You are on page 1of 1

SUBMITAL NO:

NOTE:

GAMUDA COVE TOLL PLAZA


PERSIARAN COVE UTAMA

PERSIARAN COVE UTAMA

KEY PLAN:

PERSIARAN COVE UTAMA


REV DESCRIPTION DATE

GAMUDA COVE TOLL PLAZA


PROJECT NAME:
A TOLL PLAZA GANTRY SIGNAGE WORKS
FOR PROPOSED MIXED DEVELOPMENT ON LOT
68054, MUKIM TANJONG DUA BELAS,
DAERAH KUALA LANGAT,
SELANGOR DARUL EHSAN.

FOR MESSRS GAMUDA LAND (T12) SDN BHD


7 8 7 CLIENT:

1 2 3 4 5 6 7 7 6 5 4 3 2 1 GAMUDA LAND(T12) SDN. BHD. (310424-M)

7 7 (FORMERLY KNOWN AS SALAK LAND DEVELOPMENT SDN. BHD.)


MENARA GAMUDA, PJ TRADE CENTRE, BLOCK D, N0. 8,

8 JALAN PJU 8/8A, BANDAR DAMANSARA PERDANA,


47820 PETALING JAYA,
SELANGOR DARUL EHSAN.
TEL:03-74913200 FAX:03-77241992

CONTRACTOR:

PERSIARAN COVE UTAMA


BAHTERA MEWAH ENTERPRISE (MA0074075-U)
NO.9, JLN. DD3A/5, TAMAN DATO' DEMANG,
A BANDAR PUTRA PERMAI,
43300 SERI KEMBANGAN,SELANGOR

Plastic Barrier
with Hoarding
ELITE HIGHWAY GAMUDA COVE

1.0m 1.0m
A 3.5m 3.5m 3.5m 2.0m 3.5m 3.5m 3.5m 3.5m
A
0.5m

TYPICAL CROSS SECTION


NOTES:-
1. All signs faces shall be fluorescent orange prismatic retro-reflective sheeting.
2. Barrier should be continuous and interlocked along construction area. LEGEND:
8 7 100m 6 100m 5 100m 4 100m 3 100m 2 100m 1
3. Barrier concrete shall be used at area which involve excavation works.Concrete Barrier shall be PLASTIC BARRIER WITH HOARDING
interlocked and sand bag shall be placed behind the concrete barrier for extra support in case TEMPORARY TRAFFIC SIGN
the recovery area behind the concrete barriers is less than 0.5m wide. DRAWING TITLE:

4. Blinker to be placed 5m interval at taper and 20m interval at straight stretch. FLASHING AMBER LAMP/ BLINKERS STAGE 4
5. Delineators string/blinkers are placed at all approach to and along the construction area. TRAFFIC DIRECTION TCP INSTALLATION
6. Flagman will be station at access to work site for construction vehicle enter or exit the working EDGE PREMIX
30 40 area. EXISTING ROAD LINE
STEEL FRAME
(CANTILEVER)
7. For night work, the contractor shall install a Flood Lighting at working area. FLAGMAN
PANDU CERMAT PANDU CERMAT
8. This Traffic Management Plan was prepared following Standard LLM Guidelines DRAWN BY:
NIK
CHECK BY:
NIK
FLASHER ARROW SCALE: DATE:
N.TS JANUARY 2024
WORKING AREA DRAWING NO: REV:

GAMUDA/SSPSB/TCP/03 00

You might also like