Professional Documents
Culture Documents
: COM-DPR-03
PROCEDURE FOR INTERNAL Page : 1 of 8
AUDIT Rev. : 0
Date :
Controls:
Preparation and approval
of audit plan
Procedure manual
Audit reports
Internal audit
Annual Plan schedule
NCR formats
Procedure for
corrective and Corrective and
preventive actions preventive actions
Resources:
Systems
Telephone
Manpower
Papers
COM-SFS-05
TITLE: Ref. : COM-DPR-03
PROCEDURE FOR INTERNAL Page : 2 of 8
AUDITS Rev. :0
Date :
Start
End
COM-SFS-05
TITLE: Ref. : COM-DPR-03
PROCEDURE FOR INTERNAL Page : 3 of 8
AUDITS Rev. :0
Date :
1.0 PURPOSE:
To verify whether quality activities and related results comply with planned arrangements and
to determine the effectiveness of the quality system.
2.0 SCOPE:
This procedure is applicable to all Internal Audits conducted at Ltd.
3.0 INPUTS:
3.1 Procedure for Corrective and Preventive Action COM-DPR-04
3.2 Procedure manual
3.3 Annual plan
3.4 Audit check list
COM-SFS-05
TITLE: Ref. : COM-DPR-03
PROCEDURE FOR INTERNAL Page : 4 of 8
AUDITS Rev. :0
Date :
4.1.7 M.R. organizes additional audits whenever the quality system requirements /
standard undergo any changes. These audits are carried out after all documents
are updated to meet the revised standard / Quality system requirements. MR may
also organize additional audits depending upon the status and importance of the
activity and results of the previous audit.
COM-SFS-05
TITLE: Ref. : COM-DPR-03
PROCEDURE FOR INTERNAL Page : 5 of 8
AUDITS Rev. :0
Date :
4.5 Reporting:
4.5.1 Non Conformance Report (NCR) as per the format Ref. is filled in with the
details of proposed corrective actions indicated with time frame “Expected date of
completion” (EDC) .Filled in Checklist for Auditors and Checklist for communication
is used.
COM-SFS-05
TITLE: Ref. : COM-DPR-03
PROCEDURE FOR INTERNAL Page : 6 of 8
AUDITS Rev. :0
Date :
4.7.2 QMD coordinator analyses and summarizes the NCRs clause wise/ department
wise.
4.7.3 Management Representative presents the above details (Health of Quality
System) in the Management Review meeting
4.7.4 Any suggestions/ decisions coming out of Surveillance Audits and Management
Review Meetings are monitored through Action Plan.
5. OUTPUT RECORDS:
Retention
Sl. no Description Format Responsibility
period
Corrective &
05 Preventive actions - Coordinator -
summary
COM-SFS-05
TITLE: Ref. : COM-DPR-03
PROCEDURE FOR INTERNAL Page : 7 of 8
AUDITS Rev. :0
Date :
ANNEXURE-I
01. If the Audit was carried out within the stipulated week then award 10 points.
Deduct one point for every working day delay after the stipulated week.
02. If the Audit Report (NCRs + Summary Report) was submitted within 48 working hrs. of
For every working day delay after the grace margin of 48 hrs. deduct one point (If HOD
03. If any system inadequacies are brought out (through NCRs) for the first time, (take into
account the length of time they have been remaining unnoticed) the credit must be given for
such findings give full rating of 10 for minimum of two inadequate NCRs. If there are no
04. If any non-conformances of non-conforming nature were brought out for the first time even
though they have been occurring for a long time and have not been pointed out in previous
IAs, the credit must be given for such findings. Give full rating of 10 for minimum of two
such NCRs. If no such NCRs are there you can give a rating of 1 (the minimum).
05. If the audit report is complete with all the columns of NCR form duly filled (precise
observation with objective evidence and explanation) and Summary Reports are completed,
give 10 points for a minimum of 5 good cases (NCRs) (two points for each NCR). Deduct
one point if NCR grid is not filled (This refers to only observation and explanation.
COM-SFS-05
TITLE: Ref. : COM-DPR-03
Page : 8 of 8
PROCEDURE FOR INTERNAL Rev. :0
AUDITS Date :
06. If the NCR’ belongs to other interacting processes, give two marks for each NCR, subject to a
maximum of ten points for five NCRs. If no such NCRs are there you can give a rating of one
point (minimum).
07 If the NCRs belong to various applicable clauses, it is an indication that the audit has been
thorough; otherwise, it can be construed as cursory and rated accordingly. Give full rating of
10 for a minimum of five different clauses covered. Correct clause attributions only to be
08. Rate the areas of improvements suggested in summary Audit Report. Rate them on their
merit. Give full rating of 10 for a minimum of five (5) implementable / usable suggestions, at
09. If the audit report is complete with all the columns of NCR forms duly filled with all
attributions to ISO 9001:2008 clause/sub-clause and document references, path of the NCRs,
give 10 points and make suitable deductions for things missing. Give two points for every
complete NCR (with no columns remaining unfilled). Maximum points that can be allotted is
10 marks.
COM-SFS-05