00 2 INSTALL ESP SYSTEM FOR 2 BOILER 3,500,000.00 3 UPGRADING MILL CAPACITY TO 60MT/HR (VO) 1,860,000.00 4 MINI LAB 180,000.00
5 UPGRADE DEPRICARPING SYSTEM C/W NUT POLISHING DRUM(SHAFTLESS) 450,000.00
6 INSTALLATION FIRE FIGHTING SYSTEM 580,000.00 7 UPGRADE EFFLUENT TREATMENT TO 60MT/HR 300,000.00 8 1 UNIT 40 MT KERNEL SILO C/W UPPER CONVEYOR 150,000.00 9 CABLE WORKS FROM MSB TO OFFICE 80,000.00 JUMLAH 7,400,000.00 JUMLAH KESELURUHAN 9,010,000.00