You are on page 1of 1

KEY PLAN

C B A

GENERAL NOTES:
1 1

LEGEND:

REFFERENCES

2 2
IFC NAME

SUBMITTAL

00 ISSUED FOR APPROVAL KLD G.S. G.S. 24-10-2020

REV DESCRIPTION DRWN. CHKD. APVD. DATE


PROJECT NAME & LOCATION:

3 3

DEVELOPER: / OWNER:
4 4

PMC :

5 5

CONSULTANT:

PROJECT DESCRIPTION:

GYM ISLAND

MAIN CONTRACTOR:

TROJAN GENERAL CONTRACTING L.L.C


P.O Box 111059, Abu Dhabi
United Arab Emirates
www.trojan.ae

PRECAST CONTRACTOR:

Hi-TECH Concrete
Products L.L.c
P.O. Box 109200,
Abu Dhabi , U.A.E
CONCRETE PRODUCTS TEL: +971 2 550 9112
FAX: +971 2 550 1227

6 6 DRAWING TITLE:

GROUND FLOOR LOADING MAP

DATE 24-10-2020 SCALE AS SHOWN

SERVICE LOAD SCHEDULE DWG


REV DRAWN BY:
No. HT-GYM-S-002 00 KLD

CHECKED BY
NORTH
LOAD MARKING SDL LL POINT G.S.
C B A

1 = 5.0 kN/m² = 5.0 kN/m²


1 GROUND FLOOR LOADING MAP
S-002 SCALE 1:75

2 = 7.5 kN/m² = 5.0 kN/m²

* L L :- SUPER IMPOSED LIVE LOAD ( kN/m²)


* SDL :- SUPER IMPOSED DEAD LOAD ( kN/m²)

You might also like