8 Stator Outer Diameter © 459.50 (-0.00,+0.15) Dig. Vernier Caliper 2 Nos. 4 Hours
9 Rotor Inner Diameter © 100.00 (+0.08) Dig. Vernier Caliper 2 Nos. 4 Hours
10 Concentricity 0.15 Dig. Vernier Caliper 2 Nos. 4 Hours Incoming Inform To
30 Stator Blanking 100 TON Power 11 Cleating Slot Tool Setting / 18 By Count 2 Nos. 4 Hours insp. Prod.
Press Blanking Tool
12 Identity Key Stator R 2.50 Visual 2 Nos. 4 Hours Report Incharge
13 Identity Key Rotor R 3 X 2 Nos. Visual 2 Nos. 4 Hours
14 Burr Level 0.05 Micrometer 2 Nos. 4 Hours
15 Stator Inner Diameter 330.00 (+0.03,+0.10) Dig. Vernier Caliper 2 Nos. 4 Hours
16 No. Of Slots 72 By Count 2 Nos. 4 Hours
17 Slot Width Tool Setting / 9.20 mm (±0.01) Dig. Vernier Caliper 2 Nos.
During Setting Of Inprocess
Inform To
40 Stator Punching Notching Machine 18 Slot Length Punching 32.00 mm (±0.01) Dig. Vernier Caliper 2 Nos. Check Prod.
Tool Tool Sheet Incharge
19 Slot Opening 3.80 mm (±0.01) Slip Gauge 2 Nos.
20 Concentricity 0.15 Dig. Vernier Caliper 2 Nos. 4 Hours
21 Burr Level 0.05 Micrometer 2 Nos. 4 Hours
22 Stator Outer Diameter 459.50 (-0.00,+0.15) OD Micrometer 2 Nos. 2 Hours Inprocess Inform To
50 Stator Cleating 75 TON Hydraulic 23 Stator Inner Diameter Hydraulic 330.00 (+03+0.10) Dig. Vernier Caliper 2 Nos. 2 Hours Check Prod.
M/c Machine
24 Core Length As per Drg. Std. (±1.00) Dig. Vernier Caliper 2 Nos. 2 Hours Sheet Incharge
Lot
All Required Measuring Final Hold/Segreg
60 Final Inspection 25 Dimensions PDIR As. Per Drg. Std. Instrument 5 Sample Each Lot Inspection ated/Rewor
Report k/Reject