SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Raised Equipment Floor Installation Inspection SAIC-M-1055 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Installation Inspection

Raised "computer floors" shall be installed in control rooms, process SAES-J-801


A1
interface rooms, computer and engineering rooms. Sec. 8.2.2.1

Raised "computer floors" shall provide a minimum of 610mm (0.61meter) SAES-J-801


A2
clearance between finished floor surface and the subfloor. Sec. 8.2.2.1

Pedestals and stringers shall be designed to accommodate the required SAES-J-801


A3
clearance and shall provide a rigid, stable platform. Sec. 8.2.2.4

SAES-J-801
A4 The Pedestal system shall minimize leveling problems.
Sec. 8.2.2.4

The floor surface shall be leveled to within +0.25mm per panel and SAES-J-801
A5
+1.65mm in 3.0 meters. Sec. 8.2.2.4

SAES-J-801
A6 Floor panels shall be surfaced with high pressure liminated fiber resin.
Sec. 8.2.2.5

B Final Inspection

SAES-J-801
B1 Floor panels shall be held in place by gravity.
Sec. 8.2.2.5

SAES-J-801
B2 Floor panels shall be made of noncombustible construction.
Sec. 8.2.2.5

If carpet tiles are used, they shall be lint free and specified to inhibit SAES-J-801
B3
static electricity. Sec. 8.2.2.6

The (raised) floor pedestal system shall be grounded at diagonally SAES-J-801


B4
opposite corners of the supporting structure. Sec. 8.2.2.7

SAES-J-801
B5 Grounding conductors shall be run in conduits.
Sec. 8.2.2.7

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Acoustical False Ceilings Installation & Final Inspection SAIC-M-1054 18-May-05 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

REMARKS:

REFERENCE DOCUMENTS:
2- SAES-J-801 -- Control Buildings, 31 January 2005

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2