Professional Documents
Culture Documents
Fixed timings:
Earliest/latest H Hour:
Movement:
Time available:
O group Timing:
Quick Mission Analysis
What do I have to do? Where?
Probable Mission
Coy Mission
Pl Missions
Other Units
Timings
Grp
NMB
No of minutes NTM
O Grp
Location
Time
CSS
For CSM
CQMS
Csup Collections
Eqpt Care
Acknowledge
Pl Comds 2ic HQ Coy CSM CQMS
Estimate Orders
Question 1 Situation Enemy Forces
WHAT IS THE SITUATION AND HOW DOES IT AFFECT ME? Ground and enemy (Describe
Gnd)
How does the ground affect en operations?
Routes
Urban wider than 500m
Woods Trees <5cm, Trees >5cm, Gaps Trees >15-20cm, Objectives
<5m Gaps <5m
Gaps >5m
Killing areas/Cover/ Dead
Slopes <30% 30%-50% >50% Ground
Water Width <1.5m, Width 1.5-15m, Width >15m, Key terrain/vital ground
Current <1.5m/s, Bank > 1.2m,
Depth <0.6m
Depth 0.6-1.2m Current >1.5m/s,
Depth >1.2m
Going/Obstacles
b) Weather Template
Weather & NBC effects Tactics/Doctrine
2) THREAT EVALUATION
Weapons/Eqpt
a) Enemy thread schematic
b) Doctrine overlay DF's
3) THREAT INTEGRATION
c) Doctrine (Formation of units)
- Timeline for En doctrine Air threat
NBC Capability
Morale/Strengths and
Weaknesses
1 Up - BG Cmdr’s Mission
Direct
Fire Support Plan
Indirect (DFs) Arty/Air/Mor
Smoke/illum
Flanks
STAP
CSS (C sups, ES, med, replen;Demand, Distance,
Duration)
Civilians and Refugees
Details of?
Allegiance
Numbers
Actions on
TASK ORG
Pl 1 Pl 2 Pl3
GPMG Armd Troop
Mor Antitank Pl
GPMG
COY MISSION
My Intent?
EFFECT - WHO?
Location of Coy HQ
Reserve
OPs
MILAN
Mors
Reserve
Tasks for Saxons
Fire power -
Direct Fire weapons
Will Engage-
Comms (EMCON?)
Constraints on freedom
Include a reserve, or ask for one Tasks for own reserve, or do you need a higher
formation resrve?
CSS C Sups
Priority for Log Sp/ Med/ ES/PoWs AMMO
Demand Distance Duration Destination RATIONS
WATER
Identify possible future tasks / resources / plan IPE
ahead CAD
Batteries
POL
MEDICAL
CAP
RAP
CASEVACS
Med Packs
Morphine
Stretchers
Maint and EC
Comms
Vehs
Rep Vehs Ready By
Weapons
Question 6 Co-ordinating Instructions (timings, locs and fire plan)
WHERE CAN WE BEST ACCOMPLISH
EACH ACTION / EFFECT? Prelim Movs
OOMs
Co-ordinate the actions of all manoeuvre, direct
and indirect fire support in time AND space. Recce
Cfm O Grp
Liaison
Draft integration / synch matrix
Posn Occupied
Consider:
Digging Stages
Scheme of manoeuvre
Fire Plan
Arty
Boundaries Mors
DFs
Adjustment
Report Lines Close Air Support
Aviation
AD
Limit of Exploitation GPMG(SF)
Counter Attack
NTM
Trace
Field Defence
Liaison with Engrs?
Priority of Work
Extent of Work
Work Parties
Mine Fields
Co-ordinating Instruction cont
Wiring
Comms
Fds of fire
Stores RV
Cratering
Route Denial
Illumination Point
Ptls
In
Fwd of Posn
Out
Track Discipline
Runner routes
Sentries
Day/Night
Air/Chemical
Ground
Roster
OPs?
Summary
Notes: