Detailed Mesurmnet Sheet-RA3

PLINTH BEAM VILLA W3/T1 342


SNO'S GRIDE length breadth NO'S Quantity UNIT Remarks
1 A5 to c5/A1 to a5 29'6 35'3'' 1*1 829.55 SFT
2 A1 to A2 13'5'' 6'' 1*1 6.75 SFT
3 A1 TO B1 10'9'' 8'' 1*1 7.194 SFT
4 B1 TO C1 12' 4'' 1*1 3.96 SFT
5 C1 to C2 11'7'' 4'' 1*1 3.861 SFT
TOTAL 851.315 SFT

GROUND FLOOR SLAB VILLA W1 \T1 344


SNO'S GRIDE length breadth NO'S Quantity UNIT Remarks
1 A1 to A5/A1 to a5 35'3'' 23'5'' 1*1 829.55 SFT
2 A1 to A2 13'5'' 6'' 1*1 6.75 SFT
3 A1 TO B1 10'9'' 8'' 1*1 7.194 SFT
4 B1 TO C1 12' 4'' 1*1 3.96 SFT
5 C1 to C2 11'7'' 4'' 1*1 3.861 SFT
TOTAL 851.315 SFT

GROUND FLOOR SLAB VILLA W1 \T1 346


SNO'S GRIDE length breadth NO'S Quantity UNIT Remarks
1 A1 to A5/A1 to a5 35'3'' 23'5'' 1*1 829.55 SFT
2 A1 to A2 13'5'' 6'' 1*1 6.75 SFT
3 A1 TO B1 10'9'' 8'' 1*1 7.194 SFT
4 B1 TO C1 12' 4'' 1*1 3.96 SFT
5 C1 to C2 11'7'' 4'' 1*1 3.861 SFT
TOTAL 851.315 SFT

PLINTH BEAMS
GROUND
SNO'S VILLA'S type UNIT
FLOOR QTY
2 E4/T1 340 1037.3076 SFT
3 W3/T1 341 825 SFT
4 W1/T1 347 825 SFT

TOTAL 2687.308 SFT


PILES CHIPPING & SOIL CUTTING

GROUND
SNO'S VILLA'S UNIT
FLOOR QTY
2 W3/T1 341 1800 SFT
3 W1/T1 347 1800 SFT
4 E4/T1 340 2432 SFT
TOTAL 6032 SFT

M/s VENKATA PRANEETH DEVELOPERS PVT. LTD M/s Bhavens Global


Date: Date: