You are on page 1of 1

FUTURE LINE (RIGHT)

MAINLINE (LEFT)

CENTERLINE
10.26

2.25

2% 2%

10.31

4.76 5.55

CONVEYOR
17.92 BELT

10.56

FUTURE LINE (RIGHT)


14.26 18.78

MAINLINE (LEFT)

CENTERLINE
1.54 1.00 2.60 3.30 2.25 5.55 2.60 1.00 1.31
PROTECTION SLIGHTLY PROTECTION SLIGHTLY
REINFORCED CONCRETE C20/25 REINFORCED CONCRETE C20/25

10.26
1:
1 2% 2% 1:2
1:2

1
1:
0.15 4% 4% 0.15

FUTURE LINE (RIGHT)


MAINLINE (LEFT) 2.25

CENTERLINE 2% 2%

FUTURE LINE (RIGHT)


MAINLINE (LEFT)

CENTERLINE
10.26

2.25

2% 2%

10.44 1.49

CONVEYOR
17.92 BELT

B 04.12.19 SECOND ISSUE K.CH. K.B. A.TR.

10.57 A 15.07.19 FIRST ISSUE K.CH. K.B. A.TR.

REV. DATE DESCRIPTION AUTHOR VERIFIED APPROVED


14.72 18.55

FUTURE LINE (RIGHT)


KINGDOM OF SAUDI ARABIA

MAINLINE (LEFT)
1.58 1.00 2.60 3.30 2.25 5.55 2.60 1.00 1.29
PROTECTION SLIGHTLY PROTECTION SLIGHTLY
SAUDI RAILWAY COMPANY

CENTERLINE
REINFORCED CONCRETE C20/25 REINFORCED CONCRETE C20/25

1:
1 2% 2% 1:2
1:2 ENGINEER: CONTRACTORS JOINT VENTURE:
1

10.26
1:

0.15 4% 4% 0.15
FUTURE LINE (RIGHT)

2.25
MAINLINE (LEFT)

CENTERLINE

2% 2% DESIGNER:

PROJECT NAME:
CIVIL AND TRACK WORKS CONTRACT
CTW 120
JUBAIL TO DAMMAM LINK

DEFINITIVE RAILWAY ALIGNMENT DESIGN


DRAWING TITLE: FOR SUBSECTION 103-107

CROSS SECTIONS
FROM CH.106+898.30 TO CH.107+000.00

SCALE: DRAWING No.


1:200
DWG W1 AL 6051 B
ORIGINAL A1