Construction Supervision Works For Test Tubewell Purbachol Area Project
Construction Supervision Works For Test Tubewell Purbachol Area Project
Depth: 300 m
Sl. Amount (In
Description Quntity Unit Rate (In Tk.)
No. Tk.)
Mobilization and transportation of all equipments, tools and
necessary materials to the sites as per technical specification and
1 direction of the authorized representative. Demobilization the 1 LS -
same on completion of the work and clean the site as per
technical specification.
2
i) Drilling Cost:
0-50m 50 m
51-100m 50 m
101-150m 50 m
151-200m 50 m
201m-250m 50 m
251m-300m 50 m
ii) Materials Cost:
a) 50 mm dia GI pipe 2 p/m
b) 50 mm dia uPVC (Class-D) blind pipe 280 p/m
c) 50 mm dia uPVC strainer 6 p/m
d) 50 mm dia G.I pipe protective cap 1 each
e) 50 mm dia uPVC sand trap or bail plug 3 p/m
Well development by air compressor ( minimum 2 bar or required
capacity) un-till sand free water is available. All complete as per
3 technical specification and direction of the authorized 1 LS
representative. N.B: If well development with air compressor
is not conducted no bill will be paid.