To, Date:19-11-2021
AGM Project Bill: RA3
PRANEETH PRANAN KNIGHT WOODS
AMEENPUR
ABSTRACT
1 Plie Caps and Plinth Beam PCC and RCC Works 5543 Sft 28 155204
2 Ground floor Columns ,Slab Beams,Staircase & Slab Casting 5380 Sft 98 527240
Ground floor Brick work up to Slab Bottom inc of Toilet Ledge Walls &
3 0 Sft 56 0
Lintels casting
4 Ground floor 2 Coats Internal Plastering 0 Sft 42 0
Ground floor 2 Coats 2 coats External Plastering inc of Projections &
5 0 Sft 42 0
Elevation etc.,
Ground Floor Completion of Patch Works and Handling Over the Floor
6 0 Sft 14 0
to Client
FIRST FLOOR 0 Total (Rs) 682444
First Floor Columns ,Slab Beams,Staircase & Slab Casting inc of
7 825 Sft 98 80850
Projections & Elevation etc.,
First Floor Brick work upto Slab Bottom inc of Toilet Ledge Walls &
8 0 Sft 56 0
Lintels casting inc of Elevation etc.,
9 First floor 2 Coats Internal Plastering 0 Sft 42 0
First Floor 2 coats External Plastering inc of Projections & Elevation
10 0 Sft 42 0
etc.,
First Floor Completion of Patch Works and Handling Over the Floor to
11 0 Sft 14 0
Client
12 Constructing of Compound Wall inc Finishing 0 Sft 28 0
TERRACE Total (Rs) 80850
RCC works for Dummy Columns, Head Room & OHT Works at
13 0 Sft 112 0
Terrace area
14 Brick work for Parapet Wall, Head Rooms and OHTs at Terrace area 0 Sft 56 0
2 Coats Plastering Parapet Wall, Head Rooms and OHTs at Terrace
15 0 Sft 56 0
area
16 Terrace Waterproofing Works 0 Sft 42 0
17 Completion of Patch Works and Handling Over the Floor to Client 0 Sft 14 0
Job: Civil Works below Plinth Beam for Villa Nos.283 - 375, Unit: PPK Total (Rs) 0
Job Works for Dismantling the Existing Pile and Soil Excavation up to
the required depth and the excavated soil shifting from Villa to the 12705 sft 18.5 235043
specified location by client, Plinth Beam soil levelling, Back Filling,
Consolidation, Compacting and ATT applying for works etc., the
18 complete finished item of work as per instruction by engineer incharge
Total (Rs) 998337
Authorised Signatory
Declaration:
a) Certified that all the particulars given above are true and correct.
Qty
e qty
Bill No RA-3
already
claimed
claimed
Qty.Now
cumulativ
Pile cap breaking
6.00
21
15
coloum and SLAB
18
12
Brick work
0
0
6.00 0.00
internal plastering
GF
0
0.00
0
External plastering
0.00
0
0 Patch work and Handover
0
coloum and SLAB
9
8
Brick work
1.00 0.00
0
0
internal plastering
0
0.00
0
External plastering
FF
MESUREMENT SHEET-RA3
0
0
0.00
Compound wall
0.00 0.00
0
0
0.00
0.00
Parapitwall platering
0.00
0
0
Head room
Water proofing
0.00
0
0
Patch work
0.00
0
0