You are on page 1of 1

FUTURE LINE (RIGHT)

FUTURE LINE (RIGHT)


MAINLINE (LEFT)

MAINLINE (LEFT)
CENTERLINE

CENTERLINE
10.26

2.25 2.25

2% 2% 2% 2%

FUTURE LINE (RIGHT)


FUTURE LINE (RIGHT)

MAINLINE (LEFT)
MAINLINE (LEFT)

CENTERLINE
CENTERLINE

2.25
2.25

2% 2%

2% 2%

B 04.12.19 SECOND ISSUE K.CH. K.B. A.TR.

A 15.07.19 FIRST ISSUE K.CH. K.B. A.TR.


FUTURE LINE (RIGHT)

REV. DATE DESCRIPTION AUTHOR VERIFIED APPROVED


MAINLINE (LEFT)

KINGDOM OF SAUDI ARABIA


CENTERLINE

SAUDI RAILWAY COMPANY

ENGINEER: CONTRACTORS JOINT VENTURE:

2.25

2% 2%

DESIGNER:

PROJECT NAME:
CIVIL AND TRACK WORKS CONTRACT
CTW 120
JUBAIL TO DAMMAM LINK

DEFINITIVE RAILWAY ALIGNMENT DESIGN


DRAWING TITLE: FOR SUBSECTION 103-107

CROSS SECTIONS
FROM CH.107+025.00 TO CH.107+057.95

SCALE: DRAWING No.


1:200
DWG W1 AL 6052 B
ORIGINAL A1