Professional Documents
Culture Documents
MAINLINE (LEFT)
CENTERLINE
10.26
2.25
2% 2%
10.31
4.76 5.55
CONVEYOR
17.92 BELT
10.56
MAINLINE (LEFT)
CENTERLINE
1.54 1.00 2.60 3.30 2.25 5.55 2.60 1.00 1.31
PROTECTION SLIGHTLY PROTECTION SLIGHTLY
REINFORCED CONCRETE C20/25 REINFORCED CONCRETE C20/25
10.26
1:
1 2% 2% 1:2
1:2
1
1:
0.15 4% 4% 0.15
CENTERLINE 2% 2%
CENTERLINE
10.26
2.25
2% 2%
10.44 1.49
CONVEYOR
17.92 BELT
MAINLINE (LEFT)
1.58 1.00 2.60 3.30 2.25 5.55 2.60 1.00 1.29
PROTECTION SLIGHTLY PROTECTION SLIGHTLY
SAUDI RAILWAY COMPANY
CENTERLINE
REINFORCED CONCRETE C20/25 REINFORCED CONCRETE C20/25
1:
1 2% 2% 1:2
1:2 ENGINEER: CONTRACTORS JOINT VENTURE:
1
10.26
1:
0.15 4% 4% 0.15
FUTURE LINE (RIGHT)
2.25
MAINLINE (LEFT)
CENTERLINE
2% 2% DESIGNER:
PROJECT NAME:
CIVIL AND TRACK WORKS CONTRACT
CTW 120
JUBAIL TO DAMMAM LINK
CROSS SECTIONS
FROM CH.106+898.30 TO CH.107+000.00