Construction Supervision Works for Test Tubewell Purbachol Area Project

Depth: 300 m
Sl. Amount (In
Description Quntity Unit Rate (In Tk.)
No. Tk.)
Mobilization and transportation of all equipments, tools and
necessary materials to the sites as per technical specification and
1 direction of the authorized representative. Demobilization the 1 LS -
same on completion of the work and clean the site as per
technical specification.

Exploratory drilling an (125 mm dia) open bore hole maximum up


to 300 meter including sediment sampling, lithology recording and
protect bore hole from cave-in. Supply and installation of Test
Wells of D class (BS-3505; latest amendment) 50 mm dia uPVC
blind pipe, uPVC strainer and bail plug of approved grade & brand
up to the depth specified. Construction of concrete platform if
necessary at the base of test well as per technical specification.
In addition upper 2 meter pipe will be of 50 mm dia G.I pipe with
protective cap. Well development by air compressor un-till sand
free water is available. All complete as per technical specification
and direction of the authorized representative. (In case of
variable drilling rate, it should be increased by depth and
payment will be made only for supplied materials used in
well construction).

2
i) Drilling Cost:
0-50m 50 m
51-100m 50 m
101-150m 50 m
151-200m 50 m
201m-250m 50 m
251m-300m 50 m
ii) Materials Cost:
a) 50 mm dia GI pipe 2 p/m
b) 50 mm dia uPVC (Class-D) blind pipe 280 p/m
c) 50 mm dia uPVC strainer 6 p/m
d) 50 mm dia G.I pipe protective cap 1 each
e) 50 mm dia uPVC sand trap or bail plug 3 p/m
Well development by air compressor ( minimum 2 bar or required
capacity) un-till sand free water is available. All complete as per
3 technical specification and direction of the authorized 1 LS
representative. N.B: If well development with air compressor
is not conducted no bill will be paid.

Standpipe would be fixed with maximum 0.6m x 0.6m x 0.6m size


cement concrete platform. Concrete should be mixed in the
proportion 1:2:4, one part fresh cement, two parts washed
medium or coarse sand, and four parts brick chips made from
4 1 LS
good quality well burnt bricks or stone chips. Clean water should
be used for mixing. Before construction of platform the topsoil
should be removed and rammed properly. After construction
necessary curing should be ensured.
Total (Tk) -
In word (Tk):