CHAIRMAN’S
MESSAGE
It is a diligent task to maintain G – Go Live of the New MMS in
the efficiency and dynamism in Luzon and Visayas
the Wholesale Electricity Spot O – Open WESM Mindanao
Market (WESM) while fostering R – Renewable Energy Market
fair competition among the Operations
market participants at the same A – Anti-Competitive Behavior
time. The Philippine Electricity (ACB) Framework Formulation
Market Corporation (PEMC) D – Derivatives Market for
stood unperturbed amidst these Electricity
challenges and accomplished a I – Integrated Management System
successful 2019. It has always (IMS) Certification
been our resolute commitment A – Audit of Market Operations and
to provide quality services to our Metering Review
stakeholders and industry partners, T – Training and IEC Initiatives
and that’s the least that PEMC will E – Enforcement and Compliance
deliver in the coming years. Regime
Noel V. Aboboto
Chairman, Philippine Electricity Market
Board of Directors
4 | |5
for the WESM Compliance Officers
PRESIDENT’S (WCO) Accreditation and developed the
Ensuring market readiness System (CRSS). The audit PREMS were installed and Furthermore, PEMC’s assessment and
for the Enhanced WESM achieved near completion configured successfully. recommendations on the price spikes
Design with the issuance of PEMC likewise conducted that occurred from 10-15 April 2019 were
PEMC conducted software certificates for pilot workshops for the RE provided to the Senate Committee on
consultation meetings key modules by the external Market participants and Energy.
with market participants auditor. started the preparations for
to uncover challenges, participant registration. The past year was marked by these
especially for the WESM Establishment of the notable achievements. I believe that the
Mindanao implementation. Renewable Energy Market Promoting a Culture of burning enthusiasm and commitment
Together with the (RE Market) Compliance of PEMC’s Management and staff will
Independent Electricity PEMC, in coordination PEMC implemented a prove to be instrumental in making PEMC
Market Operator of the with the Department of streamlined process where a premier electricity market and a true
Philippines (IEMOP), Energy (DOE) and United initial non-compliances champion of a multitude of opportunities
PEMC presented Nations Development undergo pre-assessment for growth in the spot market and the
recommendations Programme (UNDP) prior to endorsement for entire power industry.
addressing commercial facilitated and approved investigation. In 2019,
and operational structures the user acceptance test PEMC investigated a total With our concerted efforts – yours
specific to Mindanao. reports for the completion of 133 cases, composed and ours – we truly believe that
Moreover, PEMC facilitated of the Philippine Renewable of 57,680 intervals, two together, we will achieve increased
the audit of the New Market Energy Market System percent (2%) of which accessibility to electricity, spur
Management System (PREMS). Moreover, the was found in breach. market growth, and sustain industrial
(NMMS) and the Central main site and disaster PEMC likewise initiated and economic prosperity. Oscar E. Ala
Registration and Settlement recovery site for the a rules change proposal President
6 | |7
Intervals Endorsed For Investigation
ENFORCEMENT AND Jan – Dec 2019 Billing Period
COMPLIANCE
4,000
MOR*
RTD**
3,653
Jan – Dec 2019
3,280
3,000
2,269
Participant compliance performance 2,000
99.05% 0.95%
For Investigation
1,697
Compliant/Justified
1,448
1,380
COMPLIANCE WITH THE
1,000
1,137
MUST OFFER RULE
1,028
933
833
832
824
770
753
742
704
Findings No. of Intervals Percentage
578
550
151
464
Compliance with the
374
386
71
34
Compliant/Justified
Must Offer Rule 0
1,899,593 99.05%
Jan - Dec 2019 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
For Investigation 18,232 0.95% *MOR - Must Offer Rule
Total Intervals **RTD - Real-time Dispatch
1,917,825
Grand Total 1,917,825 100.00% y Conferences with WESM
Participants and plant visits to
facilities in Luzon and Visayas
for better appreciation and
99.65% 0.35% understanding of generators’
Compliant/Justified For Investigation
operations
COMPLIANCE WITH THE
Findings
RTD RULE
No. of Intervals Percentage
y Improved reporting of WESM
Compliance with Participant compliance and status
RTD Schedules
Compliant/Justified 1,911,166 99.65%
Jan - Dec 2019 of investigations
For Investigation 6,659 0.35% Total Intervals
1,917,825
y Drafting of the accreditation
Grand Total 1,917,825 100.00% program for the WESM
Compliance Officers (WCOs)
8 | |9
MARKET ASSESSMENT HIGHLIGHTS (NOV 2018 - NOV 2019) Available Capacity
CAPACITY PROFILE Capacity Not Offered/Nominated
Outage Capacity
26-Nov-2018 to 25-Feb-2019 (Cool Dry) 26-Feb-2019 to 25-May-2019 (Hot Dry) 26-May-2019 to 25-Nov-2019 (Rainy) Demand plus Reserve Schedule
22,000
20,000
18,000
16,000
14,000
Megawatts
12,000
10,000
8,000
6,000
4,000
2,000
0
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
SPEX Malampaya
49%
persistent in June.
20%
19%
20%
20%
15%
17%
14%
retained their spots since 2018.
to manual load dropping
12%
11%
4 SO-initiated in Visayas
7%
9%
7%
3%
3%
6%
3%
6%
6%
6%
2%
2%
Cool Dry Season
1%
2 MO-initiated MMS stoppage
0% System-wide
Sual CFTPP Sta. Rita NGPP Pagbilao CFTPP Leyte A GPP Mariveles CFTPP Kalayaan PSPP Magat HEP Hot Dry Season
Ilijan NGPP Masinloc CFTPP San Lorenzo NGPP QPPL CFTPP San Gabriel NGPP San Roque HEP Rainy Season
MARKET ASSESSMENT HIGHLIGHTS (NOV 2018 - NOV 2019) Bat 0.05%
Wind 2.13%
Bat - Battery
Biof 0.81%
Wind 1.20%
Biof - Biofuel
HERFINDAHL–HIRSCHMAN INDEX (HHI) Biof 2.19%
Geo - Geothermal
Solr 1.40%
Cool Dry Hot Dry Rainy Cool Dry Hot Dry Rainy Cool Dry Hot Dry Rainy
100% 2%
Geo 11.36%
29%
25%
39%
NatG 25.94%
27%
20%
Hyd 12.59%
8% 10%
0%
Registered Capacity Offered Capacity Actual Generation
NatG 16.38%
Note: No computation of HHI for intervals under Market Intervention/Market Suspension
100% 7,000
San Miguel Corporation • Improvement in the congestion
6,944
6,937
22% 18%
25% situation as the number of
4%
4%
Aboitiz Power intervals with Price Substitution
75% 6% 5,250 Methodology went down by
5% 5%
11% around 21% as compared to the
No. of Intervals
19% 21% First Gen Corporation 2018 billing year, noting that the
50% 15% Samboan-Amlan line in the
3,500 Cebu-Negros islands was the
20% 19% Power Sector Assets & Liabilities Management Corp. most frequently congested line.
20%
25% • Intervals imposed with
Semirara Mining and Power Corp. 1,750
administered pricing were more
30% 31%
24% evident in 2019 with the Hot Dry
1,258
1,293
274
258
245
243
Luzon Season having the most Market
0% Others
57
11
0 Visayas Intervention events.
Registered Capacity Offered Capacity Actual Generation
Normal Congestion Pricing Error Notice Administered Price Secondary Cap
market, as follows: (a) Twelve y Review of Market Monitoring
WESM (12) Monthly Monitoring Reports Indices and subsequent
The Arbitral Tribunal, composed of Atty. Teodoro Kalaw, Atty. Eduardo Ceniza,
2019, and deliberated on issues y Completed the review of 41
related to the prolonged testing ECO Investigation Reports and
and Atty. Dranyl Jared Amoroso, issued the final awards for the said cases on 19
and commissioning (T&C) of deliberated upon Motions for
August 2019. Copies of the dispute resolution reports are available in the PEMC
plants in the WESM Reconsideration
website.
y Reviewed Market Intervention (MI) y Conducted a historical review
MARKET SURVEILLANCE COMMITTEE (MSC) events that were declared in 2019, of the status of non-compliance
and prepared the corresponding cases
Primarily monitors and assesses the trading activities in the Review Reports for the PEM Board
WESM to ensure market efficiency and fair competition
14 | | 15
PEM AUDIT COMMITTEE (PAC) MO’s performance based on the y Secured on 30 October 2019
DOE-approved Market Operator the PEM Board’s approval on
Responsible for the effective and independent audits of the Performance Standards (MOPS). the proposed Joint Conduct of
operation of the market and of the Market Operator (MO), review
of metering installations and arrangements, and special audits the 7th Market Operations Audit
Started developing a new set of
as directed and/or required by the PEM Board and 4 th Review of Metering
performance measures aimed at
Installations and Arrangements
monitoring and assessing the MO
y Provided oversight on the Market Provided periodic updates on the covering the period 26 June 2016
performance under the enhanced
Readiness Assessment (MRA) MRA and MRSC activities to the to 25 December 2019, and the
WESM design and operations
activities conducted by a third- PEM Board, DOE, and ERC procurement of external audit
party expert, Sapere Research services for the same
y Supervised the software
Group Ltd (Sapere), from April to
certification of five (5) remaining
August 2019. The readiness of the
New Market Management System RULES CHANGE COMMITTEE (RCC)
Market Operator (MO), National
(NMMS) critical components
Grid Corporation of the Philippines Facilitates the formulation of new Market Rules and Manuals
conducted by an external auditor, and any amendments thereto, the enhancement of the market
– System Operator (NGCP-SO),
Intelligent Energy Systems Ltd Pty design, and the refinement of market processes and operations
Metering Service Providers
(IES) appropriate for the current environment
(MSPs), WESM Participants, and
PEMC were assessed to ensure y Supervised the software For 2019, the RCC duly processed and endorsed to the PEM Board 19 proposals
the effective transition to the certification audit of the NMMS to amend the WESM Rules, Retail Rules, and various Market Manuals in the
enhanced WESM design and and Central Registration and following areas –
operations in Luzon and Visayas Settlement System (CRSS) y Market Governance – Market contingency plan during
and implementation of WESM in enhancements and fixes, and audits, monitoring of MSPs’ prolonged market system failure,
Mindanao other MO systems and tools performance, forecast accuracy requirements and procedures
for the enhanced WESM design of must-dispatch generating units, related to metering, constraint
Endorsed the recommendations
and operations. The audit by IES and WESM Compliance Officers’ violation coefficients, and timing of
of Sapere for the creation of
started in October 2019 and was Accreditation Program market runs
the Market Readiness Steering
still ongoing as of December 2019
Committee (MRSC) composed of y WESM Operations – Registration y Retail Market – Responsibilities
champions from PEMC, MO, NGCP- y Reviewed the quarterly and annual process and timeline, initial of participants, switching of
SO, and the Philippine Independent Market Operator Performance prudential requirements, Suppliers, and requirements for
Power Producers Association Monitoring Reports covering the retail metering installations
(PIPPA) in June 2019 to ensure period 26 September 2018 to 25
The proposals were endorsed to the DOE for final approval and promulgation.
that the go-live conditions September 2019 and presented
Most of these changes are intended to be in effect upon the commencement of
identified during the assessment the same to the PEM Board. The
the enhanced WESM design.
are addressed reports provide the results of the
monitoring and assessment of the
16 | | 17
TECHNICAL COMMITTEE (TC) RENEWABLE
Tasked to monitor and review technical matters under the ENERGY NOW!
WESM Rules, the Philippine Grid Code, and the Philippine
Distribution Code in relation to the operation of the spot market
The passage in 2008 of RA 9513 or the Renewable Energy Act aims
to further accelerate the development of the country’s renewable
In 2019, the TC accomplished the following –
energy resources, which include hydropower (which we have been
y Developed a work plan to assess y Provided the RCC with comments
BATTERY
using since the 1950s), geothermal, wind, solar, and biomass.
and provide recommendations and inputs on the Proposed Battery Energy Storage Systems
on the increased integration Amendments to the WESM Rules are beginning to be utilized
especially in remote areas to
of Variable Renewable Energy and Various WESM Manuals complement renewable energy SOLAR
(VRE) resources and other new technologies.
y Presented views and Solar cells contain silicon layers.
technologies into the WESM When sunlight strikes these
recommendations on technical layers, electrons flow from the
y Conducted consultation activities concerns raised by WESM silicon and are harnessed to
generate electricity. Potentially,
with the MO, NGCP-SO, ERC, and Participants on their participation
the amount of power from the
the Market Participants for the in the market, such as Mactan sun the earth receives is more
WIND
development of the MO-SO-DU-EG Electric Company and Toledo than what the entire world
The wind spins blades that turn turbines to consumes in a year.
Coordination Protocol Power Corporation generate electricity. The efficiency of wind plants
is highly dependent on the weather, and modern
y Provided assistance to the PAC in wind turbines produce electricity 70-85% of the
the procurement of the external time. Advancements in wind turbine technology
include longer blades, taller towers, stronger
auditor for the joint conduct of the
materials, and cloud computing with drone
7th Market Operations Audit and 4th maintenance systems.
HYDRO
Review of Metering Installations
The kinetic energy of running water is used to
and Arrangements turn turbines, which in turn generate electricity.
Dams are built to artificially create a steady flow
of water, but run-of-river hydroelectric systems
use less intrusive means to
redirect water to generate
GEOTHERMAL electricity.
18 | | 19