Rajiv Rahadari Expressway, Hyderabad

-Proposed Redevelopment from Parade Ground to Lalbazar Junction


In the News..

Pictures showing road widening marking

At KV Picket school At Tivoli theater


Indicates relative traffic
Existing Road volume at junction

Lalbazar Junction

Trimulgherry
Junction
R.T.O. junction

Hanuman Temple
Junction

Karkhana junction

Secunderabad Club
Junction

Tivoli Junction

Parade Ground

Total distance from Parade Ground to Lalbazar : 5.2km


Towards
Proposed Road Widening to 60mts Lalbazar
(As per Govt. proposal)
Cost analysis of redevelopment

No of buildings to be demolished : 240


Approximate loss of built up area : 2,26,875 sqm
Total value of building loss
(At Rs 20,000/- per sqm ) :Rs. 454,00,00,000/-
(Four fifty four crores)
Cost of Skyway
Distance from Parade Ground to
Total Road width:
Lalbazar junction : 5.2 km
Cost per Km as per Govt. estimate :Rs.100 cr 60mts
Total cost :Rs.520,00,00,000/-
(Five hundred and twenty crores)
Cost of Road development
Structure to be
Towards
demolished
Distance from Parade Ground to Parade Ground
Lalbazar junction :5.2 Km Karkhana Junction Structure to be
retained

Cost per Km as per Govt. estimate :Rs 10cr

Total cost :Rs 52,00,00,000/-


(Fifty two crores)
Cost of Road development
Total cost for redevelopment : Rs 10,26,00,00,000/-
(Thousand twenty six crores)

* Loss of business and employment is not


considered in the above analysis.
* Cost of land acquisition are not considered

18mts Skyway
Proposed Road Widening to 40mts Towards
Lalbazar
(Alternate proposal)
Cost analysis of redevelopment
No of buildings to be demolished : 229
Approximate loss of built up area : 1,51,440 sqm
Total value of building loss
(At Rs 20,000/- per sqm ) :Rs 300,00,00,000/-
(Three hundred crores) approx.

Cost of road widening

Distance from Parade Ground to


Lalbazar junction :5.2 km Total Road width:
Cost per km :Rs 5 cr 40mts
Total cost :Rs 26,00,00,000/-
(Twenty six crores)

Cost of Grade separator at Trimulgherry Structure to be


Towards demolished
Total cost : Rs 250,00,00,000/- (approx) Parade Ground Structure to be
Kharkhana junction retained
Total cost of development : Rs 570,00,00,000/- (approx)
(Five hundred seventy crores)

* Loss of business and employment is not


considered in the above analysis.
* Cost of land acquisition are not considered
7.5mts Service road
on both sides

2 lane carriage way


Proposed Underpass and Roundabout at Trimulgherry Junction
Towards
Parade Ground

Towards Sainikpuri

Towards Bowenpally

Highway Roundabout Service road


Towards Hakimpet Underpass at road level
Structure to be demolished
Structure to be retained
Alternate Road Development
“Infrastructure as investment not
Connecting
merely expenditure”
ORR
•Skyway proposal is an expenditure
with no returns whereas alternate
road development kickstarts growth in
new areas while earning revenue for Development
the govt. along new route
resulting in
revenue to Govt
at Kowkur,
Yapral etc

Increase in
connectivity
from adjoining
areas
Existing Quarry proposed as a Park

Existing route through


Trimulgherry : 17.91km
Alternate route : 20.49km

Reduced vehicular load at


Trimulgherry junction Road skirting
defence area
JUBILEE BUS near AOC
STATION