Professional Documents
Culture Documents
Arrtival Port Checklist: Beuris-Northern Group
Arrtival Port Checklist: Beuris-Northern Group
JPMC MANAGEMENT
MV “ODA CHURO”
Things that are to be done by the Duty Engineer on Receiving One hour notice from the Bridge √/× Remarks
5Ensure the power is available for deck machinery and bow thruster.
7. Take a round of steering gear room and check oil level linkages and motor current.
8. Start the boiler and raise the pressure, if exhaust gas boiler was running previously.
9. Close the dampers for exhaust gas boiler and open bypass.
13. Change over to high sea suction from low sea suction.
15. The engine is tested for ahead and astern direction from bridge.
16. The steering gear is also tested for full rudder angle.
17. When maneuvering ends, sea passage flow meter counter is taken for calculation of oil
consumption from full away to end of sea passage.
BNSM
BEURIS-NORTHERN GROUP
JPMC MANAGEMENT
MV “ODA CHURO”
Things to do After the Ship Has Arrived at the Port √/× Remarks
1. When finished with engine is given from bridge change over from bridge control to
engine room control.
2. Stop additional running generator. However, make sure that the generator that is
running is able to take all the load.
3. Close main air starting valve.
BNSM