CONTRACTOR

Environmental
Safety Control Project Manager
Control

Osamu Sawata

Environmental
Safety Manager
Manager
Mr. Relly M. Ms. Ydette
Luna Catong

Deputy Safety
Traffic Manager Assistant PCO
Manager
Construction
TBN TBN Quality Control
Team

Construction
Safety Supervisors Traffic Control Team QA Manager QC Manager
Manager
Mr. Arnel
Mr. Takafumi Obo TBN
Bautista

QA Engineer QC Engineer

Site Engineers Surveyor

SUBCONTRACTOR
1
Location Construction area Distance Month
7

PR5-108 to PR5-89 1008 6.0

Balagtas PR5-118 to PR6-20 1240 7.3

PR5-89 to PR5-61 1177 7.0

PR6- 95 to PR6-21 2932 17.4 LG(PR6-95 to PR6-5


Guiguinto

PR6- 110 to PR6-96 580 3.4

PR7- 80 to PR7-7 3391 20.1 LG(PR7-80 to PR7-7)


GBCA

PR7- 81 to PR7-93 626 3.7

PR7- 110 to PR7-120 760 4.5

Malolos PR7- 111 to PR7-93 1552 9.2 LG(PR7-110 to PR7-9

PR7- 7 to PR6-111 1066 6.3


2020 2021

2 3 4 5 6 7 8 9 10 11

8 9 10 11 12 1 2 3 4 5

LG(PR5-108 to PR5-89)

LG(PR5-118 to PR5-20)

LG(PR6-95 to PR6-50)

LG(PR6-110 to PR6-95)

LG(PR7-80 to PR7-7)

LG(PR7-113to PR7-1

LG(PR7-110 to PR7-93)
2021

12 13 14 15 16 17 18 19 20 21

6 7 8 9 10 11 12 1 2 3

LG(PR5-86 to PR5-61)

LG(PR6-50 to PR6-21)

o PR6-95)

LG(PR7-80 to PR7-92)

LG(PR7-113to PR7-120)

LG(PR7-7to PR6-110)
2022

22 23 24 25 26 27 28 29 30

4 5 6 7 8 9 10 11 12
Distance Duration
Location Construction area 1 2
(m) (Month)
Line 1
PR5-115 to PR5-89 1008 6.0

Balagtas PR5-118 to PR6-20 1240 7.3

PR5-89 to PR5-61 1177 7.0

PR6- 95 to PR6-21 2932 17.4


Guiguinto
PR6- 110 to PR6-96 580 3.4

PR7- 75 to PR7-7 3391 20.1

PR7- 76 to PR7-93 626 3.7

Malolos PR7- 110 to PR7-120 760 4.5

PR7- 111 to PR7-93 1552 9.2

PR7- 7 to PR6-111 1066 6.3


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Line 1

Line
2

Line 3

Line 4
21 22 23 24 25 26 27 28
First day
Location Item
7 8 9 10 11 12 13 14 15 16 17 18

Setting winch

n Span
Installation

Left Grouting

Setting Permanent
Plate and bolt

Transpotation PP

Setting winch

Installation

Right Grouting

Setting Permanent
Plate and bolt

n-1 Span
Transpotation PP
Second day Third day Forth day

7 8 9 10 11 12 13 14 15 16 17 18 7 8 9 10 11 12 13 14 15 16 17 18 7 8 9 10 11

n-1 Span
Forth day Fifth day Sixth day

12 13 14 15 16 17 18 7 8 9 10 11 12 13 14 15 16 17 18 7 8 9 10 11 12 13 14 15 16

n+1 Span

n Span
ay

17 18
1.Survey
Base line will be marked on the base concrete.
Pole for making alinement of PP(Precast Parapet) will be installed on the base concrete before starting .

2.Setting winch
3.Installation
Line1 Balagtus
Line2 Guiguinto
Line3 GBCA
Malolos
Line4 Malolos station

Balagtus
1008.356 1240 1177
22.5 45 56 53
4 180 6 224 7.5 212
5 225 7.5 280 9.3 265

PR5-115 PR5-118 PR5-89


40 40 42
PR5-114 PR5-119 PR5-88
40 40 58
PR5-113 PR5-120 PR5-87
40 40 42
PR5-112 PR5-121 PR5-86
40 40 40
PR5-111 PR5-122 PR5-85
40 40 40
PR5-110 PR5-123 PR5-84
40 40 40
PR5-109 PR5-124 PR5-83
40 40 40
PR5-108 PR5-125 PR5-82
35.5 40 40
PR5-107 PR5-126 PR5-81
35.428 40 40
PR5-106 PR5-127 PR5-80
35.5 40 40
PR5-105 PR5-128 PR5-79
35.5 40 40
PR5-104 PR5-129 PR5-78
35.5 40 40
PR5-103 PR6-1 PR5-77
35.428 40 40
PR5-102 PR6-2 PR5-76
PR5-102 PR6-2 PR5-76
35.5 40 40
PR5-101 PR6-3 PR5-75
40 40 40
PR5-100 PR6-4 PR5-74
40 40 40
PR5-99 PR6-5 PR5-73
40 40 40
PR5-98 PR6-6 PR5-72
40 40 40
PR5-97 PR6-7 PR5-71
40 40 40
PR5-96 PR6-8 PR5-70
40 40 40
PR5-95 PR6-9 PR5-69
40 40 40
PR5-94 PR6-10 PR5-68
40 40 40
PR5-93 PR6-11 PR5-67
40 40 40
PR5-92 PR6-12 PR5-66
40 40 40
PR5-91 PR6-13 PR5-65
40 40 40
PR5-90 PR6-14 PR5-64
40 40 40
PR5-89 PR6-15 PR5-63
40 40
PR6-16 PR5-62
40 40
PR6-17 PR5-61
40 35
PR6-18 PR5-60
40
PR6-19
40
PR6-20
Guiguinto
1750 580 1182
78 26 53
7.1 312 10.4 104 3.5 212 7.1
8.8 390 13.0 130 4.3 265 8.8

PR6-95 PR6-95 PR6-50


35 35 35
PR6-94 PR6-96 PR6-49
35 35 35
PR6-93 PR6-97 PR6-48
35 35 40
PR6-92 PR6-98 PR6-47
35 35 40
PR6-91 PR6-99 PR6-46
40 40 40
PR6-90 PR6-100 PR6-45
40 40 40
PR6-89 PR6-101 PR6-44
40 40 40
PR6-88 PR6-102 PR6-43
40 40 40
PR6-87 PR6-103 PR6-42
40 40 40
PR6-86 PR6-104 PR6-41
40 40 40
PR6-85 PR6-105 PR6-40
40 40 40
PR6-84 PR6-106 PR6-39
40 40 40
PR6-83 PR6-107 PR6-38
40 40 40
PR6-82 PR6-108 PR6-37
PR6-82 PR6-108 PR6-37
40 40 40
PR6-81 PR6-109 PR6-36
40 40 40
PR6-80 PR6-110 PR6-35
40 35
PR6-79 PR6-34
40 40
PR6-78 PR6-33
40 40
PR6-77 PR6-32
40 40
PR6-76 PR6-31
40 37
PR6-75 PR6-30
40 40
PR6-74 PR6-29
40 40
PR6-73 PR6-28
40 40
PR6-72 PR6-27
40 40
PR6-71 PR6-26
40 40
PR6-70 PR6-25
40 40
PR6-69 PR6-24
40 40
PR6-68 PR6-23
40 40
PR6-67 PR6-22
40 40
PR6-66 PR6-21
40 40
PR6-65 PR6-20
40
PR6-64
40
PR6-63
40
40
PR6-62
40
PR6-61
40
PR6-60
40
PR6-59
40
PR6-58
40
PR6-57
35
PR6-56
35
PR6-55
35
PR6-54
35
PR6-53
40
PR6-52
35
PR6-51
35
PR6-50
3391.051 626 1552.45
151 28 69
604 20.1 112 3.7 276 9.2
755 25.2 140 4.7 345 11.5

PR7-80 PR7-93 PR7-93


50 48 48 96
PR7-79 PR7-92 PR7-94
50 49 50 100
PR7-78 PR7-91 PR7-95
50 49 50 100
PR7-77 PR7-90 PR7-96
50 49 50 100
PR7-76 PR7-89 PR7-97
36.051 48 50 100
PR7-75 PR7-88 PR7-98
40 48 50 100
PR7-74 PR7-87 PR7-99
40 50 50 100
PR7-73 PR7-86 PR7-100
40 50 48 96
PR7-72 PR7-85 PR7-101
40 50 50 100
PR7-71 PR7-84 PR7-102
40 50 25 50
PR7-70 PR7-83 PR7-103
40 40 50 100
PR7-69 PR7-82 PR7-104
40 45 46.315 92.63
PR7-68 PR7-81 PR7-105
40 50 41.5 83
PR7-67 PR7-80 PR7-106
PR7-67 PR7-80 PR7-106
40 44 88
PR7-66 PR7-107
40 48 96
PR7-65 PR7-108
35 26.41 52.82
PR7-64 PR7-109
40 49 98
PR7-63 PR7-110
40
PR7-62
40
PR7-61
37
PR7-60
40
PR7-59
40
PR7-58
40
PR7-57
40
PR7-56
40
PR7-55
35
PR7-54
45
PR7-53
45
PR7-52
45
PR7-51
45
PR7-50
48
PR7-49
50
PR7-48
50
50
PR7-47
50
PR7-46
50
PR7-45
50
PR7-44
50
PR7-43
50
PR7-42
50
PR7-41
50
PR7-40
50
PR7-39
50
PR7-38
50
PR7-37
50
PR7-36
50
PR7-35
50
PR7-34
50
PR7-33
50
PR7-32
50
PR7-31
50
PR7-30
50
PR7-29
50
PR7-28
PR7-28
50
PR7-27
50
PR7-26
50
PR7-25
50
PR7-24
50
PR7-23
50
PR7-22
50
PR7-21
50
PR7-20
50
PR7-19
50
PR7-18
50
PR7-17
50
PR7-16
50
PR7-15
50
PR7-14
50
PR7-13
50
PR7-12
50
PR7-11
50
PR7-10
50
PR7-9
50
50
PR7-8
50
PR7-7
760 1066.042 14332.899
34 48
136 4.5 192 6.4
170 5.7 240 8.0
Quantity of Prec

PR7-110 PR7-7 Distance


50 50 50
14333
PR7-111 PR7-6
50 50 50
PR7-112 PR7-5
50 50 50
PR7-113 PR7-4
50 100 50
PR7-114 PR7-3
45 90 50
PR7-115 PR7-2
40 80 50
PR7-116 PR7-1
50 100 48
PR7-117 PR6-126
40 80 50
PR7-118 PR6-125
40 80 50
PR7-119 PR6-124
40 80 45
PR7-120 PR6-123
40
PR6-122
48
PR6-121
50
PR6-120
PR6-120
49
PR6-119
49
PR6-118
48
PR6-117
48
PR6-116
48
PR6-115
27.833
PR6-114
50
PR6-113
33.209
PR6-112
42
PR6-111
40
PR6-110
Nos
13732.899 27465.8 18310.53
Day Month Total
25 20 500

Quantity of Precast parapet Duration Product

Without
Total Nos Day Month Total nos/day
Station

13733 27465.8 18311 25 27 675 27


PR5-60 0
PR5-61 35
PR5-62 40
PR5-63 40
PR5-64 40
PR5-65 40
PR5-66 40
PR5-67 40
PR5-68 40
PR5-69 40
PR5-70 40
PR5-71 40
PR5-72 40
PR5-73 40
PR5-74 40
PR5-75 40
PR5-76 40
PR5-77 40
PR5-78 40
PR5-79 40
PR5-80 40
PR5-81 40
PR5-82 40
PR5-83 40
PR5-84 40
PR5-85 40
PR5-86 40
PR5-87 42
PR5-88 58
PR5-89 42
PR5-90 40
PR5-91 40
PR5-92 40
PR5-93 40
PR5-94 40
PR5-95 40
PR5-96 40
PR5-97 40
PR5-98 40
PR5-99 40
PR5-100 40
PR5-101 40
PR5-102 35.5
PR5-103 35.428
PR5-104 35.5
PR5-105 35.5
PR5-106 35.5
PR5-107 35.428
PR5-108 35.5
PR5-109 40
PR5-110 40
PR5-111 40
PR5-112 40
PR5-113 40
PR5-114 40
PR5-115 40
PR5-116 40
PR5-117 40
PR5-118 40
PR5-119 40
PR5-120 40
PR5-121 40
PR5-122 40
PR5-123 40
PR5-124 40
PR5-125 40
PR5-126 40
PR5-127 40
PR5-128 40
PR5-129 40
PR6-1 40
PR6-2 40
PR6-3 40
PR6-4 40
PR6-5 40
PR6-6 40
PR6-7 40
PR6-8 40
PR6-9 40
PR6-10 40
PR6-11 40
PR6-12 40
PR6-13 40
PR6-14 40
PR6-15 40
PR6-16 40
PR6-17 40
PR6-18 40
PR6-19 40
PR6-20 40
PR6-21 40
PR6-22 40
PR6-23 40
PR6-24 40
PR6-25 40
PR6-26 40
PR6-27 40
PR6-28 40
PR6-29 40
PR6-30 40
PR6-31 37
PR6-32 40
PR6-33 40
PR6-34 40
PR6-35 35
PR6-36 40
PR6-37 40
PR6-38 40
PR6-39 40
PR6-40 40
PR6-41 40
PR6-42 40
PR6-43 40
PR6-44 40
PR6-45 40
PR6-46 40
PR6-47 40
PR6-48 40
PR6-49 35
PR6-50 35
PR6-51 35
PR6-52 35
PR6-53 40
PR6-54 35
PR6-55 35
PR6-56 35
PR6-57 35
PR6-58 40
PR6-59 40
PR6-60 40
PR6-61 40
PR6-62 40
PR6-63 40
PR6-64 40
PR6-65 40
PR6-66 40
PR6-67 40
PR6-68 40
PR6-69 40
PR6-70 40
PR6-71 40
PR6-72 40
PR6-73 40
PR6-74 40
PR6-75 40
PR6-76 40
PR6-77 40
PR6-78 40
PR6-79 40
PR6-80 40
PR6-81 40
PR6-82 40
PR6-83 40
PR6-84 40
PR6-85 40
PR6-86 40
PR6-87 40
PR6-88 40
PR6-89 40
PR6-90 40
PR6-91 40
PR6-92 35
PR6-93 35
PR6-94 35
PR6-95 35
PR6-96 35
PR6-97 35
PR6-98 35
PR6-99 35
PR6-100 40
PR6-101 40
PR6-102 40
PR6-103 40
PR6-104 40
PR6-105 40
PR6-106 40
PR6-107 40
PR6-108 40
PR6-109 40
PR6-110 40
PR6-111 40
PR6-112 42
PR6-113 33.209
PR6-114 50
PR6-115 27.833
PR6-116 48
PR6-117 48
PR6-118 48
PR6-119 49
PR6-120 49
PR6-121 50
PR6-122 48
PR6-123 40
PR6-124 45
PR6-125 50
PR6-126 50
PR7-1 48
PR7-2 50
PR7-3 50
PR7-4 50
PR7-5 50
PR7-6 50
PR7-7 50
PR7-8 50
PR7-9 50
PR7-10 50
PR7-11 50
PR7-12 50
PR7-13 50
PR7-14 50
PR7-15 50
PR7-16 50
PR7-17 50
PR7-18 50
PR7-19 50
PR7-20 50
PR7-21 50
PR7-22 50
PR7-23 50
PR7-24 50
PR7-25 50
PR7-26 50
PR7-27 50
PR7-28 50
PR7-29 50
PR7-30 50
PR7-31 50
PR7-32 50
PR7-33 50
PR7-34 50
PR7-35 50
PR7-36 50
PR7-37 50
PR7-38 50
PR7-39 50
PR7-40 50
PR7-41 50
PR7-42 50
PR7-43 50
PR7-44 50
PR7-45 50
PR7-46 50
PR7-47 50
PR7-48 50
PR7-49 50
PR7-50 48
PR7-51 45
PR7-52 45
PR7-53 45
PR7-54 45
PR7-55 35
PR7-56 40
PR7-57 40
PR7-58 40
PR7-59 40
PR7-60 40
PR7-61 37
PR7-62 40
PR7-63 40
PR7-64 40
PR7-65 35
PR7-66 40
PR7-67 40
PR7-68 40
PR7-69 40
PR7-70 40
PR7-71 40
PR7-72 40
PR7-73 40
PR7-74 40
PR7-75 40
PR7-76 36.051
PR7-77 50
PR7-78 50
PR7-79 50
PR7-80 50
PR7-81
PR7-82
PR7-83
PR7-84
PR7-85
PR7-86
PR7-87
PR7-88
PR7-89
PR7-90
PR7-91
PR7-92
PR7-93
PR7-94
PR7-95
PR7-96
PR7-97
PR7-98
PR7-99
PR7-100
PR7-101
PR7-102
PR7-103
PR7-104
PR7-105
PR7-106
PR7-107
PR7-108
PR7-109
PR7-110
PR7-111
PR7-112
PR7-113
PR7-114
PR7-115
PR7-116
PR7-117
PR7-118
PR7-119
PR7-120
Balagtus Guiguinto GBCA
Gondora Castinng 12 12 12
Finishing 2 2 2
winch
Malolos Station
12
2
Survey and making construction joint

Installation rebar

Shifting gondola

Installation side form and adjust


elevation of form,

Installation anchor bolt for fixing PP

Casting concrete

Curing concrete

Removal form
Setting form of Precast parapet

Assembling rebar and installation it on the


form of PP

Casting concrete

Calumpit

Removal form

Transportation PP to site

Putting PP on the deck slab

Survey (checking elevation and


making alinement of PP)

Setting gondola and adjument trolly

Installation lifting frame and


Installation PP on the parapet base

Adjust alinement of PP by adjustment


trolley

Repeat Installation PP un
span
Shifting Gondola and setting
adjustment trolley
Shifting Gondola and setting
adjustment trolley

Injection mortar around anchor bolt


parapet

tion it on the

Calumpit

site

slab

on and
PP)

ent trolly

e and
pet base

adjustment

eat Installation PP until next

etting
y
etting
y

chor bolt