Project Title Job No. SNA 6031 Sheet No.

Calculation for Tie Beam - Tower B


Made by Lem Date

Tie Beam Info.


Using (CHS 286mm x 10mm THK x 68.09 kg/m) Design Info.
2
Cross Sectional Area = 86.74 cm Moment = 4648.85 kNm
Ratio for Local Buckling (D/t) = - Height of the Mast, H = 58.8 m
Radius of Gyration = 9.76 cm Horizontal Force, ET = 156.2 kN
4
Second Moment of Innertia = 8270.5 cm Factor of Safety = 1.5
3
Elastic Modulus = 578.36 cm Force 1 angle, ø1 = 44 Degree
3
Plastic Modulus = 762.09 cm Force 2 angle, ø2 = 23 Degree
Effective Length, LE = 5000 mm Force 3 angle, ø3 = 1 Degree
2
Compressive Strength = 237 N/mm

Supporting R.C. Info.


2
Additional Reinf = T 12 - 200 , Asprov = 565.487 mm /m
Steel Grade, fy = 460 N/mm2
Length of supporting RC = 10 m

Calculate Horizontal Force


Force due to moment = 79.062 kN
Total Horizontal Force = 352.89 kN
Nodal Force
in all cases = 176.45 kN

Consider Forces in Case 1


F1 cos (ø1) = Node A's force
Force 1, F1 = 245.29 kN
Resultant force, Fo = F1 sin (ø1)
Fo = 170.39 kN
F2 sin (ø2) + Fo = F3 sin (ø3)
F3 = ( F2 sin (ø2) + Fo ) / ( sin (ø3) )
F2 cos (ø2) + F3 cos (ø3) = Node B's force
Hence,
Force 2, F2 = -407.2 kN
Force 3, F3 = 551.38 kN

Consider Forces in Case 2 Consider Forces in Case 3


F1 sin (ø1) + Node A's force = 0 F1 cos (ø1) = Node A's force x cos (45o)
Force 1, F1 = -254 kN Nodal force x cos (45o) = 124.767
Resultant force, Fo = F1 cos (ø1) Force 1, F1 = 173.446 kN
Fo = -182.7 kN Resultant force, Fo = F1 sin (ø1) + Node A's force x sin (45o)
F2 cos (ø2) + F3 cos (ø3) = Fo Fo = 245.252 kN
F3 = ( Fo - F2 cos (ø2) ) / ( cos (ø3) ) F2 sin (ø2) + Fo + Node B's force x sin (45o) = F3 sin (ø3)
F2 sin (ø2) + Node B's force = F3 sin (ø3) F3 = ( F2 sin (ø2) + Fo + Node B's force x sin (45o) ) / ( sin (ø3) )
Hence, F2 cos (ø2) + F3 cos (ø3) = Node B's force x cos (45o)
Force 2, F2 = -441.6 kN Hence,
Force 3, F3 = 223.8 kN Force 2, F2 = -904.23 kN
Force 3, F3 = 957.264 kN

Please note that the forces are consider in tension and compression direction
Maximum forces = 957.27 kN
Project Title Job No. SNA 6031 Sheet No.
Calculation for Tie Beam - Tower B
Made by Lem Date

Checking for Tension Member


Tension force = 957.27 kN
2
Pt = 275 N/mm x 86.74 x 10 2 mm2 = 2385350 N
= 2385.4 kN > 957.27 kN ~ OK

Checking for Compression Member


Tension force = 957.27 kN
λ = 51.23
2
Compressive Strength, Pc = 237 N/mm
2
Compressive Capacity = 237 N/mm x 86.74 x 10 2 mm2 = 2055738 N
= 2055.7 kN > 957.27 kN ~ OK

Checking for tension in existing concrete

Force, Fx (Case 2) = 352.89 kN


Force, Fy (Vertical Force) = 0 kN (Negligible)
Force, Fz (Case 1) = 352.89 kN

Providing Addition Reinforcement = T 12 - 200 at top layer


Tension capacity (Fx, Fz) = 65031 N/m = 65.031 kN/m
Minimum Length Required = 5.4265 m ~ OK

** Please note that the compression strength of the existing


concrete is much bigger than applying force, checking is not
required.