You are on page 1of 2

NITIN GOKUL KOLHE OBJECTIVE

Looking for a challenging role in a reputable organization to utilize my


technical, database, and management skills for the growth of the
organization as well as to enhance my knowledge about new and
emerging sector.

EXPERIENCE
Pawar Engineer's And Rcc consultant 25/08/2020
Contact Site engineer -
Role & Responsibilities: 18/6/2021
 nitinkolhe584@gmail.com
➢ To plan the daily work at site
 +919284366246 ➢ Design all work plans and identify and resolve all
installation issues for civil field
 At post vitave
Tel - Chandwad
Dist -
projects and coordinate with procurement department to
Nashik
Pin code - 423101
ensure adherence to all
Skills construction schedule.
➢ To correct the deviation between defined plan & actual
Planning and Management 20%
work on site.
➢ To maintain the organization’s labour and shifts record
required as per
Design Of Rcc Structure 80%
department by software guidelines.
➢ Billing between organization and contractors at the end of
month.
Estimating and costing of perticular80%
➢ To Providing information to supervisors, co-workers, and
project
subordinates by telephone, in
written form, e-mail, or in person.
➢ Document all civil field activities and perform regular
inspection to check progress of
Site
➢ To Inspecting equipment, structures, or materials to
identify the cause of errors or other
problems or defects.
➢ Document all civil field activities and perform regular
inspection to
check progress of all projects.

EDUCATION
Maharashtra State Board Of Secondary And Higher secondary
Education , Pune 2014
SSC
69.00%

Maharashtra State Board Of Secondary And Higher secondary


Education , Pune 2016
HSC
53.69%
Maharashtra State Board of Technical Education 2019
Diploma In Civil Engineering
72.42%

Savitribai Phule Pune University 2020


SE
8.69 SGPA

Phule Pune University 2021


TE
9.43 SGPA

PROJECTS
Partially replacement of fine aggregate by using foundry sand in
concrete
Now a day the worldwide consumption of sand as fine aggregate in
concrete production is very high. So in this study is volumetric
replacement (0%, 15%, 30% ) of sand. Out of these 5 replacement levels
best 3 were choose by trial works for M20 grade of concrete. The
concrete was tested for slump test, compression test, flexural test, split
tensile test for 7 & 28 days and acid attack test for 7 days.

You might also like