Professional Documents
Culture Documents
Objectives
Client
• Apply a continuous method for unloading liquids from a gas
Independent Operator
well that would stabilize production and minimize or
eliminate production downtime. Location
Argentina
Results Formation
Agua del Cajón
Tubing
Value to Client 2-7/8 in.
Casing
• Production downtime was eliminated. 5-1/2 in.
• Gas production tripled from 132 to 575 MSCFD (5,500 to Setting Depth
16,300 m3/day). 5,905 ft (1,800 m)
• Payout of the service came in 60 days. Run Length
5,892 ft (1,796 m)
Products/Services
Capillary injection services