Professional Documents
Culture Documents
PURPOSE
The purpose of this Work Procedure is to provide proper guidelines towards quality monitoring and
supervision of grouting work at site as per drawing and specification.
2. SCOPE
This work procedure includes grouting under base plates of machines and structural steel of the Project
site.
5. PROCEDURE
The following is the construction sequence
5.1 MATERIALS
5.1.2 Water -
Water used for mixing and curing shall be clean and free from deleterious materials confirming to
IS: 456.
For Pourable:
Water : Powder = 0.16 to 0.17 by weight ( 4.0 liters to 4.25 liters water per bag )
For Flowable:
Water : Powder = 0.17 to 0.18 by weight ( 4.25 liters to 4.5 liters water per bag).
5.2.3 Curing -
The exposed areas should be thoroughly cured by continuous application of water and / or
wet hessian cloth after final setting of grout .
.