You are on page 1of 1

FUTURE LINE (RIGHT)

FUTURE LINE (RIGHT)


MAINLINE (LEFT)

MAINLINE (LEFT)
CENTERLINE

CENTERLINE
2.25 2.25

FUTURE LINE (RIGHT)


FUTURE LINE (RIGHT)

MAINLINE (LEFT)
MAINLINE (LEFT)

CENTERLINE
CENTERLINE

2.25
2.25
FUTURE LINE (RIGHT)

FUTURE LINE (RIGHT)


MAINLINE (LEFT)

MAINLINE (LEFT)
CENTERLINE

CENTERLINE
A 15.07.19 FIRST ISSUE K.CH. K.B. A.TR.

REV. DATE DESCRIPTION AUTHOR VERIFIED APPROVED

17.51 21.40
KINGDOM OF SAUDI ARABIA
2.25 14.21 3.30 2.25 5.55 13.60 SAUDI RAILWAY COMPANY

2% 2%
ENGINEER: CONTRACTORS JOINT VENTURE:

2:5
2:5
5.24
4.40

Water Level
DESIGNER:

PROJECT NAME:
CIVIL AND TRACK WORKS CONTRACT
CTW 120
JUBAIL TO DAMMAM LINK

DEFINITIVE RAILWAY ALIGNMENT DESIGN


DRAWING TITLE: FOR SUBSECTION 103-107

CROSS SECTIONS
FROM CH.106+325.00 TO CH.106+450.00

SCALE: DRAWING No.


1:200
DWG W1 AL 6047 A
ORIGINAL A1