You are on page 1of 2

 CONTACT

 REQUEST A QUOTE

The Weka Guard and Protector


door Thijs Luijsterburg | jul 8, 2021 | Boxcooler, Geen categorie, Green Solution

The Weka CuNi 90/10 boxcooler has natural anti-fouling capabilities. To keep the boxcooler protected from welding-
and stray currents and keep the natural anti-fouling capabilities, Weka developed the Weka Guard and the Weka
Protector.

The WEKA Guard is a device which protects the Boxcooler from being damaged by welding currents. The WEKA Guard
must be connected to the cooler and to the ship’s hull during the newbuilding process of the ship when the ship-based
electrical supply is not yet available. If not installed, the Boxcooler may suffer severe corrosion due to the welding
currents.

The WEKA Protector is a small device, which is placed in the vicinity of the Boxcooler to be protected. The WEKA
Protector will protect the Boxcooler from being damaged by ICCP-systems or stray currents originating from sacrificial
anodes. It also protects the boxcooler against marine growth by stimulating the natural anti-fouling capabilities of the
Copper-Nickel boxcooler. The WEKA Protector comes in three variants, the single-, dual-and multi-protector.

After installation of the Weka boxcooler, it need’s to be checked if it is installed correctly by measuring the electrical
resistance or electrical potential.

If the vessel is in drydock:


Measure resistance Ohm (Ω) when the guard is installed between copper tube sheet and ship’s hull the resistance
must not be less than 500 Ω. If no Ω measurement then the cooler is not isolated and must be checked and isolated
Privacy & Cookies Policy
again. For example, check for broken gaskets, broken bushings. The surroundings must be clean. No metal pieces /
chips in contact with the coolers on the top plate, or inside the sea chest.

When the vessel is afloat:


Disconnect the Guard, for a moment to measure the Electric Potential (mV) between naval brass tube sheet and ship’s
hull. Then reconnect the guard and do the same.

When the vessel is prior to delivery:


Install the Weka Protector. Check if LED is blinking, once every few minutes , to ensure the Weka Protector is in
working condition before installing. Disconnect the Guards and connect the Weka Protector with blinking LED, every
cooler one Weka Protector. Brown cable to naval brass tube sheet of cooler and the blue cable must be grounded to
the ship’s hull.
If any assistance is needed during these measurements, feel free to contact our office on info@wekamarine.com or call
+31 180 512 459 16.

Recent posts
Bureau Veritas successful classification for Weka galvanized steel cooler
Shipping-Technics-Logistics-Kalkar 2021
Weka Marine has relocated her office
Weka Marine Steel cooler delivery
Weka Marine is attending the Icelandic Fisheries Exhibition

Weka Marine OUR PRODUCT RANGE

Boxcoolers

Steel Coolers

Grid Coolers

Services

FOLLOW US

  

 CONTACT US

Weka Marine  |  All rights reserved 2020  |  +31 180 516588  |  info@wekamarine.com

Privacy & Cookies Policy

You might also like