You are on page 1of 1

FUTURE LINE (RIGHT)

MAINLINE (LEFT)
FUTURE LINE (RIGHT)

CENTERLINE
MAINLINE (LEFT)

CENTERLINE
10.94 15.25
2.00 2.25 4.25

7.64 3.30 2.25 5.55 7.45

2% 2%

4.40
2% 2%

5.38 Water Level


2:5
2:5
4.40

Water Level

FUTURE LINE (RIGHT)


FUTURE LINE (RIGHT)

MAINLINE (LEFT)
MAINLINE (LEFT)

CENTERLINE
CENTERLINE

10.51 15.69

2.00 2.25 4.25


7.21 3.30 2.25 5.55 7.89

2% 2%
2% 2%
5.41
2:5 2:5
4.40

Water Level

17.92
FUTURE LINE (RIGHT)

2.00 2.25 5.55 2.60


PROTECTION SLIGHTLY
MAINLINE (LEFT)

REINFORCED CONCRETE C20/25


B 04.12.19 SECOND ISSUE K.CH. K.B. A.TR.
CENTERLINE

2% 2% 1:2 A 15.07.19 FIRST ISSUE K.CH. K.B. A.TR.

1
1:
REV. DATE DESCRIPTION AUTHOR VERIFIED APPROVED
4% 0.15

KINGDOM OF SAUDI ARABIA


SAUDI RAILWAY COMPANY

FUTURE LINE (RIGHT)


2.00 2.25 4.25

MAINLINE (LEFT)
ENGINEER: CONTRACTORS JOINT VENTURE:

CENTERLINE
2% 2%

4.40

Water Level

DESIGNER:

PROJECT NAME:
CIVIL AND TRACK WORKS CONTRACT
CTW 120
JUBAIL TO DAMMAM LINK

DEFINITIVE RAILWAY ALIGNMENT DESIGN


DRAWING TITLE: FOR SUBSECTION 103-107

CROSS SECTIONS
FROM CH.106+775.00 TO CH.106+875.00

SCALE: DRAWING No.


1:200
DWG W1 AL 6050 B