LEVANTAMIENTO TOPOGRÁFICO DE LA POLIGONAL PARA LA

REFORMULACION DEL EXPEDIENTE TECNICO DEL PROYECTO:


“CONSTRUCCION, REHABILITACION DEL CAMINO: TRAMO CALLE REAL
(BARRIO CASTILLA) AL PARAJE TIRANA PAMPA, EN EL C.P. LA PUNTA,
DISTRITO DE SAPALLANGA, PROVINCIA DE HUANCAYO - JUNIN”

“CALLE REAL (BARRIO CASTILLA) – PARAJE


TIRANA PAMPA”
(4,320.45 Km)

CÁLCULOS Y AJUSTES
DE LAS LECTURAS GPS - POLIGONAL

CORDENADAS AJUSTADAS
ESTACION BASE -PRINCIPAL
Name Grid Grid Elevation (m)
Northing (m) Easting (m)
PC - 01 8’661,989.074 480,910.858 3,519.755

PUNTOS DE CONTROL –POLIGONAL BASICA


Combined Grid to
Grid Northing Grid Easting
Name Elevation (m) Ground Scale
(m) (m)
Factor
BM - 01 8’661,050.434 480,047.250 3,257.333 0.999991176807

Project Summary

Project name: Poligonal Principal LA PUNTA


Surveyor: HERSAC COMPANY SAC
Comment: Poligonal Principal Enlazada a los Punto
Base Principal
Linear unit: Meters
Projection: UTMSouth-Zone_18
Geoid: egm96peru
Adjustment Summary

Adjustment type: Plane + Height, Constraint


Confidence level: 95 %
Number of adjusted points: 14
Number of plane control points: 1
Number of used GPS vectors: 7
A posteriori plane UWE: 2.673357 , Bounds: ( 0.7064636 , 1.292988 )
Number of height control points: 2
A posteriori height UWE: 0.7151533 , Bounds: ( 0.5892985 , 1.41164 )

Used GPS Observations

Horizontal Vertical
Name dN (m) dE (m) dHt (m)
Precision (m) Precision (m)
PC 01−BM 01 23311.918 131029.159 2394.732 0.024 0.050

GPS Observation Residuals

Horizontal Vertical Precision


Name dN (m) dE (m) dHt (m)
Precision (m) (m)
PC 01−BM 01 23311.918 131029.159 2394.732 0.024 0.050

Control Points
Name Grid Northing (m) Grid Easting (m) Elevation (m)
PC 01 8’661,989.074 480,910.858 3,519.755

Adjusted Points
Name Grid Northing (m) Grid Easting (m) Elevation (m)
BM 01 8’661,050.434 480,047.250 3,257.333