Professional Documents
Culture Documents
U-Dith TANO-Model 2
U-Dith TANO-Model 2
DESIGN DRAWING
Galian
Galian
Jalan Raya
Jalan Raya
NAMA KEGIATAN
1.10 PEMBANGUNAN INFRASTRUKTUR
STA 0+000 1.10 STA 0+025
DESA POTENSIAL POTO TANO
1.39
1.00
Pas.batu existing
Pas.batu existing
0.94
Uditch 80/90/120
Pasir Urug 0.94 Uditch 80/90/120
Pasir Urug
NAMA PEKERJAAN
Pas.batu existing
Pas.batu existing DED PENATAAN DRAINASE
PERMUKIMAN POTO TANO
LOKASI PEKERJAAN
KEC. POTO TANO
PENGESAHAN
DIAJUKAN OLEH
KONSULTAN PERENCANA
9.620
9.620
9.620
9.620
9.520
9.520
9.520
9.520
9.520
Elevasi Rencana ( m ) Elevasi Rencana ( m )
9.620
9.620
9.620
9.620
9.190
9.910
9.910
9.910
9.910
9.475
Elevasi Tanah Asli ( m ) Elevasi Tanah Asli ( m )
8.619
8.619
8.519
8.915
Elevasi Dasar Saluran ( m ) Elevasi Dasar Saluran ( m )
Jarak (m) 2.89 2.00 3.00 3.00 2.00 2.07 Jarak (m) 2.89 2.00 3.00 3.00 2.00 2.07
WAHIDIN, ST
DIREKTUR
MENGETAHUI / MENYETUJUI
PEJABAT PEMBUAT KOMITMEN
Galian
Jalan Raya Galian
Jalan Raya
STA 0+050 1.10
STA 0+075
1.10
1.00
0.92
Pas.batu existing
Pas.batu existing
Uditch 80/90/120
0.94 0.94 Uditch 80/90/120 ISMU RAHMAN, ST
Pasir Urug
Pasir Urug
NIP. 19790121 201001 1 015
Pas.batu existing
Pas.batu existing
MENGETAHUI / MENYETUJUI
9.420
9.420
9.420
9.420
9.265
9.265
9.265
9.265
9.265
Elevasi Rencana ( m ) Elevasi Rencana ( m )
9.420
9.420
9.420
9.420
8.990
9.180
9.180
9.180
9.180
8.750
Elevasi Tanah Asli ( m ) Elevasi Tanah Asli ( m )
JUDUL GAMBAR SKALA
8.418
8.418
8.263
8.263