You are on page 1of 1

Project 

Start  Project End 
NAME OF PROJECT Cost of Project Software Used Company
Date Date
Ruwais Refinery West (RRW) Restoration Project
1. USD 865 M P6 Mar 2017 Jan 2019 GS ENGINEERING & CONSTRUCTION
ADNOC, Ruwais, UAE
Nghi Son Refinery Project, 
2. P6 Jul 2013 Feb 2018 JGCS CONSORTIUM
Thanh Hoa, Tinh Gia, Vietnam USD 9 B

3. Saih Nihayda Compression DepletionProject (SNDC Project) USD 220 M P6 2010 2014 GS ENGINEERING & CONSTRUCTION


Saih Nihayda, Oman

4. Procurement and Mechanical Installation for Carbon Plant,  USD 10.7 M P6 2009 2010 TARGET ENGINEERING, UAE


in Emirates Aluminum (EMAL), Contract CM‐6668
Common Sulfur Project
5. Contract No. QGII‐CFP‐20 QAR 1,277,500,000 P3 Oct 2005 Jun2009 AL JABER ENEGY SERVICES
Ras Laffan Qatar
Contract No. C98‐C31
Replacement of Old Asbestos Chilled Water Piping System 
6. SAR 10 M P3 2005 2006 ABDULLATIFF AL‐ARFAJ TRADING CORP.
for JIC
Royal Commission for Jubail & Yanbu, KSA

USD ‐ US Dollars
QAR ‐ Qatari Riyal (1 USD = 3.64 QAR)
SAR ‐ Saudi Arabian Riyal (1USD = 3.75 SAR)

You might also like