You are on page 1of 1

PEMERINTAH KABUPATEN SUMBAWA BARAT

DINAS PEKERJAAN UMUM PENATAAN RUANG


PERUMAHAN DAN PEMUKIMAN
JL. Undru No.2 Taliwang - KSB Telp. ( 0372 ) 81503

DESIGN DRAWING
NAMA KEGIATAN
PEMBANGUNAN INFRASTRUKTUR
STA 0+200 STA 0+225
Galian
Jalan Raya Galian
Jalan Raya
DESA POTENSIAL POTO TANO

1.10 1.10
NAMA PEKERJAAN

0.98

0.95
Pas.batu existing
Uditch 80/90/120
Pas.batu existing
Uditch 80/90/120
DED PENATAAN DRAINASE
0.94 Pasir Urug Pasir Urug
0.94 PERMUKIMAN POTO TANO
Pas.batu existing Pas.batu existing

LOKASI PEKERJAAN
KEC. POTO TANO

PENGESAHAN
DIAJUKAN OLEH

KONSULTAN PERENCANA

Datum +0.000 Datum +0.000


CV. ARTHA DINAMIKA
8.436

8.436

8.436

8.436

8.436

8.395

8.395

8.395

8.395

8.395
Elevasi Rencana ( m ) Elevasi Rencana ( m )
8.420

8.420

8.420

8.420

7.990

8.340

8.340

8.340

8.340

7.910
Elevasi Tanah Asli ( m ) Elevasi Tanah Asli ( m )
7.436

7.436

7.394

7.394
Elevasi Dasar Saluran ( m ) Elevasi Dasar Saluran ( m )
Jarak (m) 2.89 2.00 3.00 3.00 2.00 2.07 Jarak (m) 2.89 2.00 3.00 3.00 2.00 2.07

WAHIDIN, ST
DIREKTUR

MENGETAHUI / MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

STA 0+250 STA 0+275


Galian Galian
Jalan Raya Jalan Raya

1.10 1.10

ISMU RAHMAN, ST
0.91

0.93
NIP. 19790121 201001 1 015
Pas.batu existing Pas.batu existing
Uditch 80/90/120 Uditch 80/90/120
0.94 0.94
Pasir Urug Pasir Urug

MENGETAHUI / MENYETUJUI
Pas.batu existing Pas.batu existing
KEPALA BIDANG TATA RUANG

Datum +0.000 Datum +0.000 ABDUL AZIS, ST., M.Eng


NIP.19800215 200803 1 002
8.353

8.353

8.353

8.353

8.353

8.311

8.311

8.311

8.311

8.311
Elevasi Rencana ( m ) Elevasi Rencana ( m )
8.260

8.260

8.260

8.260

7.830

8.240

8.240

8.240

8.240

7.810
Elevasi Tanah Asli ( m ) Elevasi Tanah Asli ( m )
JUDUL GAMBAR SKALA
7.353

7.353

7.311

7.311

Elevasi Dasar Saluran ( m ) Elevasi Dasar Saluran ( m )


Jarak (m) 2.89 2.00 3.00 3.00 2.00 2.07 Jarak (m) 2.89 2.00 3.00 3.00 2.00 2.07

KODE GAMBAR NO. GAMBAR JUMLAH GAMBAR

You might also like