Professional Documents
Culture Documents
a
r
g
DESCRIPTION OF ESTIMATE
a
PT. KAMA JAYA ARIH ERSADA
Project : EXEL MANDIRI TECHNICAL D
Work : Electrical Work a
s INSTALATION COST
a MATERIAL COST
NO. DESKRIPSI PEKERJAAN UNIT QTY REMARK
r UNIT PRICE (IDR) AMOUNT (IDR) UNIT PRICE (IDR) AMOUNT (IDR)
M
A a
Direct Cost t
e
r
i
1 Jasa penarikan kabel, Penyambungan, dan terminasi
a
MCC Soy Fermentation M 170 l - - -
MCC Soy Process (Jasa Puling, Termination and Jointing (Cable By Owner) M 170 - - -
D
a
s INSTALATION COST
a MATERIAL COST
NO. DESKRIPSI PEKERJAAN UNIT QTY REMARK
r UNIT PRICE (IDR) AMOUNT (IDR) UNIT PRICE (IDR) AMOUNT (IDR)
M
a
IWW PIT (Complete Works & Material)) t
e
# NYY 4x25mm² M r
37 ### 357,143 13,214,286 30,000 1,110,000
i
# NYA 1C-16mm² M ### 92,857 - -
a
l
Cable NYY 5C x 16mm Haspel 1 - - 14,000,000 14,000,000
- PP - Moromi Distribution
- PP - Wheat Roasting -
- PP - Conveyor -
D
a
s INSTALATION COST
a MATERIAL COST
NO. DESKRIPSI PEKERJAAN UNIT QTY REMARK
r UNIT PRICE (IDR) AMOUNT (IDR) UNIT PRICE (IDR) AMOUNT (IDR)
M
a
2.1 Cable Rack t
e
Cable Rack SLW 300mm x 100mm M r
150 ### 300,000 45,000,000 90,000 13,500,000
i
Cable Rack SLW 500mm x 100mm M 150 ### 345,833 51,874,875 103,750 15,562,463
a
l 56,250,000
Cable Rack SLW 600mm x 100mm M 150 ### 375,000 112,500 16,875,000
D
a
s INSTALATION COST
a MATERIAL COST
NO. DESKRIPSI PEKERJAAN UNIT QTY REMARK
r UNIT PRICE (IDR) AMOUNT (IDR) UNIT PRICE (IDR) AMOUNT (IDR)
M
a
Conduit E-75 M 100 ###
t 302,916 30,291,625 90,875 9,087,488
e
2.3 Fleksible Conduit r
i
Fleksible Conduit E-19 M 5 ### 13,125 65,625 3,938 19,688
a
l 312,500
Fleksible Conduit E-25 M 20 ### 15,625 4,688 93,750
Jointing Point 50